18 Oct 2006drilling result▼ Bad
Sun Resources repeats that the Eagle North-1 workover failed to free the damaged production valve at 3,963 m, so the well is being suspended for a future sidetrack. A new operator and partner will be sought, and Sun is weighing whether to farm down. Lakes holds 15%.
Operator Victoria Petroleum says the Eagle North-1 workover is abandoned: the stuck production valve and guns could not be retrieved, so the 72 m of cased pay stays untested. Partners will plan a future re-entry and sidetrack instead. Lakes holds 15%.
Victoria Petroleum confirms it now holds a one-third stake in Greenearth Energy, alongside Lakes, completing the venture announced in July. Greenearth starts with $750,000 and will apply for Victorian geothermal permits.
Lakes Oil's 2006 financial report for the year to 30 June lists directors Annells, Dunn, Lawrence and Syme, and records Robert Love leaving as secretary/CFO on 27 July and Raymond South joining on 30 August. The visible text carries no financial figures.
A workover rig reached Eagle North-1 and found the perforating guns appear not to have fired in the first test, so the cased 72 m remains untested. Fourteen days of cleanout come first, then a new gun run. Lakes holds 15%.
Sun Resources repeats that the Eagle North-1 workover rig began on 18 September and the perforating guns appear not to have fired. It expects a further hiatus before retesting, while the cause is established. Lakes holds 15%.
Presentation to the 18 September general meeting restating the Victorian permits and Wombat and Loy Yang production forecasts. It notes plans for 3D seismic over Wombat/Trifon. No new results or decisions in the text provided.
Raymond E South has been appointed Company Secretary of Lakes Oil, effective immediately. The text does not say what this means for Robert Love, previously company secretary and CFO.
Quarterly report to 30 June 2006: the PEP 157 retention lease was still awaited and Boundary Creek-2 was waiting on fracture equipment. Loy Yang-2 was assessed as an excellent fracture candidate with planning underway, and two Baragwanath tight gas wells and Alberton 1 and Napier 1 in PEP 158 depended on rig availability.
Lakes extended its Share Purchase Plan to 9 August, with over $2.3m received so far at 1.5 cents. It says the Eagle North-1 workover rig is scheduled to return mid-August; the well remains untested.
Lakes and Victoria Petroleum will each take a one-third stake in new company Greenearth Energy, initially capitalised at $750,000, to apply for Victorian geothermal permits in October. A prospectus is expected in early 2007. This follows Lakes' earlier stated geothermal intent.
28 June 2006capital raising announcement● NeutralMajor
Lakes offers shareholders a Share Purchase Plan at 1.5 cents per share, up to $3,600 each, closing 26 July. The first $1m is underwritten by Intersuisse for a 6% fee. Funds go to the PEP 163 seismic, PEP 158 wells, Eagle North-1 costs, fracture stimulation and Hunters Lane.
Lakes' shareholder brochure restates its tight gas story: over $30m spent in PEP 157, a retention lease application over about 75% of it, and Sinopec due diligence with negotiations expected July/August. The next stage needs an estimated $15-20m, beyond its means; it hopes partners will fund it.
Operator says securing a completion rig and coiled tubing unit for Eagle North-1 is still continuing, delayed by heavy equipment demand around Bakersfield. No results yet; a release will follow testing. Lakes holds 15%. Repeats the Sun Resources update.
Sun Resources relays that Eagle North-1 testing is delayed because a completion rig and coiled tubing unit are not yet available together, owing to heavy demand in the Bakersfield area. No flow result yet; Lakes holds 15%.
2 June 2006capital raising announcement● NeutralMajor
Lakes placed 75 million shares at 1.8 cents to raise $1.35 million, with 25 million options at 1.8c expiring June 2007. Funds cover Eagle North-1 cost overruns, Hunters Lane-1 re-entry, Trifon-2 and North Seaspray-3 testing, and seismic in PEP 163/164. Follows the 2c placement earlier in 2006.
What it means for a shareholder
75.0m new shares at A$0.018 to raise about A$1.4m. That's 3.7% dilution: every existing holder's slice gets 3.7% smaller. If you held A$1,000 of shares (55,556 at the issue price), your slice goes from 0.00288% to 0.00277% of the company. To keep it you'd need 2,159 more shares - about A$39 at the issue price.
Lakes says Eagle North-1 costs have 'blown out', with re-entry and testing expected in 10-14 days. Sinopec due diligence continues, and an independent report suggests up to 536 bcf gas in place at Wombat, 375 bcf at Gangell. Lakes stresses these are uncertain, not reserves.
James Syme, a retired Victorian Government Solicitor, has joined the Lakes board. He was previously a director from 1985 to 1997, when the company first listed.
Operator Victoria Petroleum says Eagle North-1 testing continues with results 'encouraging' but no flow figures. A completion rig is due on site this coming week, then a coiled tubing unit. Up to 1,000 bopd is hoped; Lakes holds 15%.
Sun Resources reports 'encouraging' Eagle North-1 test results, without figures. The drilling rig was released on 20 May and a cheaper completion rig is due next week, then a coiled tubing unit. No flow rates yet; Lakes holds 15%.
Sun Resources says the cased section of the Eagle North-1 lateral was perforated and testing is under way. Testing is slow because no coiled tubing unit or nitrogen is available. No flow result yet; Lakes holds 15%.
Operator says production testing continues on the 177 m Eagle North-1 lateral, with no results yet. Results will be announced when testing is complete. Lakes holds 15%.
Operator confirms Eagle North-1 drilling ended at 4,386 m because of running sands, and no slotted liner was run. A production test of 177 m is being prepared, taking four to seven days. Up to 1,000 bopd is hoped; Lakes holds 15%.
Sun Resources relayed that drilling of the Eagle North-1 horizontal well ended at 4,386 m because of running sands. A production test of 177 m of lower Gatchell sand was being prepared, expected to take about four days. Lakes holds 15%.
Lakes signed a non-binding memorandum of understanding with Sinopec's East China Petroleum Bureau covering its onshore Gippsland acreage. Commercial negotiations start once technical due diligence is done. This follows the April talks; no binding deal or terms yet.
Quarterly report to 31 March 2006: Banjo-1A found no hydrocarbons, PEP 156 was relinquished, and PEP 157 had no field work. Halliburton's phase I study was positive on the tight gas fields, and Boundary Creek-2 is awaiting fracture equipment.
Sun Resources says Eagle North-1 had survey tool problems, forcing a restart of the lateral at 4,285 m. Oil inflow occurred at 4,303 m and mud weight is being raised. Good oil-show sand is about 6 m so far; Lakes holds 15%.
Operator reports good oil shows over 11 m of the Eagle North-1 lateral to 4,308 m, with oil inflow on a flow check and gas up to 550 units. The 320 m lateral and slotted liner remain planned. Lakes holds 15%.
Lakes relays the operator's 26 April Eagle North-1 report: good oil shows from 4,297 to 4,308 m with oil inflow on a flow check. Drilling of the 320 m lateral continues. Lakes holds 15%. Repeats the operator's announcement.
Lakes says it has held preliminary talks with China's Sinopec, which is sending a delegation to assess its Gippsland tight gas projects. It is applying for a retention lease over much of PEP 157 and plans to reopen Hunters Lane-1. No binding deal yet.