Stockle - the stock oracle

Challenger Gold Ltd

ASX:CEL
A$1.60Close 7 Oct 2026 · delayed

Past year: ▲ 1131%(11.5c – 2.07 AUD)

Market cap
A$236m
Shares on issue
148m
In-ground value
A$127m
Risked multiple
0.51×
Story beats
175 since 2007
Last event
13 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

31 July 2026drilling result▲ Good

Remaining toll-pit infill results released, completing the program part-reported on 30 April. Highlights include 5m at 19.8 g/t AuEq (Norte) and 16m at 2.5 g/t AuEq (Magnata). No overall grade comparison is given in the excerpt.

Value this in the calculator →Discuss in chat

30 July 2026drilling spud▲ GoodMajor

Exploration drilling restarts at Hualilan, the first in over three years: two of four rigs running on a minimum 35,000m program (about 5,000m geotechnical). Targets are extensions at depth and along strike plus resource conversion; El Guayabo data review also begun.

Value this in the calculator →Discuss in chat

18 May 2026resource reserve update▲ GoodMajor

Stand-alone Hualilan PFS completed, resolving the Q1 2026 thread: 14.25-year mine, 1.84Moz AuEq, start-up capex US$232m. At US$3,500 gold, pre-tax NPV5 is US$1.45bn and AISC US$1,618/oz. Maiden Ore Reserves of 1.5Moz Au.

Value this in the calculator →Discuss in chat

30 Apr 2026drilling result▲ Good

Results from about 60% of the 10m-spaced infill drilling in the Hualilan toll pits. Magnata averages 7.0 g/t Au above cut-off versus 6.2 g/t in the June 2025 toll-milling PFS, with a best intercept of 8m at 17.1 g/t AuEq. Sanchez results suggest the pit could be deepened.

Value this in the calculator →Discuss in chat

9 July 2025drilling result▲ GoodMajor

Heap-leach column tests on Hualilan's low-grade halo gave average gold recovery of 75% (up to 85%) at half-inch crush. This could let material treated as waste in the 2023 Scoping Study be processed; full stand-alone PFS metallurgy due early Q4 2025.

Value this in the calculator →Discuss in chat

4 June 2025resource reserve update▲ GoodMajor

Toll-milling pre-feasibility study done, completing the thread open since the Scoping Study: 76.6koz payable gold from 465kt at 6.2 g/t, US$8.9m upfront. At US$2,500/oz, NPV5 US$50.5m; at US$3,300/oz, US$82.2m. Recoveries assumed 84.4%.

Value this in the calculator →Discuss in chat

9 Apr 2025resource reserve update▲ GoodMajor

Ecuador resource doubles from 4.5Moz to 9.1Moz AuEq (570Mt at 0.50 g/t), including a maiden 4.4Moz at Colorado V; 6.9Moz is attributable to CEL. Exploration there is declared complete, with TSX spin-off, sale or farm-in under consideration.

Value this in the calculator →Discuss in chat

13 Nov 2024drilling result▲ GoodMajor

Six more Colorado V holes in Ecuador, with intercepts up to 711.6m at 0.4 g/t AuEq, confirm the 400x800m CV-A anomaly is mineralised from surface. The program is complete, with four holes pending, and a maiden resource is expected before the planned monetisation of Ecuador.

Value this in the calculator →Discuss in chat

26 July 2024drilling result▲ Good

First five holes of the Colorado V resource drilling hit about 500m intercepts at 0.3-0.4 g/t AuEq, including 599.1m at 0.4 g/t AuEq. 5,100m of the 8,000m is drilled. A maiden resource is expected on completion, ahead of the planned Ecuador sale.

Value this in the calculator →Discuss in chat

29 Apr 2024drilling result▲ Good

Soil sampling with Ionic Leach assay defines a 5km by 4km copper anomaly 5-10km southeast of Hualilan, with a coincident iodine anomaly, under cover with no prior exploration. Sampling is being extended over a further 150 km2; no drilling yet.

Value this in the calculator →Discuss in chat

23 Aug 2023drilling result▲ Good

First rock-saw channel samples at El Guayabo include 174.4m at 1.2 g/t AuEq, 300m beyond any drilling, and results extending the high-grade core 200m up to surface. These may feed a future resource update, which also awaits the final five drill holes.

Value this in the calculator →Discuss in chat

19 July 2023drilling result▲ Good

Hualilan regional work finds new targets: a mineralised system 2.5km west of the Magnata Fault, and a 48 km2 magnetic survey started at El Penon to plan a first drill program. Earlier high-grade samples are repeated. Program is under 40% complete; Lo Que Vendra concessions were granted.

Value this in the calculator →Discuss in chat

14 June 2023resource reserve update▲ GoodMajor

First El Guayabo resource: 270Mt at 0.52 g/t AuEq for 4.5Moz (Inferred), with a 1.45Moz core at 1.0 g/t. Resolves the maiden resource thread; excludes the final five holes. Firm commitments for a A$10m placement, mainly for the Hualilan pre-feasibility study and regional work.

Value this in the calculator →Discuss in chat

18 May 2023drilling result▲ Good

Latest El Guayabo holes all hit gold. GYDD-23-039 at GY-C returned 805.3m at 0.6 g/t AuEq, including 231.2m at 1.5 g/t, the first sign GY-C could host significant resource. GY-B and GY-C appear to join into a zone 700m wide. Maiden resource still pending.

Value this in the calculator →Discuss in chat

1 May 2023drilling result▲ Good

First regional sampling around Hualilan finds high-grade gold, up to 54.4 g/t Au in stream sediments at El Peñon, 10km north-west, and rock chips up to 90.7 g/t Au within 300m east of the resource. Early stage: under 5% of the 600 sq km tenements mapped.

Value this in the calculator →Discuss in chat

5 Apr 2023drilling result▲ GoodMajor

Six more El Guayabo GY-A holes hit mineralisation, including 1,190m at 0.3 g/t AuEq in GYDD-22-025, the longest intercept yet. GY-A and GY-B appear to merge into one zone over 1km thick. Maiden resource is expected in May.

Value this in the calculator →Discuss in chat

29 Mar 2023resource reserve update▲ GoodMajor

Hualilan resource upgraded to 2.8Moz AuEq from the maiden 2.1Moz, with a high-grade core of 1.6Moz at 5.0 g/t. 67% is now Indicated (38% before), supporting a possible move from the Scoping Study straight to a PFS. Resource remains open.

Value this in the calculator →Discuss in chat

21 Mar 2023drilling result▲ Good

CEL reported more Verde Zone results at Hualilan, including 30.0m at 4.0 g/t AuEq in GNDD-741 and 35.2m at 3.5 g/t AuEq in GNDD-790, which found a new zone open at depth. With the extra drilling nearly complete, the exploration team turned to over 20km of untested strike.

Value this in the calculator →Discuss in chat

20 Feb 2023drilling result▲ GoodMajor

Two new high-grade zones found at Magnata, including 15.2m at 4.7 g/t AuEq, plus Sentazon extensions. CEL also agreed to acquire 20,000 ha of land covering Hualilan to simplify permitting. Updated resource still expected in March.

Value this in the calculator →Discuss in chat

7 Feb 2023drilling result▲ Good

More Hualilan results from the Verde Zone, including 42.0m at 5.9 g/t AuEq and 1.9m at 124.9 g/t in GNDD-711, a high-grade northern extension. Drilling is midway through the extra 50,000m; the updated resource is expected in coming weeks.

Value this in the calculator →Discuss in chat

18 Jan 2023drilling result▲ GoodMajor

All 11 remaining El Guayabo regional holes hit, with discoveries on 4 of 8 anomalies. GY-B Phase 2 hole GYDD-22-024 returned 108.5m at 2.4 g/t AuEq including 54.2m at 4.0. Resource drilling on GY-A is underway toward the maiden resource.

Value this in the calculator →Discuss in chat

7 Dec 2022drilling result▲ GoodMajor

Hualilan drilling finds a new deep high-grade zone, 'Sentazon Deeps', including 50.0m at 3.4 g/t AuEq with 22.5m at 7.0 g/t. Mineralisation extends over 100m south and 400m downdip of the 2.1Moz resource boundary, feeding an updated resource planned for Q1 2023.

Value this in the calculator →Discuss in chat

31 Oct 2022drilling result▲ Good

First Hualilan results after the 2.1Moz resource extend Verde and Magnata, including 65.3m at 2.4 g/t AuEq and 12.2m at 11.0 g/t. Some holes lie 1km west of the resource boundary; management expects the resource to grow. Part of the 29,000m of assays pending.

Value this in the calculator →Discuss in chat

5 Oct 2022drilling result▲ GoodMajor

Next five Colorado V holes extend both discoveries, including 402.8m at 0.6 g/t AuEq and 62.4m at 1.8 g/t within 773.9m at 0.4 g/t. First wide higher-grade zone there; three holes ended in mineralisation. Builds on earlier 500m-plus hits.

Value this in the calculator →Discuss in chat

21 Sept 2022drilling result▲ Good

More post-resource Hualilan holes extend Verde and Magnata mineralisation, e.g. 11.0m at 9.1 g/t AuEq, some by 200m. The funded extra 50,000m takes the Hualilan program to 254,000m; 29,000m of assays remain pending for the updated resource.

Value this in the calculator →Discuss in chat

4 July 2022drilling result▲ Good

Three more Colorado V holes extend both discoveries, including 564.1m at 0.4 g/t AuEq; CV-A mineralisation is over 600m wide and extends outside the soil anomaly. Continues the 1 July-era run of hits; five of fifteen anomalies drilled.

Value this in the calculator →Discuss in chat

24 June 2022drilling result▲ Good

First Hualilan holes drilled after the 2.1Moz resource cut-off extend mineralisation outside it, e.g. 28.5m at 5.3 g/t AuEq, 60m below the Verde boundary. 197,000m of the 204,000m program is done; management expects the resource to grow, with assays pending.

Value this in the calculator →Discuss in chat

6 June 2022drilling result▲ GoodMajor

First two Colorado V holes both hit about 500m of mineralisation from surface, e.g. 528.7m at 0.5 g/t AuEq, confirming two discoveries on soil anomalies 1km long. Two more El Guayabo holes confirm 1km of continuous mineralisation. Five of fifteen soil anomalies now drilled, all hit. Grades are modest.

Value this in the calculator →Discuss in chat

1 June 2022resource reserve update▲ GoodMajor

Maiden JORC resource for Hualilan of 2.1 million oz AuEq: skarn 6.3Mt at 5.6 g/t (1.1Moz) and intrusion/sediment-hosted 41.4Mt at 0.8 g/t (1.0Moz). Based on 125,700m of the drilling; scoping study to start after drilling finishes. Replaces the old non-JORC historical estimate.

Value this in the calculator →Discuss in chat

3 May 2022drilling result▲ GoodMajor

Hualilan metallurgy: average gold recovery lifted to 95% across ore types, with zinc (89%) and lead (77%) recoverable from skarn. Better concentrates and a direct rail route to Rosario Port cut transport costs. Supports the planned scoping study; further testing ongoing.

Value this in the calculator →Discuss in chat