Stockle - the stock oracle

Icon Energy Ltd

ASX:ICN
A$0.006Latest close held · delayed

Past year: ▲ 0%(0.60c – 0.60c AUD)

Market cap
A$3.7m
Shares on issue
619m
In-ground value
—
Risked multiple
0.00×
Story beats
146 since 2006
Last event
12 Jan 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

10 Feb 2012admin correction● Neutral

Re-lodged version of the 10 February coal seam gas conference presentation, labelled a correction. The visible text matches the original and the change is not stated.

Discuss in chat

10 Feb 2012investor presentation● Neutral

Conference presentation by an Icon representative, as the Managing Director was absent, on gas market trends, CSG and shale gas opportunities and shale versus CSG costs. General industry commentary; the visible text contains no new company results.

Discuss in chat

31 Jan 2012other● Neutral

Appendix 5B for December 2011 quarter: cash fell to $14.049m from $14.268m, with no financing inflows. Estimated outflow next quarter is $6.847m. Shares unchanged at 469,301,394. Routine filing.

Discuss in chat

28 Dec 2011drilling result▼ BadMajor

North Maroon DW1 tests at 1,835-1,860m and 1,568-1,593m flowed formation water, with some gas in the upper test, so no oil flowed. Icon says the sandstone is good reservoir with oil shows, but a trap is not yet defined. South Maroon and other locations are being considered.

Value this in the calculator →Discuss in chat

21 Dec 2011drilling progress report● Neutral

Logs on North Maroon DW1 are evaluated and a first drill stem test is under way over 1,840-1,865m, where strong oil shows were seen. Further tests on other zones and coal seams depend on that first result.

Value this in the calculator →Discuss in chat

20 Dec 2011drilling progress report● Neutral

Logging continues on North Maroon DW1 to evaluate the Precipice shows, before deciding on drill stem tests. A final decision on plugging back and sidetracking west awaits the test results. Coal seam gas sample tests are continuing.

Value this in the calculator →Discuss in chat

19 Dec 2011drilling result● Neutral

North Maroon DW1 reached 1,891m. Icon says oil shows prove a hydrocarbon system in ATP 626P, but the main lower Precipice sandstone was absent here. The well may be plugged back and sidetracked west. Tests are still to come.

Value this in the calculator →Discuss in chat

16 Dec 2011drilling progress report● Neutral

North Maroon DW1 is at 1,742m in the Evergreen Formation, drilling slowly through small faults. More strong fluorescent cut shows and gas of 10 units of C1 were seen at 1,731-1,736m. Icon says significance is not yet established.

Value this in the calculator →Discuss in chat

15 Dec 2011drilling progress report● Neutral

North Maroon DW1 is drilling at 1,618m with weak to strong bluish-white fluorescent shows, usually a sign of residual oil, but no rise in background gas. Icon calls the shows encouraging but says their significance is unproven. Precipice target is still to come.

Value this in the calculator →Discuss in chat

13 Dec 2011drilling progress report● Neutral

North Maroon DW1 reached 1,473m measured depth, passing through Walloon Coal Measures as planned. Drilling paused to fix rig and downhole equipment problems, with restart expected 14 December. Target remains about 2,100m; Icon holds 100%.

Value this in the calculator →Discuss in chat

6 Dec 2011drilling progress report● Neutral

North Maroon DW1 is at 272m with surface casing cemented and blowout preventers tested, awaiting directional drilling tools. Target depth is about 2,100m, 21 days from spud. The release gives the spud date as 1 December, which conflicts with the 2 December spud announcement.

Value this in the calculator →Discuss in chat

2 Dec 2011drilling spud● NeutralMajor

North Maroon DW1 was spudded in ATP 626P and drilling ahead. It targets the Precipice Sandstone and is planned to take 21 days to about 2,100m. Icon holds 100% after Stanwell's Goondi declined to participate. Spud slipped from the planned 24 November.

Value this in the calculator →Discuss in chat

1 Dec 2011director officer appointment● Neutral

Chief Financial Officer Dr Kevin Jih was appointed an executive director, giving the board two executive and four non-executive directors. No extra pay beyond his existing contract. The chairman links it to the company's focus on China.

Discuss in chat

28 Nov 2011director officer appointment● NeutralMajor

Icon re-appointed Managing Director Ray James for a further five years from 31 December 2011. The chairman says this supports the strategy of establishing reserves to satisfy the gas sale agreements.

Discuss in chat

28 Nov 2011investor presentation● Neutral

AGM presentation by the Managing Director restates the strategy: shale and coal seam gas exploration in the Cooper, Surat and Gippsland basins to find reserves for the Shantou LNG deal (40 Mt over 20 years). It shows North Maroon DW1 and Tiger-1 targets. Repeats known facts.

Discuss in chat

23 Nov 2011drilling scheduled● NeutralMajor

Icon signed an Atlas Drilling contract to drill North Maroon DW1 in ATP 626P, targeting the Precipice Sandstone that produces at the Moonie oilfield. Stanwell's Goondi chose not to participate, so Icon holds 100%. A change from the coal seam gas focus; spud planned 24 November.

Value this in the calculator →Discuss in chat

28 Oct 2011other▼ Bad

Appendix 5B for the September 2011 quarter: cash fell to $14.268m from $18.379m, with no financing inflows. Estimated outflow next quarter is $6.168m. Shares unchanged at 469,301,394. Routine filing.

Discuss in chat

27 Oct 2011annual report● Neutral

2011 Annual Report restates that Icon must find 2P reserves for its two sales deals: 337.5 PJ for Stanwell and 2 TCF (2,121 PJ) certified by March 2013 for the Shantou LNG deal. It estimates ATP 855P at some 20 TCF recoverable, with drilling expected in June 2012.

Discuss in chat

14 Sept 2011director officer appointment▼ Bad

Chief Operating Officer Larry Brown resigned immediately for personal reasons. Managing Director Ray James will seek a consulting engineer to cover the role until a replacement is found.

Discuss in chat

31 Aug 2011annual report▼ Bad

Full-year accounts to 30 June 2011 show a loss of $6.0m (prior year $3.6m). They record the 40% ATP 855P transfer to Beach, backdated to 5 October 2010, and the Stanwell 50% earn-in. Covering letter only; the figures are in the attached accounts.

Discuss in chat

30 Aug 2011drilling scheduled▲ GoodMajor

Icon says Beach has secured the Ensign #65 rig for the ATP 855P farm-in well, arriving April 2012 and drilling by June 2012 at the latest. Beach funds Icon's share of the ~$16m programme except Icon's $1.75m. First ATP 855P drilling timetable since the July settlement.

Value this in the calculator →Discuss in chat

29 Aug 2011joint venture update▲ Good

Beach has secured two rigs for its 2012 Cooper Basin shale gas program. Ensign#65, due about April 2012, will drill the first horizontal well in ATP 855P (Icon 40%, Beach 40%). This is Beach's release; Icon's own version follows.

Discuss in chat

29 July 2011other● Neutral

Appendix 5B cash flow statement for the June 2011 quarter: cash ended at $18.379m, up from $17.938m. Next-quarter outflow is estimated at $5.39m. Shares on issue are unchanged at 469,301,394. Routine filing accompanying the quarterly report.

Discuss in chat

15 July 2011joint venture update● Neutral

Beach's own release of the 15 July settlement repeats the terms: court case discontinued, 40% of ATP 855P to Beach, and Icon takes 33.333% of the PEL 218 post-Permian joint venture. Duplicates Icon's announcement.

Discuss in chat

15 July 2011farm in farm out agreement● NeutralMajor

Icon and Beach settled the ATP 855P dispute with a signed farm-in. Icon transfers 40% to Beach (subject to Ministerial approval), leaving Icon 40%. Beach funds Icon's share of an estimated $16m work programme, except $1.75m Icon pays. Icon gets 33.333% of PEL 218 post-Permian.

Value this in the calculator →Discuss in chat

27 June 2011other● Neutral

June shareholder newsletter covers the shale gas outlook for ATP 855P, NSAI certification work, a planned seismic programme and the Beach dispute (trial 18 July). Promotional update; no new announced results.

Discuss in chat

21 June 2011drilling result▼ BadMajor

Lydia-13 was plugged and abandoned at 825m because coal permeability was too low for economic gas production. That ends the four-well programme with no wells kept. A follow-up programme from 1 July, possibly outside the farm-in area, needs approvals.

Value this in the calculator →Discuss in chat

14 June 2011drilling progress report● Neutral

Lydia-13 is being cored at 759m, with logging and testing to follow. It is the last well of the four-well programme this budget year. A further programme from 1 July is possible, subject to board and partner approval.

Value this in the calculator →Discuss in chat

7 June 2011drilling result▼ Bad

Lydia-12 reached 900m with 8.9m of coal, and all three drill stem tests showed low permeability. The joint venture plugged and abandoned it. The rig moved to Lydia-13, spudded 6 June. Third consecutive poor result.

Value this in the calculator →Discuss in chat

31 May 2011drilling progress report● Neutral

The rig returned to Lydia-12, and the stuck drilling assembly was recovered on 30 May. Drilling restarted on 31 May. (The release says it returned on 25 March, which appears to be a typo for May.)

Value this in the calculator →Discuss in chat