Stockle - the stock oracle

Kinetiko Energy Ltd

ASX:KKO
A$0.032Close 7 Oct 2026 · delayed

Past year: ▼ 55%(3.20c – 7.15c AUD)

Market cap
A$13.1m
Shares on issue
408m
In-ground value
A$6.4m
Risked multiple
0.49×
Story beats
129 since 2011
Last event
19 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

12 June 2025capital raising announcement● NeutralMajor

Kinetiko raises about A$2.2m at 4c per share (20% below last trade), with a free option per share at 7c expiring June 2027. Directors take up to A$310k, subject to approval. A A$500k loan is also converted to shares. Follows cash falling to A$441k.

Discuss in chat

15 May 2025investor presentation● Neutral

May 2025 investor presentation restated the 6.0 Tcf 2C resource, 6.4 Bcf 2P reserve and first LNG revenue targeted for 2026. It also repeated the expert report's finding that foam and water invasion cut gas flow by up to 85%, with positive core permeability.

Discuss in chat

14 May 2025drilling spud▲ GoodMajor

Third of five test wells, 271-KA03PT10 at Brakfontein, spudded 9 May 2025 using revised drilling methods from the expert study. It is intended to join a cluster feeding a pilot LNG plant expected in 2026; first gas flow results expected before July 2025.

Value this in the calculator →Discuss in chat

30 Apr 2025quarterly activities report▼ Bad

March quarter: available funds about A$441k (A$177k cash, A$264k in the IDC vehicle), no debt, down from A$2.28m in December. Recaps the drilling optimisation findings; company says gas flows from both test wells are improving. Funding looks very tight (inference).

Discuss in chat

23 Apr 2025well test result▲ GoodMajor

Final expert report finds water and drilling foam cut gas permeability by up to 85% in lab simulations, blaming drilling methods for the first two wells' poor flows. Resolves the study opened in February; next well to spud early May with revised methods.

Discuss in chat

19 Mar 2025well test result▲ Good

Interim lab work by consultant OTP on the first two test wells found the rock itself is permeable, but drilling put excessive water into it, temporarily blocking gas flow. Remediation is expected to work; third well planned for April 2025 spud. Supports February's 'skin' suspicion.

Discuss in chat

10 Mar 2025half year report● Neutral

Half-year to 31 December 2024: operating loss $3,838,763 (prior-year period $2,910,325). Cash $1.38m with no debt. The IDC joint venture began returning original funds (about $1.366m to Kinetiko on 19 December). ER383 approval is now expected by mid-2025.

Discuss in chat

11 Feb 2025well test result▲ GoodMajor

Second well 271-KV06PT reached 631m and has been flared. The company now says its first-well 'small sealed compartment' conclusion was incorrect, and suspects drilling may have created a temporary 'skin' blocking gas flow. A drilling optimisation study precedes continuing the program.

Discuss in chat

31 Jan 2025quarterly activities report● Neutral

December quarter: about A$2.28m available (A$1.38m cash, A$0.50m advanced to the IDC vehicle, IDC about A$0.40m), no debt, down from A$4.29m in September. Recaps the dry first test well and the second well's spud; no new results in the visible text.

Discuss in chat

31 Dec 2024director officer appointment▼ BadMajor

Chairman's letter says CEO Nick de Blocq is stepping down at year end after three years, for personal reasons. Director Rob Bulder becomes Interim CEO; talks with permanent candidates are well advanced. Also recaps 2024 drilling and calls the first test well's result a geological anomaly.

Discuss in chat

23 Dec 2024admin correction● Neutral

Corrects two typographical errors in the 2024 annual report: capitalised exploration assets are $66,446,657, and non-controlling interest is +$87,853 rather than negative. A corrected report is attached. No change to operations.

Discuss in chat

6 Nov 2024admin correction● Neutral

After ASX discussions, Kinetiko reissued its 23 and 29 October announcements with added resource disclosures, including a 2.8 Tcf 1C contingent resource alongside the 6 Tcf 2C. Compliance wording only; no new results. Readers should use the revised versions.

Discuss in chat

31 Oct 2024quarterly activities report● Neutral

September quarter: about A$4.29m available (A$1.02m cash plus A$1.8m advanced to the IDC vehicle; IDC contributed about A$1.47m), no debt, down from A$7.21m in June. Repeats the 270-11C core result and the dry first test well 271-23PT.

Discuss in chat

29 Oct 2024drilling spud● Neutral

Second production test well 271-KV06PT spudded 24 October 2024, 41m from core hole KV-06C (86.5m gassy sandstone), near the Lily pipeline. Initial gas flow results are expected in November. Follows the disappointing first well; each well is to be flow-tested up to 90 days.

Value this in the calculator →Discuss in chat

23 Oct 2024drilling result▼ BadMajor

First production test well 271-23PT reached 463m on 16 October 2024 but produced no commercial gas in a choke test, so no flow test followed. The company calls it a geological anomaly (a small, sealed compartment). Cost under A$500,000; rig moved to second well.

Value this in the calculator →Discuss in chat

23 Oct 2024listing compliance notice● Neutral

ASX says the suspension will lift immediately after Kinetiko releases its drilling results announcement. Procedural; it follows the voluntary suspension requested on 21 October.

Discuss in chat

21 Oct 2024listing compliance notice● NeutralMajor

At the company's request, KKO was placed in voluntary suspension pending an announcement on drilling results at well 271-23PT, expected on or before 23 October 2024. Resolves the earlier trading pause's cause; the well result is awaited.

Discuss in chat

21 Oct 2024agm notice● Neutral

Kinetiko will hold its AGM in Perth at 2:00PM AWST on 27 November 2024, with director nominations closing 28 October 2024. Notice of Meeting to follow. Administrative, with no new information.

Discuss in chat

17 Oct 2024listing compliance notice● Neutral

ASX paused trading in KKO on 17 October 2024 pending a further announcement. No reason is given in the notice. Inference: it may relate to the first production test well 271-23PT, but the notice does not say so.

Discuss in chat

9 Oct 2024admin correction● Neutral

Appendix 4G corporate governance checklist for the year to 30 June 2024, lodged alongside the annual report. Statement is on the company website and approved by the board. Administrative, with no new information.

Discuss in chat

9 Oct 2024annual report● Neutral

2024 Annual Report publishes the same year's results and chairman's address, repeating known facts: 6.4 BCF maiden reserve, over 6 TCF 2C resource, IDC partnership and the May 2024 power demo. Nothing new in the visible text.

Discuss in chat

30 Sept 2024annual report● Neutral

Financial report for the year to 30 June 2024, with the Executive Chairman's address recapping the 6.4 BCF reserve, 6 TCF resource, seven core holes drilled and the May gas-to-power demo. The visible text gives no loss or cash figures.

Discuss in chat

30 Sept 2024drilling spud▲ GoodMajor

First production test well 271-23PT spudded on 27 September 2024, about 5km from Majuba power station. It starts the five-well program of up to 90-day flow tests; completion and first gas flow results are expected by early November 2024.

Value this in the calculator →Discuss in chat

16 Sept 2024drilling scheduled● Neutral

Rig mobilisation has begun for production test well 271-23PT, with spud expected the week of 23 September 2024 and first gas flow results in October. Another small slip from the early September spud previously guided.

Value this in the calculator →Discuss in chat

8 Aug 2024drilling result▲ Good

Core hole 270-11C reached 613.8m with 90m of gas-bearing sandstone, the 38th core hole, all with gas. It completes the 2022-24 ER270 core program and regulator work requirements, resolving the planned two extra ER270 core holes; focus now moves to the five production test wells.

Value this in the calculator →Discuss in chat

1 Aug 2024drilling scheduled● Neutral

Site preparation has begun for the first of five production test wells; rig to mobilise late August with first well 271-23PT spudding in early September. The nine-month program flow-tests each well up to 90 days. Start slips from the earlier August target.

Value this in the calculator →Discuss in chat

31 July 2024quarterly activities report▲ Good

June quarter: about $7.21m available, comprising $4.07m cash plus $1.73m advanced to the IDC vehicle and about $1.41m contributed by IDC; no debt. Repeats the Korhaan-1 power demo and the 270-12C result. Rights issue raised about A$5m.

Discuss in chat

1 July 2024drilling result▲ Good

Core hole 270-12C, spudded 13 April 2024, reached 742.9m with 87.5m of gas-bearing sequences, in the southern ER270 area about 30km from 270-08C. Core hole 270-11C began 7 June; the five appraisal wells are expected to start within 4-6 weeks.

Value this in the calculator →Discuss in chat

20 June 2024investor presentation● Neutral

June 2024 presentation repeating known facts: 6.0 TCF 2C resource, 6.4 BCF 2P reserve, 44 wells all with gas, and the May 2024 gas-to-power demo. Says the company is funded for the 2024 five-well flow testing; reserve and resource increase targeted for 2025.

Discuss in chat

18 June 2024capital raising announcement▲ GoodMajor

Final result: 84,266,769 shares issued at $0.06, raising about $5,056,006, 99.99% of the maximum, correcting the earlier 97% figure. Entitlements took 65.76m shares; directors placed 18.51m shortfall shares. No shortfall remains, resolving that open thread.

What it means for a shareholder

84.3m new shares at A$0.060 to raise about A$5.1m. That's 17% dilution: every existing holder's slice gets 17% smaller. If you held A$1,000 of shares (16,667 at the issue price), your slice goes from 0.00408% to 0.00339% of the company. To keep it you'd need 3,441 more shares - about A$206 at the issue price.

Create a free account to see this worked out for your own holding.

Discuss in chat