3 Sept 2026drilling result▲ GoodMajor
Whalers reached planned depth with casing cemented and Rig 18 released, completing drilling of both Suttles wells with full planned laterals in target formations. Zipper-frac completion is next, then sales. No flow rates or costs reported yet.
Completed purchase of Lone Star's US oil and gas interests, a Stonehorse subsidiary, for US$1.114m (~US$9,100 per flowing BOE/d). Adds ~123 BOE/d, about 9% of Q2 production, with no new shares issued. Stonehorse is Brookside's Orion partner.
Whalers intermediate casing is cemented and the curve landed in the targeted Woodford bench. It is drilling ahead in the lateral. Simultaneous fracture stimulation of both wells follows once production casing is in.
Sabres reached its planned ~14,200 feet total depth with 5½-inch casing cemented and tested. Whalers has been spudded. Both wells will be fracture-stimulated together once Whalers is drilled. No flow results yet.
Sabres intermediate casing set and pressure tested, curve landed in the Sycamore, and the lateral is being drilled at about 9,800 feet measured depth. Proceeding to plan; Whalers follows. No production result yet.
Sabres spudded 7 July 2026 as the first of two Suttles wells, targeting the Sycamore at about 7,700 feet with a ~1.5-mile lateral. Brookside holds ~70% working interest. Whalers follows. This ends the wait for Rig 18 and the earlier May start.
Production facilities at the Suttles pad are substantially complete for Sabres and Whalers. Rig 18 is nearing release from its current job; power and gas pipeline work is under way. No spud date given, so the May start has slipped.
2026 AGM presentation restating known points: FY2025 sales revenue A$53.8m, 661,964 BOE net production, 12.52 MMBOE 2P, A$14.54m cash at Q1 2026. NYSE American ADR listing still 'targeted for 1H2026'. No new information visible in the readable text.
At the Suttles pad, the 20-inch conductor is set for Sabres and Whalers, the pad is complete and key vendors are contracted. Surface facilities are being built. The pad awaits Rig 18; no spud date is given, so the earlier May start is not confirmed.
Riverbend update: more than 40% of the initial leasehold objective is now secured, with title and regulatory planning continuing. Still in the land and planning phase; no drilling timing given, and reserve-definition drilling depends on acreage, approvals and capital.
The Chair urges a vote for the Remuneration Report after a first strike at last year's AGM (47.44% against). A second strike would trigger a spill resolution. Proposed incentives would be 50:50 relative and absolute TSR. Also says the share price rose up to 54% in seven weeks to 21 April.
Brookside signed a drilling contract with Kenai Drilling for Rig 18 to drill the Sabres and Whalers wells (about 1.5-mile laterals) on the Suttles pad. The rig moves over after finishing a job in the Ardmore Basin; earthworks are nearly done.
Appendix 4G and corporate governance statement for the year to 31 December 2025, current at 31 March 2026. Routine compliance filing with no new operational or financial information.
March deck restating known points: FY2025 net production 1,790 BOE/d, 12.5 MMBOE 2P, 19 PUDs, A$11.8m cash, undrawn US$25m facility. Quotes EV/2P of US$1.70/BOE (US$1.45 earlier). NYSE American ADR listing still targeted for 1H2026.
Site works have started at the next SWISH two-well pad (Sabres and Whalers, targeting Sycamore and Woodford), with drilling on track for May 2026. This is the first new drilling since Bruins and follows the Q4 2025 note of no new drilling.
Year-end 2025 reserves certified by Haas & Cobb: 2P 12.52 MMBOE (12.35 prior), 1P 5.33 (4.98) and PDP 2.80 (2.65). Additions exceeded the 2025 production of ~662,000 BOE, so 2P is essentially flat.
February webinar deck restating known facts: FY2025 net production 1,790 BOE/d, 12.4 MMBOE 2P, A$11.8m cash, undrawn US$25m facility. The NYSE American ADR listing target has moved to 1H2026 from 2H2025.
ASX queried a rise in the share price (A$0.46 to A$0.525) and heavy volume. Brookside said it knew of no undisclosed information, and attributed the trading to a commissioned East Coast Research report, based only on public information, released that morning.
October investor deck restating known points: 2Q2025 net production ~1,850 BOE/d, 12.4 MMBOE 2P, 19 undrilled locations, A$8.3m cash and an undrawn US$25m facility. The NYSE American ADR listing is targeted for 2H2025. No new results.
Brookside adds a new Riverbend area of interest (~24 sq miles) in the Anadarko Basin and has begun leasing up to four 1,280-acre units. Company modelling shows up to ~76% return and ~630,000 BOE per well base case. These are company estimates; no drilling is planned yet.
Half-year to 30 June 2025: sales revenue nearly doubled to A$30m (A$15.4m in 1H2024), EBITDA A$13.6m, profit A$5.0m (up 53%). Cash was A$8.3m and net assets A$95.8m. Bruins is on production and the fifth drilling unit added, as previously reported.
Chris Weatherl, a petroleum engineer with 25+ years' experience including Apache and, most recently, COO of Rimrock Resource Operating, joins as Non-Executive Director, effective immediately. The company links it to growth plans and the planned NYSE American ADR listing.
Bruins early results: about 36,900 BOE produced (71% liquids), peak 24-hour rate ~1,040 BOE/d and 30-day rate ~750 BOE/d. Company estimates ~1.1m BOE gross reserves, ~67% return and ~3.75-year payout at ~79% working interest (above the ~70% expected earlier).
July investor deck restating known points: 1Q2025 net production 1,920 BOE/d, 12.4 MMBOE 2P, five operated units, 19 undrilled locations, an undrawn US$25m facility, and no debt. It flags a new buy-back of up to 5% and NYSE American listing, both slated for the second half of 2025.
24 June 2025asset acquisition disposition▲ GoodMajor
Brookside added a fifth SWISH drilling unit, 960 acres next to its Jewell and Bruins units, lifting its drilling inventory by about 26%. This is the fifth unit it was pursuing. Initial plan is two ~8,000ft wells (Sycamore and Woodford) once the unit is approved; no timing or cost given.
Brookside says industry activity points to two possible new zones in its SWISH acreage, the Simpson Group sands and Caney Shale, with Continental Resources active. It is only monitoring them; no drilling or spending by Brookside is announced.
First oil and gas sales were established from the Bruins well, 14 weeks after its 25 February spud, on budget and on schedule. It is the ninth operated SWISH well and the first of the 2025 program. Initial rates will be reported once stabilised.
AGM presentation restating known facts: FY2024 production 525,456 BOE, 2P 12.35 MMBOE, A$12.7m cash against a A$35.4m market cap (A$0.37 share price, 96.0m shares at 20 May). Cites Bruins and the NYSE listing as near-term catalysts; no new results.
Stimulation of the Bruins well finished safely, on time and within budget, with all 42 stages completed to design. Plugs are drilled out and tubing installed; flow-back and testing come next, with first sales still targeted for the June quarter. No flow rates yet.