10 Feb 2021drilling progress report▼ Bad

Halifax No.1 was plugged deep and Redland No.1 plugged, but the Halifax wellhead leaked a little gas, so valves went to Roma for reconditioning. The Callamurra test is delayed again, and the remaining three wells are suspended pending a new quote.

Value this in the calculator →Discuss in chat

31 Dec 2020drilling progress report● Neutral

ATP 855 rehabilitation and testing began on 30 December 2020 after COVID-19 equipment delays. Work is expected to take up to 35 days, including the Halifax No.1 Callamurra gas test; results will be announced when known.

Value this in the calculator →Discuss in chat

15 Mar 2017drilling progress report▲ GoodMajor

Acquisition of the 293 km2 Harrier 3D seismic survey in ATP 594 (Icon 100%) is complete, the first seismic there in almost 20 years. Velseis in Brisbane is processing the data, which will guide any drilling.

Value this in the calculator →Discuss in chat

3 Nov 2016drilling scheduled▲ GoodMajor

Icon will acquire 293 km2 of Harrier 3D seismic in the northern block of ATP 594 (100%, operator), using contractor Terrex, starting late November 2016. This ends the long delay and is meant to define prospects for a later drilling program.

Value this in the calculator →Discuss in chat

27 Mar 2015farm in farm out completion▼ BadMajor

Chevron will not join Stage 2 in ATP 855, so Beach moves to 64.9% and Icon stays at 35.1%. Chevron cited strategic fit. Icon expects modest spending to June, a likely 3D seismic survey in Stage 2, and had $20.9m cash at 31 Dec.

Value this in the calculator →Discuss in chat

27 Mar 2015resource reserve update▲ GoodMajor

DeGolyer and MacNaughton lifted ATP 855 gross contingent resources to 1C 343 / 2C 1,572 / 3C 5,841 Bcf, from 2C 629 Bcf. Icon's 35.1% share is about 552 Bcf 2C. This is a big step toward the 2 Tcf 2P goal, though still contingent.

Value this in the calculator →Discuss in chat

3 Feb 2015drilling progress report● Neutral

Geoffrey-1 has been shut in for pressure build-up after reaching a peak of 1.1 million cubic feet a day. Icon says the joint venture has all the data it needs, and the managing director says shutting in kept the program within its exploration budget.

Value this in the calculator →Discuss in chat

13 Nov 2014drilling progress report● Neutral

Redland-1 stimulation is complete. Equipment has moved to Geoffrey-1, where stimulation of the Patchawarra and Epsilon formations started 12 November. All four wells are now stimulated or in progress, with stabilised flow rates still to be reported.

Value this in the calculator →Discuss in chat

29 Oct 2014drilling progress report● Neutral

Etty-1 stimulation is complete, with flow testing over the coming weeks. Stimulation of Redland-1 began 28 October. No flow rates reported yet.

Value this in the calculator →Discuss in chat

13 Oct 2014drilling progress report● Neutral

Stimulation of Hervey-1 is complete, with flow testing to follow and a flow rate announced once stabilised. Equipment moved to Etty-1, where stimulation started 11 October. No flow results yet.

Value this in the calculator →Discuss in chat

16 Sept 2014drilling progress report● Neutral

Hydraulic stimulation began at Hervey-1, with five Upper Patchawarra zones to be fracture stimulated and then flow tested. This is the first well fracture stimulated in the four-well campaign; no results yet.

Value this in the calculator →Discuss in chat

11 Sept 2014drilling progress report● Neutral

ATP 855 stimulation operations began with a wellbore cleanout of Geoffrey-1 by Condor, ahead of testing one Lower Patchawarra zone. Hervey-1 stimulation is due in about a week; the whole four-well program is expected to take about six weeks.

Value this in the calculator →Discuss in chat

30 July 2014drilling scheduled▲ Good

The ATP 855 joint venture agreed the stimulation and extended flow testing program on Geoffrey-1, Redland-1, Hervey-1 and Etty-1, starting early September 2014 and taking months. Condor's equipment arrived in Melbourne on 26 July. This firms up the Q3 timing flagged earlier.

Value this in the calculator →Discuss in chat

19 June 2014resource reserve update▲ GoodMajor

An independent DeGolyer & MacNaughton report gives ATP 855 a best-estimate 28.49 Tcf gross unconventional prospective resource (P90 21.48, P10 37.74), Icon's share 10 Tcf (35.1%). These are undiscovered volumes, not contingent resources; upgrading needs successful stimulation and flow testing of four wells.

Value this in the calculator →Discuss in chat

2 Apr 2014drilling progress report● Neutral

Beach's March report: Etty-1 reached 3,807 m, logs indicate a gas-saturated target interval, and the six-well ATP 855 program is complete. The rest covers Beach's other permits, including an oil discovery at Stunsail-1 (not Icon's).

Value this in the calculator →Discuss in chat

2 Apr 2014drilling result▲ Good

Icon confirms Etty-1 reached 3,807 m, with preliminary log interpretation indicating a gas-saturated target interval. It is the sixth and final well of this campaign. Stimulation of the four wells is still expected in Q3 2014, subject to JV approval.

Value this in the calculator →Discuss in chat

25 Mar 2014drilling result▲ Good

Etty-1, the sixth ATP 855 well, reached 3,807 m on 23 March in the top of the Patchawarra, with gas shows throughout the Permian. It will be cased and suspended; stimulation is expected from Q3 2014.

Value this in the calculator →Discuss in chat

5 Mar 2014drilling progress report● Neutral

Beach's February report: Etty-1, spudded 9 February, is running intermediate casing after reaching 2,665 m, and will be cased and suspended for stimulation. The rest covers Beach's other permits. Nothing new for Icon.

Value this in the calculator →Discuss in chat

5 Mar 2014drilling progress report● Neutral

Etty-1 is at 2,665 m in the Nappamerri Group, running intermediate casing to about 2,660 m. It is still aiming for 3,800 m. No gas or test results yet.

Value this in the calculator →Discuss in chat

11 Feb 2014drilling spud● NeutralMajor

Etty-1, the sixth ATP 855 well, spudded 9 February 2014. It targets 3,800 m, 8.6 km east of Halifax-1, for basin-centred gas in the Permian. Stimulation is planned from Q3 2014, subject to joint venture approval.

Value this in the calculator →Discuss in chat

5 Feb 2014drilling progress report● Neutral

Beach's January report: Redland-1 was cased and suspended after reaching 3,804 m, and the rig is moving to Etty-1, 8.6 km east of Halifax-1. Stimulation is targeted for Q3 2014. The rest covers Beach's other permits.

Value this in the calculator →Discuss in chat

3 Feb 2014drilling result▲ GoodMajor

A Notice of Petroleum Discovery was lodged for Redland-1. Wireline logs indicate the target interval is gas saturated, with mud gas readings up to 800 units. It follows the Halifax-1 and Keppel-1 notices. Stimulation is planned for Q3 2014.

Value this in the calculator →Discuss in chat

24 Jan 2014drilling result▲ GoodMajor

Redland-1 reached 3,804 m on 23 January 2014 with significant gas shows in the Toolachee and Daralingie. It will be cased and suspended. Stimulation now slips to Q3 2014 (Q1 was proposed in December, Q2 on 20 January). Etty-1, the sixth well, is next.

Value this in the calculator →Discuss in chat

20 Jan 2014drilling progress report● Neutral

Redland-1 is drilling at 3,700 m, near its planned 3,800 m. Etty-1 is next. A four-well stimulation campaign (Geoffrey-1, Redland-1, Etty-1, Hervey-1) is now set for Q2 2014, later than the Q1 2014 proposed in December.

Value this in the calculator →Discuss in chat

10 Jan 2014drilling progress report● Neutral

Redland-1 is at 2,883 m, with 9-5/8" casing cemented at 2,880 m. The rig is preparing to drill on towards 3,800 m. No gas or test results yet.

Value this in the calculator →Discuss in chat

8 Jan 2014drilling progress report● Neutral

Beach's December report: Geoffrey-1 reached 4,124 m on 9 December with high gas levels in the Permian. Redland-1, spudded 15 December, is cementing intermediate casing. The rest covers Beach's other permits. Nothing new for Icon.

Value this in the calculator →Discuss in chat

17 Dec 2013drilling spud● NeutralMajor

Redland-1, the fifth ATP 855 well, spudded 15 December 2013. It targets 3,800 m, 22 km north-west of Geoffrey-1, aiming at the Toolachee and Daralingie Formations. Stimulation is still proposed to start in Q1 2014, beginning with Hervey-1.

Value this in the calculator →Discuss in chat

13 Dec 2013drilling result▲ GoodMajor

Geoffrey-1 reached 4,125 m on 9 December 2013, with good gas shows throughout the Permian section. It will be cased and suspended for stimulation in Q1 2014. Redland-1 is next, with a sixth well subject to joint venture approval.

Value this in the calculator →Discuss in chat

4 Dec 2013drilling progress report● Neutral

Beach's November report: Geoffrey-1 in ATP 855 is drilling ahead at 3,979 m, planned to about 4,250 m. Most of the report covers Beach's other permits, including PEL 218 horizontal well Boston-3 reaching total depth. No new Icon-specific result.

Value this in the calculator →Discuss in chat

6 Nov 2013drilling progress report● Neutral

Beach's October report: Geoffrey-1 in ATP 855 is at the intermediate casing point of 2,612 m. The rest covers Beach's other permits, with no new Icon-specific result.