Each one in plain English, with the numbers worked through for a shareholder.
10 May 2012well test result▲ Good
Initial rates reported: Cottonwood A No. 1 313 boepd (22-day), Live Oak No. 2 289 boepd (16-day), Aloe Vera No. 2 177 boepd (24-day). Ray No. 5 made 178 boepd on day two. Aloe Vera No. 3 and Yucca No. 2 finished drilling; Archer 16 is above 40 bopd.
Cottonwood A No. 1 hit a peak 24-hour rate of 325 bopd, about 542 boepd with gas (earlier estimate near 500). Live Oak No. 2 peaked above 400 bopd, the best oil rate in Southern Star. Ray No. 5 and Archer 16 are flowing back.
March net output fell to 1,027 boepd from 1,154 in February, which the company attributes to expected gas curtailment. It expects new wells to lift output from mid-April, and still targets 2,500 boepd by end-2012. Cottonwood A is estimated at 400 boepd.
Cottonwood A No. 1 produced 267 bopd, estimated over 400 boepd with gas, the best rate Antares has achieved in Southern Star. Live Oak No. 2 made over 150 bopd. Archer 16 No. 1 frac is done and Ray No. 5 is being fracked.
Cottonwood A No. 1 and Aloe Vera No. 2 each now produce over 100 boepd while still cleaning up. Live Oak No. 2 flows over 150 boepd. CR-21 No. 4 hit TD at 10,293 ft; Archer 16 cores show good Wolfcamp quality and its frac is underway.
CR-21 No. 4 is drilling near 10,055 ft. Yucca No. 1 frac is underway, Live Oak No. 2 frac is complete, and Cottonwood A No. 1 and Aloe Vera No. 2 are still flowing back with rising oil cut. No rates are given yet.
Administrative notice: convertible note interest of $0.0488 per note is payable 30 April 2012, record date 20 April. Slightly lower than the previous $0.0504 quarterly payment.
Unquoted performance rights lapsed (666,667 and 2,500,000) as vesting conditions were not met. Directors' holdings fall accordingly; shares stay at 260m, with 7.5m convertible notes and 5m performance rights remaining.
Antares drew a third US$10m from its US$200m Macquarie facility, bringing the total drawn to US$30m. It still plans US$50m drawn by end-2012 to fund the 30-well program, which would hold all of Southern Star by production.
Reserve summary for 31 Dec 2011 shows 1P up 2,209% from 674 Mboe in 2010, 2P up 1,795% and 3P up 2,068%, using $95.25/bbl oil. Gives per-share cash-flow values on 260m shares. Headline volumes are in the annual report and evaluation.
2011 annual report: 1P reserves 15,566 Mboe (up 2,209%), 2P 27,195 Mboe, 3P 42,621 Mboe. Sales revenue A$8.92m (+131%); production 145,602 boe. US$30m drawn on Macquarie facility; 260m shares after buy-back. The A$1.00 share price target for end-2011 was missed. No new shares planned for two years.
Full independent-style reserve and resource evaluation as of 31 Dec 2011, explaining SPE-PRMS definitions. The excerpt shown contains definitions only; the figures appear in the companion summary and annual report (1P 15,566 Mboe, 2P 27,195 Mboe).
Archer 16 No. 1 (Northern Star) reached TD of 11,362 ft, with frac due 18 April. Ray No. 5 reached 10,311 ft, frac 25 April. Live Oak No. 2 frac is underway and Yucca No. 1 frac is set for 11 April. No production rates yet.
February net output averaged 1,154 boepd, up slightly from 1,138 in January; no new wells came online in 2012. Management expects new-well output from April and still targets 2,500 boepd by end-2012. March gas is expected lower due to gas gathering curtailment.
22 Mar 2012asset acquisition disposition▲ GoodMajor
Antares bought Dinero's 1.3-2.7% working interests across most Southern Star leases, plus 224 net acres (320 gross) in western Howard County worth eight more drilling locations. No price given. It adds a little control and acreage to Southern Star.
Yucca No. 1 reached TD of 10,342 ft, with hydrocarbons logged in several zones, and will be fracked mid-April. Cottonwood A No. 1 and Aloe Vera No. 2 are flowing back with no rates yet. Archer 16 No. 1 may stop at about 11,200 ft.
Three rigs are now running together, a company first. Yucca No. 1 is at 8,394 ft, Ray No. 5 at 3,017 ft and Archer 16 No. 1 at 4,803 ft with intermediate casing being set. No new results.
Cottonwood A No. 1 frac is done and Aloe Vera No. 2 is being fracked. Yucca No. 1 is at 7,147 ft, Ray No. 5 is about to spud, and Archer 16 No. 1 will make three rigs running at once, a company first.
January net output averaged 1,138 boepd, down from 1,204 in December and 1,242 in November. Coyote No. 1 first produced in mid-February at 70 boepd, and Live Oak No. 1 is awaiting repairs, leaving the field about 100 boepd.
Yucca No. 1 has started drilling at Southern Star. Halliburton will frac Cottonwood A No. 1 and Aloe Vera No. 2 the week of 5 March. Archer 16 No. 1 is still expected to start in March.
Live Oak No. 2 reached TD of 10,308 ft with good shows in all main Wolfberry zones, and will be fracked in late March. Archer 16 No. 1 (Northern Star, 100%) is due to spud in March, to 12,400 ft.
Live Oak No. 2 has set intermediate casing and is drilling at about 5,400 ft. The Cottonwood A No. 1 frac is pushed to the second week of March, with Aloe Vera No. 2 to follow.
Cottonwood A No. 1 reached TD of 10,320 ft, the second of 24 planned 2012 Southern Star wells. Live Oak No. 2, the third, has started drilling. Fracs remain planned for early March.
Aloe Vera No. 2 reached TD of 10,282 ft in under 12 days, the first of 24 planned 2012 Southern Star wells. Windmill No. 1 is producing over 125 boepd with gas rising. Fracs for the new wells are planned for early March.
Antares drew a second US$10m from the US$200m Macquarie facility, after the first on 16 December. It still plans US$50m drawn by end-2012 for the 30-well program, which would hold all of Southern Star by production.
Live Oak No. 1 (48.6%) peaked at 165 bo and 495 mcf a day, about 250 boe per day, after its early December frac. Two rigs are now drilling Cottonwood A No. 1 and Aloe Vera No. 2 at Southern Star.
Coyote No. 1 frac is complete and the well goes straight to production. Cottonwood A No. 1 drilling was delayed by snow and mud. A second rig arrives in about a week for Aloe Vera No. 2, an offset to a well with over 200 MBoe expected recovery.
December net output averaged 1,204 boepd, slightly below November's 1,242. Live Oak No. 1 is making 45 bopd while flowing back, and Coyote No. 1 is still shut in awaiting its frac.
Woodward 7 No. 1 (Big Star) completed a nine-stage frac and is being put on production; pays were indicated in several zones including Dean clastics. Coyote No. 1 gets its upper frac this week, and Cottonwood No. 2 is about to spud.