Stockle - the stock oracle

Icon Energy Ltd

ASX:ICN
A$0.006Latest close held · delayed

Past year: ▲ 0%(0.60c – 0.60c AUD)

Market cap
A$3.7m
Shares on issue
619m
In-ground value
—
Risked multiple
0.00×
Story beats
146 since 2006
Last event
12 Jan 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

6 Nov 2013drilling progress report● Neutral

Beach's October report: Geoffrey-1 in ATP 855 is at the intermediate casing point of 2,612 m. The rest covers Beach's other permits, with no new Icon-specific result.

Value this in the calculator →Discuss in chat

28 Oct 2013quarterly activities report● Neutral

September 2013 quarter: cash fell to $25.95m from $33.20m. Halifax-1 produced 243 MMscf over 188 days before shut-in in August; Geoffrey-1 is drilling. The PEP 170/172/173 ILUA was executed 9 Aug 2013, awaiting registration. Shares on issue 533.5m.

Discuss in chat

21 Oct 2013investor presentation● Neutral

Conference presentation to the East Coast Gas Conference, covering Asian demand, east-coast gas supply and ATP 855 history including the Chevron farm-in and the US$18m put sale. Repeats known facts, with no new results.

Discuss in chat

18 Oct 2013annual report● Neutral

2013 Annual Report dispatched. It reports a $3.72m after-tax profit and about $34m raised over the year, and commits to at least three more ATP 855 wells by October 2014. Largely repeats the accounts released in August.

Discuss in chat

18 Oct 2013agm notice● Neutral

Notice of the 25 November 2013 AGM. Resolutions cover the remuneration report, re-election of Dr Keith Hilless, performance rights for Ray James and Kevin Jih, a 10% placement capacity under Listing Rule 7.1A, and renewal of the proportional takeover provisions.

Discuss in chat

16 Oct 2013drilling spud▲ GoodMajor

Geoffrey-1, the fourth well in the ATP 855 program, spudded on 14 October 2013, later than the late September to early October guidance. It targets 4,266 m, 36 km north-east of Hervey-1, and stimulation is proposed for Q1 2014, starting with Hervey-1.

Value this in the calculator →Discuss in chat

26 Sept 2013other● Neutral

Administrative notice of Icon's 2013/14 reporting calendar: quarterly reports due by end Oct, Jan, Apr and Jul, half-year results 20 Feb 2014, and the AGM on 25 November 2013. No new operational or financial information.

Discuss in chat

4 Sept 2013drilling progress report● Neutral

Beach's August report: Keppel-1 safely suspended after gas influx from the over-pressured Epsilon, with the joint venture to evaluate options. Rig released to Boston-3 in PEL 218. Mostly other Beach permits, no new Icon-specific result.

Value this in the calculator →Discuss in chat

4 Sept 2013other● Neutral

Administrative Appendix 3B: 2,064,748 shares issued at nil price on exercise of vested 2012-13 performance rights. Quoted shares now total 535,455,958.

Discuss in chat

27 Aug 2013annual report● Neutral

Full-year accounts to 30 June 2013. Directors' report recaps the year: the Nov 2012 placement and share purchase plan at $0.22, the Chevron farm-out, the put option exercise, and the Goondi acquisition after year end. Financial figures were not visible.

Discuss in chat

26 Aug 2013resource reserve update▲ GoodMajor

Maiden contingent resource for Halifax-1 in ATP 855: gross 318 Bcf 1C, 629 Bcf 2C and 1,115 Bcf 3C. This delivers the booking previously targeted, a first step toward Icon's goal of 2 Tcf 2P reserves.

Value this in the calculator →Discuss in chat

21 Aug 2013drilling result● NeutralMajor

Halifax-1 now flows 0.7 MMscfd, with 239 MMcf produced. Hervey-1 stimulation is expected in December 2013. Keppel-1 hit strong gas from the over-pressured Epsilon and is suspended, with a Notice of Petroleum Discovery. Geoffrey-1 expected to spud late September to early October.

Value this in the calculator →Discuss in chat

7 Aug 2013drilling progress report● Neutral

Beach's July report: Hervey-1 cased and suspended at 4,266 m after over 800 m of Patchawarra. Keppel-1 stopped at about 3,900 m by high-pressure gas, with options to restart under review. Remainder covers other Beach permits.

Value this in the calculator →Discuss in chat

1 Aug 2013other▼ BadMajor

Icon received a claim letter from Ronald Baldwin and Southern Fairway (formerly Babcock & Brown Australia Infrastructure) over a 2008 agency agreement and MOU for ATP 626P gas sales. They allege damages of $20-60m and $15-30m. Icon gives the figures no credence and no proceedings have started.

Discuss in chat

30 July 2013quarterly activities report● Neutral

June 2013 quarter: cash rose to $33.20m, helped by the US$18m put option proceeds, with 533.4m shares. Halifax-1 flows 0.9 MMscfd. Keppel-1 was suspended at about 3,900 m after strong gas influx. Hervey-1 found over 800 m of Patchawarra.

Discuss in chat

16 July 2013drilling result▲ Good

Hervey-1 reached total depth of 4,269 m with gas shows; Keppel-1 is at 3,897 m. Geoffrey-1 is planned for later in July, subject to approvals. No flow results yet.

Value this in the calculator →Discuss in chat

5 July 2013drilling progress report● Neutral

Icon reports Hervey-1 drilling at 4,020 m and Keppel-1 having cut its first core, with gas shows described as encouraging. Geoffrey-1 is planned for mid-July. No quantified result.

Value this in the calculator →Discuss in chat

3 July 2013drilling progress report● Neutral

Beach's June drilling report: in ATP 855 (now Beach 46.9%, Icon 35.1%), Hervey-1 is at 3,969 m and Keppel-1 is coring at 3,535 m. Other results concern Beach's other permits, with no new Icon-specific result.

Value this in the calculator →Discuss in chat

3 July 2013asset acquisition disposition● NeutralMajor

Icon acquired Goondi Energy's (Stanwell subsidiary) 50% in ATP 626, lifting its stake to 100% after Goondi exercised its right to exit. Icon plans a new seismic and drilling program there. Price not stated.

Discuss in chat

26 June 2013farm in farm out completion● NeutralMajor

The put option sale completed on 25 June 2013: Icon transferred 4.9% of ATP 855 to Beach for US$18m. Icon now holds 35.1%, Beach 46.9% and Chevron 18%, resolving the option pending since February.

Value this in the calculator →Discuss in chat

17 June 2013farm in farm out agreement● NeutralMajor

Icon exercised its put option, obliging Beach to buy a 4.9% interest in ATP 855 for US$18m. Icon's stake drops from 40% to 35.1%, completion due 25 June 2013. Icon says the cash will fund its ATP 855 exploration program.

Value this in the calculator →Discuss in chat

6 June 2013drilling progress report● Neutral

Beach's drilling report table revised for Sceale-1 in PEL 91 (cased and suspended). In ATP 855, Hervey-1 is at 1,931 m and Keppel-1 at 911 m, both drilling ahead. No new Icon-specific result.

Value this in the calculator →Discuss in chat

5 June 2013drilling progress report● Neutral

Beach's May monthly drilling report. In ATP 855, Hervey-1 is at 1,931 m and Keppel-1 at 911 m. The rest covers Beach's other Cooper Basin permits. No new Icon-specific result.

Value this in the calculator →Discuss in chat

3 June 2013drilling spud● NeutralMajor

Keppel-1 spudded 3 June in ATP 855, 25 km north-east of Halifax-1, to over 4,500 m. It is described as the deepest Nappamerri Trough well to date. Hervey-1 is drilling at 1,404 m.

Value this in the calculator →Discuss in chat

27 May 2013drilling spud● NeutralMajor

Hervey-1 spudded 26 May in ATP 855, 30 km east of Halifax-1, to about 4,200 m. A material contingent resource is expected to be booked if testing succeeds. Halifax-1 is flowing 1.1 MMscfd, continuing its decline.

Value this in the calculator →Discuss in chat

27 May 2013joint venture update▼ Bad

Beach reports Halifax-1 now flowing 1.1 MMscfd, down from 1.7 MMscfd in April. Hervey-1 spudded 26 May and Keppel-1 is due soon. ATP 855 interests are shown as Beach 42%, Chevron 18% (subject to approval), Icon 40%.

Discuss in chat

30 Apr 2013quarterly activities report● Neutral

March 2013 quarter: cash fell to $19.77m from $21.15m, with 533.4m shares unchanged. Icon estimates $9.06m of outlays next quarter, including $7.76m for exploration. Routine quarterly.

Discuss in chat

17 Apr 2013joint venture update● Neutral

Beach's update repeats Halifax-1's 4.2 MMscfd peak was affected by a faulty gauge, with 1.7 MMscfd now unconstrained. It also covers PEL 218 wells and a second stimulation program from May. Mostly duplicates Icon's release.

Discuss in chat

17 Apr 2013well test result▼ BadMajor

Icon said Halifax-1's 4.2 MMscf/d peak was reached while a faulty temperature gauge let wellhead temperature exceed its recommended maximum. The well was flowing an unconstrained 1.7 MMscf/d, and Hervey-1 was due to spud in early May, followed by Keppel-1.

Discuss in chat