Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

26 Sept 2007drilling progress report● Neutral

Freeborn-1 has set 13 3/8 in casing at 3,026 ft and will drill toward about 9,500 ft. A service rig is on site at Outlar-1 to inspect casing and run a cement bond log before testing.

Value this in the calculator →Discuss in chat

24 Sept 2007drilling spud▲ GoodMajor

Jean H. Freeborn-1 spudded 20 September on the Rowena Wilcox prospect, targeting 16,000 ft with potential over 200 BCF. Antares holds 50% with minimum dry cost about USD2.85m. Turnkey contract fixed at USD4.9m. The CEO calls it transformational if it succeeds.

Value this in the calculator →Discuss in chat

19 Sept 2007drilling progress report● Neutral

Outlar-1 casing is cemented and the rig was released 15 September to move to Freeborn-1. A service rig will arrive to test the three sand sequences, starting with the lowest.

Value this in the calculator →Discuss in chat

12 Sept 2007half year report▼ BadMajor

Half-year to 30 June 2007: net loss $11.4m including $9.1m of write-offs and impairment on failed wells and Oklahoma assets. Oklahoma assets are to be sold to Exoma for USD4.35m. $11.2m of new convertible notes were issued.

Discuss in chat

12 Sept 2007drilling result▲ GoodMajor

Outlar-1 reached 11,911 ft. Preliminary logs suggest the primary sand is hydrocarbon bearing, with two deeper sands possibly productive and very good reservoir quality. Production casing is being run ahead of testing. Early encouraging sign for the West Wharton project (30%).

Value this in the calculator →Discuss in chat

4 Sept 2007investor presentation● Neutral

Good Oil Conference presentation by the CEO repeating known facts. It shows 158.5m shares, A$14.9m cash at 30 June 2007, no bank debt, and 10.5m convertible notes outstanding. No new results.

Discuss in chat

29 Aug 2007drilling progress report▲ Good

Outlar-1 is at 10,000 ft with gas shows in the secondary Yegua target. The primary objective is expected next week. The Freeborn-1 site is ready for the rig.

Value this in the calculator →Discuss in chat

22 Aug 2007production update● Neutral

Outlar-1 is at 7,025 ft. Oyster Creek is producing: Harrison-1 about 1.1 MMcf/d and Scott-2 about 900 Mcf/d. Garcitas C-1 makes 1.7 MMcf/d. C-2 needs a compressor to lift fluids. Freeborn-1 spud is expected in the second half of September.

Discuss in chat

21 Aug 2007contract award▲ GoodMajor

San Isidro signed a fixed-cost turnkey contract with Orion to drill Jean H. Freeborn-1, the first well on the large Rowena Wilcox prospect (over 200 BCF P50). Antares holds 50%, with minimum cost about USD2.75m dry. It may farm down to 40%.

Discuss in chat

14 Aug 2007drilling spud● NeutralMajor

Outlar-1, the first West Wharton well, spudded 12 August and is drilling at 1,536 ft toward 11,500 ft. Antares holds 30% (26.25% after first sales). Minimum cost has risen to about USD1.3m dry or USD1.6m completed, under a fixed-cost contract.

Value this in the calculator →Discuss in chat

25 July 2007drilling result▼ BadMajor

Zwernemann-1 on Shaeffer Ranch found only sub-commercial gas and will be plugged and abandoned, costing Antares about USD350,000 net. Oyster Creek pipeline is complete and production has started, ending the long wait. Garcitas tests were below expectations.

Value this in the calculator →Discuss in chat

4 July 2007regulatory community update▼ Bad

Severe Texas flooding has stopped all work at Oyster Creek and Little Bear. Weekly reporting ends, with updates only on material events. Yellow Rose seismic acquisition is complete and Ilse-1 remains shut in without an operator recommendation.

Discuss in chat

3 July 2007other● Neutral

Notice that the convertible note quarterly interest of $0.0504 per note is payable 31 July 2007 (record date 24 July). Administrative; no new substance.

Discuss in chat

27 June 2007drilling progress report● Neutral

Zwernemann-1 testing is in its third logged interval. Ilse-1 stays shut in awaiting an operator recommendation, and Garcitas testing continues. Yellow Rose seismic is about 85% done, with flooding interrupting work.

Value this in the calculator →Discuss in chat

20 June 2007well test result▼ BadMajor

The Ilse-1 pressure build-up test was not encouraging, so the Middle Wilcox zone probably has limited commercial potential. The well is shut in while Upper Wilcox options are reviewed. This weakens the earlier hopes for the New Taiton prospect, where Antares holds 25%.

Discuss in chat

13 June 2007drilling progress report▼ Bad

The Ilse-1 Lower Wilcox fracture stimulation recovered about 38% of frac fluid, with only sub-commercial intermittent gas so far. It is too early to draw conclusions. C-2 is shut in for a pressure survey and Zwernemann-1 testing is being prepared.

Value this in the calculator →Discuss in chat

6 June 2007flow test result▲ GoodMajor

Garcitas C-2 flowed 2.2-2.5 MMcf/d and 100-120 bbl/d condensate from a 13 ft Middle Wilcox interval with no water. Zwernemann-1 reached 6,100 ft with indicated oil and gas pay. Oyster Creek first gas sales have slipped from May to early July.

Discuss in chat

30 May 2007drilling progress report● Neutral

Zwernemann-1 spudded 25 May and is drilling at 3,611 ft. Ilse-1 fracture stimulation is set for 6 June. Garcitas C-1 is producing and C-2 is testing. Yellow Rose seismic is about 66% complete.

Value this in the calculator →Discuss in chat

23 May 2007drilling scheduled● Neutral

Antares (50%) expects to spud the shallow Zwernemann-1 oil well on Shaeffer Ranch within three days, to about 6,100 ft. Potential is about 200,000 bbl of oil and 1.8 BCF of gas. Dry hole cost to Antares is USD225,000.

Value this in the calculator →Discuss in chat

23 May 2007drilling progress report● Neutral

Ilse-1's lowest zone has been perforated, with fracture stimulation expected within days. Garcitas C-2's lowest sand was fracture stimulated and will be flow tested. C-1 is in production. Yellow Rose seismic is about 60% complete.

Value this in the calculator →Discuss in chat

16 May 2007drilling progress report● Neutral

Ilse-1 is nearly ready, with a Lower Wilcox zone to be perforated and flow tested over about 14 days. Garcitas C-2 is tied in and testing has started. Yellow Rose seismic is about 54% complete.

Value this in the calculator →Discuss in chat

9 May 2007drilling progress report● Neutral

Partner Adelphi repeats that the Ilse-1 pipeline should finish this week, with testing to follow. Antares holds 25%. Re-release of information already reported; no new result.

Value this in the calculator →Discuss in chat

9 May 2007drilling progress report● Neutral

Ilse-1 pipeline due to finish this week, with testing to follow. Garcitas C-2 tie-in is nearly done, with testing expected next week. Yellow Rose seismic is about 50% complete.

Value this in the calculator →Discuss in chat

7 May 2007investor presentation● Neutral

AGM chairman's address and slides recap known results: six wells drilled with five expected commercial, Garcitas C-1 selling gas, two new projects, and more convertible notes issued. Shaeffer Ranch deep structure may be farmed out before drilling. No new results.

Discuss in chat

2 May 2007drilling progress report▲ Good

Garcitas C-1 is selling gas, with its first stimulated thin sand flowing 1-3 MMcf/d with water, described as a good initial result. Ilse-1 testing awaits a pipeline after heavy rain. C-2 completion is being finalised and Yellow Rose seismic is about 40% done.

Value this in the calculator →Discuss in chat

1 May 2007farm in farm out agreement▲ GoodMajor

Antares takes a 30% interest in the new West Wharton project in Wharton County, Texas, to drill a 12,000 ft Cook Mountain prospect with potential of 40-80 BCF. Minimum commitment is about USD0.9m dry hole and USD1.15m completed; interest falls to 26.25% at first sales.

Value this in the calculator →Discuss in chat

26 Apr 2007drilling progress report● Neutral

The Ilse-1 test program has now been agreed by the joint venture, with test equipment to be set up once the rig is moved off. Garcitas C-1 testing continues and Yellow Rose seismic is about 25% complete.

Value this in the calculator →Discuss in chat

18 Apr 2007drilling progress report● Neutral

Oyster Creek surface facilities are being built, with first sales tentatively targeted for mid-May. Ilse-1 testing awaits partner agreement, Garcitas C-1 is assessing the first stimulated zone, and Yellow Rose seismic is about 15% done.

Value this in the calculator →Discuss in chat

13 Apr 2007other● Neutral

Notice that the convertible note quarterly interest of $0.0488 per note is payable 30 April 2007 (record date 23 April). Administrative; no new substance.

Discuss in chat