Stockle - the stock oracle

Blue Star Helium Ltd

ASX:BNL
A$0.004Close 7 Oct 2026 · delayed

Past year: ▼ 35%(0.30c – 0.80c AUD)

Market cap
A$24.6m
Shares on issue
6.15bn
In-ground value
A$1.08bn
Risked multiple
17.89×
Story beats
242 since 2006
Last event
31 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

27 Sept 2012other● Neutral

Administrative notice: Antares moved its West Perth office to 20 Kings Park Road with a new phone number. No business substance.

Discuss in chat

26 Sept 2012debt financing● Neutral

Antares drew a fifth USD12.5m from its USD200m Macquarie facility (LIBOR+4%, 36 months), larger than earlier USD10m draws. Funds Southern Star plus Northern Star and Big Star development. Continues staged drawdowns; by arithmetic this implies about USD52.5m drawn in total (inference).

Discuss in chat

26 Sept 2012production update▼ Bad

August net output was 2,109 boepd, down from 2,435 in July (oil 27,448 bo, gas 162,513 mcf), attributed to no new wells and workovers. Current rate is over 2,300 boepd. Ray No. 6 frac now set for 1 November, later than mid-October.

Discuss in chat

20 Sept 2012drilling progress report● Neutral

Dagwood No. 1 (50%) and McCann No. 2 (50%) fracs done; Alamo No. 2 frac set for 26 Sep, Ray No. 6 mid-October. Cozart 19 No. 1 Fusselman test due in several weeks, Wolfberry frac late October. No new rates.

Value this in the calculator →Discuss in chat

13 Sept 2012drilling progress report● Neutral

Dagwood No. 1 frac done and flowing back; McCann No. 2 frac finishing. Alamo No. 2 frac set for 26 Sep, Ray No. 6 for mid-October. Cozart 19 No. 1 frac is late October and Debnam 22 No. 1 slipped to mid-November. No new rates.

Value this in the calculator →Discuss in chat

13 Sept 2012half year report● Neutral

Half-year to 30 June 2012: revenue A$10.755m (vs A$3.478m), net loss A$1.174m versus a A$0.8m profit a year earlier. Borrowings rose, total liabilities A$58.4m; net assets A$87.0m (A$88.7m at end-2011).

Discuss in chat

5 Sept 2012investor presentation● Neutral

Good Oil Conference presentation by the CEO. It restates 2,435 boepd production, reserves 1P 14.1, 2P 24.8 MMboe and Southern Star held by production. It says a reserve update as at 30 June will come by 30 September. Little new.

Discuss in chat

30 Aug 2012security holder rights change● Neutral

Antares cancelled 1,000,000 shares bought back on-market for about A$394,000. Shares on issue fall to 257,000,000. The buy-back continues.

Discuss in chat

29 Aug 2012drilling result▲ GoodMajor

With Alamo No. 2 drilled, all drilling needed to hold the Southern Star project by production is complete. Four drilled wells (Dagwood No. 1, McCann No. 2, Ray No. 6, Alamo No. 2) still await fracs. Resolves the lease-holding goal.

Value this in the calculator →Discuss in chat

22 Aug 2012production update▲ Good

July net output was 2,435 boepd, up from 2,026 in June (oil 34,429 bo, gas 175,973 mcf). Company now expects the 2,500 boepd target 'in the near term', where it had earlier said by year-end 2012.

Discuss in chat

17 Aug 2012drilling progress report● Neutral

McCann No. 2 finished drilling at 10,280 ft with hydrocarbons logged; frac set for 26 September. Cozart 19 No. 1 logs and 60 sidewall cores completed. McNew No. 2 flowing 90 bopd. IP rates still pending.

Value this in the calculator →Discuss in chat

9 Aug 2012drilling progress report● Neutral

Dagwood No. 1 reached 10,297 ft and Cozart 19 No. 1 reached 12,557 ft; Alamo No. 2 started drilling. Debnam 22 No. 1 frac slipped from late August to late October. IP rates for Coyote No. 2, McNew No. 2 and Alamo No. 1 are still pending.

Value this in the calculator →Discuss in chat

2 Aug 2012drilling progress report● Neutral

Coyote No. 2 pumping equipment installed, IP pending. Dagwood No. 1 is at 8,387 ft, McCann No. 2 at 4,000 ft, Cozart 19 No. 1 at 11,404 ft. McNew No. 2 flowing 66 bopd. No new IP results.

Value this in the calculator →Discuss in chat

26 July 2012drilling progress report● Neutral

Coyote No. 2 ten-stage frac completed. Dagwood No. 1 (50%) and McCann No. 2 (50%) started drilling, Cozart 19 No. 1 is at 4,803 ft. McNew No. 2 is flowing 50 bopd. No official IP rates yet.

Value this in the calculator →Discuss in chat

26 July 2012debt financing● Neutral

Antares drew a fourth USD10m from its USD200m Macquarie facility (LIBOR+4%, 36 months), funding the Permian drilling program to hold Southern Star by production by 31 Dec 2012. Continues the staged drawdowns; the Quarterly Report later shows USD40m drawn in total.

Discuss in chat

20 July 2012production update▲ Good

June net output was 2,026 boepd, up about 12% from 1,816 in May; first half of July averaged over 2,386 boepd. The company maintains its 2,500 boepd end-2012 target.

Discuss in chat

19 July 2012drilling progress report▲ Good

Aloe Vera lease now makes 284 bopd (up from ~100) and Yucca lease averaged 262 bopd over 10 days. Coyote No. 2 and Ray No. 6 finished drilling (10,263 and 10,306 ft); Debnam 22 No. 1 reached 11,482 ft with hydrocarbons logged; Cozart 19 No. 1 spud.

Value this in the calculator →Discuss in chat

13 July 2012security holder rights change● Neutral

Antares cancelled 1,950,000 shares bought back on-market for about A$750,000. Shares on issue fall to 258,000,000 from 259.95m. The buy-back continues.

Discuss in chat

13 July 2012well test result▲ Good

Aloe Vera lease now produces 228 bopd, up from about 100, after Aloe Vera No. 3 connected. Yucca lease produces 284 bopd, up from about 75, after Yucca No. 2. Alamo No. 1 frac is done. Debnam 22 No. 1 is near 11,200 ft.

Discuss in chat

9 July 2012other● Neutral

Administrative notice: convertible note interest of $0.0504 per note is payable 31 July 2012, record date 23 July. No new substance.

Discuss in chat

6 July 2012drilling progress report● Neutral

Ray No. 6 spud 30 June, 0.3 miles from Ray No. 5, which averaged over 500 boepd in June. Yucca No. 2 flowing at 80% oil cut and Aloe Vera No. 3 at 50%. Debnam 22 No. 1 drilling at 7,076 ft. No official IP rates yet.

Value this in the calculator →Discuss in chat

28 June 2012drilling spud● Neutral

Debnam 22 No. 1 started drilling in Northern Star (planned depth 11,500 ft, frac 15 August), the first follow-up to the Archer 16 result. Coyote No. 2 reached 10,263 ft. McNew No. 2 frac is done; Aloe Vera No. 3 and Yucca No. 2 still flowing back.

Value this in the calculator →Discuss in chat

27 June 2012production update▲ GoodMajor

May net output jumped to 1,816 boepd from 1,068 in April, up 70%, as 2012 drilling-program wells came on and gas curtailment ended. Company says 30-day rates beat its type curve and reiterates the 2,500 boepd end-2012 target.

Discuss in chat

21 June 2012drilling progress report● Neutral

Aloe Vera No. 3 and Yucca No. 2 (ten-stage frac done) are flowing back. McNew No. 2 is being fracked. Alamo No. 1 frac is set for 10 July. Coyote No. 2 is drilling at 7,197 ft. No rates yet.

Value this in the calculator →Discuss in chat

20 June 2012security holder rights change● Neutral

Antares cancelled 50,000 shares bought back on-market for about A$19,755. Shares on issue fall to 259,950,000 from 260m. Buy-back continues.

Discuss in chat

13 June 2012drilling progress report● Neutral

Aloe Vera No. 3 frac done and plugs being drilled out. Yucca No. 2 is being fracked. Alamo No. 1 reached 10,260 ft with frac set for 5 July. Coyote No. 2 started drilling. McNew No. 2 frac is scheduled for 20 June. No new production rates.

Value this in the calculator →Discuss in chat

7 June 2012well test result● Neutral

Archer 16 No. 1 peaked at 117 bopd (137 boepd) but its 20-day rate is only 65 boepd, softer than the 90 bopd earlier reported. Ray No. 5 is above 500 boepd, the best 30-day rate Antares has achieved in the Permian. Aloe Vera No. 3 frac this week.

Discuss in chat

28 May 2012production update▲ Good

April net output was 1,068 boepd, up slightly from 1,027 in March. Two new compressors in early May lifted all Southern Star gas curtailment. The company says 30-day well rates beat its type curve and keeps its 2,500 boepd end-2012 target. Alamo No. 1 spud 25 May.

Discuss in chat

24 May 2012well test result▲ GoodMajor

Archer 16 No. 1 (Northern Star) is flowing over 90 bopd, which the company calls commercial and says supports more wells there this year. 30-day rates: Live Oak No. 2 313 boepd, Cottonwood A 246, Aloe Vera No. 2 184. Ray No. 5 15-day rate is 387 boepd.

Discuss in chat

16 May 2012investor presentation● Neutral

AGM chairman's address and slides repeat known figures: 1P 15,566 Mboe, 260m shares, US$30m drawn, A$1.00 target still unmet. Slides add current production of 1,900 boepd, A$8.934m cash at 31 March and 10 wells drilled in 2012. No new shares planned for two years.

Discuss in chat