Stockle - the stock oracle

Strike Energy Ltd

ASX:STX
A$0.105Close 7 Oct 2026 · delayed

Past year: ▼ 5%(9.70c – 12.5c AUD)

Market cap
A$378m
Shares on issue
3.60bn
In-ground value
A$1.24bn
Risked multiple
0.96×
Story beats
352 since 2006
Last event
31 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

6 Apr 2022material agreement▲ GoodMajor

Strike signed a gas sales agreement to supply 14.6 PJ to Perth Energy (AGL) over 5 years, expected to start in 2024, from its Perth Basin gas. It is conditional on usual greenfield-development conditions. Strike's first named domestic gas sale of this scale in the provided history.

Discuss in chat

28 Mar 2022joint venture update● Neutral

Joint venture partner Talon (45% of Walyering) repeats Strike's 25 March results. It expects testing to upgrade resources and allow its maiden gas reserve booking. Nothing new on the field itself.

Discuss in chat

25 Mar 2022well test result▲ Good

Walyering-5 testing began: the D-Sand was perforated and flowed wet gas at about 7 mmscf/d (constrained by equipment), with 4,516 psi reservoir pressure and no H2S. Walyering-6 is permitted, with drilling expected in May. Full four-sand test still pending equipment.

Discuss in chat

23 Mar 2022investor presentation● Neutral

Australian Domestic Gas Outlook conference presentation. Text provided is garbled diagram labels only; nothing new can be read.

Discuss in chat

8 Mar 2022investor presentation● Neutral

Euroz Rottnest conference presentation. Text provided is only diagram labels on the gas supply chain; nothing new can be read.

Discuss in chat

7 Mar 2022other● Neutral

Text not readable. Title suggests South Erregulla success unlocking Project Haber, but no content is available, so nothing can be confirmed here.

Discuss in chat

1 Mar 2022drilling progress report● Neutral

SE1 recovered about 45m of Kingia core with gas shows during coring; it has gone to the lab. Drilling resumes to final depth in the Holmwood Shale, then wireline logging. No results from the core yet.

Value this in the calculator →Discuss in chat

25 Feb 2022drilling progress report▲ Good

South Erregulla-1 reached the primary Kingia Sandstone at 4,859m, with gas shows and drilling breaks in the interpreted high-quality top section. Coring of 45m comes next. No flow or resource figure yet, but it is the first sign at the main target.

Value this in the calculator →Discuss in chat

23 Feb 2022director officer appointment● Neutral

Deputy Chairman Nev Power has requested and been granted a leave of absence from the board until further notice. No reason is given in the text. Follows the October 2021 court summons notice, though the text does not link them.

Discuss in chat

23 Feb 2022half year report● Neutral

Half-year report to 31 Dec 2021. The text provided covers the directors' report opening only: focus on the West Erregulla NSAI reserve (300 PJ 2P gross, 150 PJ net), Walyering appraisal, Haber pre-FEED and SE1 preparation. Financial figures are truncated and not shown.

Discuss in chat

22 Feb 2022drilling progress report● Neutral

SE1 has cased and pressure tested the intermediate section and is drilling the production section at 4,535m, heading for the Kingia Sandstone, where coring is planned. No new result.

Value this in the calculator →Discuss in chat

17 Feb 2022drilling result▲ GoodMajor

SE1 confirmed a conventional gas discovery in the Wagina Sandstone: 160m of gas-charged sand, 16m net pay in high-quality flow units and 61m lower-quality gasifier, pressure over 7,500 psi. Strike calls it an upside to the main Kingia target; no resource figure yet, flow testing needed.

Value this in the calculator →Discuss in chat

16 Feb 2022drilling progress report▲ Good

Walyering-5 flow test equipment arrives late February, with a 15-20 day test of four sands. Core permeability was upgraded to 280mD. Walyering-6 long lead items and rig slot secured. Concept is now 2 wells and up to 30 TJ/d, up from the earlier 20 TJ/d.

Value this in the calculator →Discuss in chat

14 Feb 2022drilling progress report▲ Good

SE1 reached 4,421m and hit strong gas flows in the Wagina Sandstone, with preliminary data suggesting a conventional gas reservoir; wireline testing will assess significance. It also found 103m of net Jurassic sandstone, a potential carbon storage reservoir. Kingia target not yet reached.

Value this in the calculator →Discuss in chat

10 Feb 2022investor presentation● Neutral

Bell Potter conference presentation (February 2022) on Strike's gas, fertiliser and renewables strategy. It refers back to previously announced reserves and resources; the text provided shows nothing new.

Discuss in chat

2 Feb 2022regulatory community update▲ Good

The Federal Government granted Project Haber Major Project Status, giving access to the Major Projects Facilitation Agency for approvals support. Strike says this completes State and Federal recognition. It does not remove Haber's dependence on proving gas at South Erregulla, finance and binding offtake.

Discuss in chat

21 Jan 2022quarterly activities report● Neutral

December quarterly: Walyering-5 cased and suspended ahead of Q1 flow test; SE1 spudded; Haber got grant and government support; geothermal permit applied for (1,750 km²). West Erregulla environmental approvals expected during CY22. CEO says Walyering first cashflow could come by end of 2022. Mostly restates known items.

Discuss in chat

17 Jan 2022drilling spud● NeutralMajor

South Erregulla-1 spudded 15 January 2022 and was drilling at 1,045m. Strike expects the Kingia Sandstone at 4,369m, up to 200m shallower than at West Erregulla-2. The well, 100% Strike, targets about 350 PJ to supply Project Haber.

Value this in the calculator →Discuss in chat

10 Jan 2022drilling progress report● Neutral

The Ensign 970 rig is fully mobilised to South Erregulla-1, with spud expected within the week. Minor delay came from getting crew through quarantine before WA border closures. This slips the late-December spud target slightly. SE1 aims to prove about 350 PJ for Haber.

Value this in the calculator →Discuss in chat

15 Dec 2021regulatory community update▲ GoodMajor

Project Haber won a $2m federal Supply Chain Resilience grant and WA Lead Agency Status. Strike has committed to negotiate a full-form offtake for 100% of the 1.4 mtpa, conditional on South Erregulla-1 success. SE1 spud targeted late December; FEED early works and tender started.

Discuss in chat

8 Dec 2021drilling result▲ Good

Walyering-5 is cased and pressure tested, with gross cost about $8.5m, under budget. Strike targets a fast, low-capital restart, with a concept of up to 20 TJ/d from about 2 wells, subject to the Q1 2022 test. Ocean Hill and Jurassic leads are upgraded in confidence.

Value this in the calculator →Discuss in chat

6 Dec 2021drilling result▲ Good

Partner Talon's release repeating Strike's Walyering-5 result: four gas sands, 51m net pay, 45% interest. It adds Talon's own view and its Condor prospect, but nothing new about Strike's position.

Value this in the calculator →Discuss in chat

6 Dec 2021drilling result▲ GoodMajor

Walyering-5 confirmed four gas-charged sands with 51m net pay, under 1% CO2, and results Strike says exceeded pre-drill expectations. No gas-water contact seen yet. A Q1 2022 production test will feed an independent resource statement.

Value this in the calculator →Discuss in chat

29 Nov 2021drilling progress report▲ Good

Walyering-5 reached 3,435m total depth in 13 days, 8 days ahead of schedule. Elevated gas and good-quality sands were seen in the A, B and deeper C sands. Wireline logs are running to establish significance.

Value this in the calculator →Discuss in chat

24 Nov 2021drilling progress report● Neutral

Walyering-5 reached 2,380m and 9-5/8 inch casing is cemented and pressure tested. Strike is preparing to drill the final section to 3,274m, expecting the main A and B sands at about 3,073m and 3,195m. No new result yet.

Value this in the calculator →Discuss in chat

15 Nov 2021drilling spud▲ GoodMajor

Walyering-5 spudded at 16:15 on 14 November 2021 and was drilling ahead at 483m, aiming for 3,138m subsea to test updip potential of the Walyering wet-gas discovery. This follows the earlier delay waiting for the rig. Strike holds 55%, Talon 45%.

Value this in the calculator →Discuss in chat

15 Nov 2021agm notice● Neutral

AGM address and presentation. The chairman acknowledges reserves may have fallen short of market expectations and the share price fell. South Erregulla-1 is now to be drilled in early 2022, and Haber FEED hoped for 2022 if successful. Slips earlier Q4 timing.

Discuss in chat

4 Nov 2021investor presentation● Neutral

Text not readable.

Discuss in chat