Stockle - the stock oracle

ADX Energy Ltd

ASX:ADX
A$0.019Close 7 Oct 2026 · delayed

Past year: ▼ 37%(1.80c – 3.20c AUD)

Market cap
A$20.4m
Shares on issue
1.08bn
In-ground value
A$1.76bn
Risked multiple
under review
Story beats
268 since 2006
Last event
28 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

1 May 2007drilling progress report● Neutral

Sarahlyn-1 is at 2,685m in tight Patchawarra sandstone with no fluorescence. Gas readings of 100-300 units continue from 2,475m, to be evaluated at total depth.

Value this in the calculator →Discuss in chat

26 Apr 2007drilling progress report● Neutral

Sarahlyn-1 is at 2,332m. A poor fluorescence show was seen at 2,043-2,052m, to be evaluated by logs after reaching depth. No shows in the Hutton or Poolowanna formations.

Value this in the calculator →Discuss in chat

20 Apr 2007drilling progress report● Neutral

Sarahlyn-1 has run and cemented its surface casing at 980m and is waiting on cement. Drilling of the next hole section is expected to start next day.

Value this in the calculator →Discuss in chat

16 Apr 2007drilling spud▲ GoodMajor

Sarahlyn-1 spudded 16 April 2007, the first PEL-182 well since Emily-1 in January 2006. It is drilling surface hole at 80m toward a planned 2,730m depth.

Value this in the calculator →Discuss in chat

12 Apr 2007drilling scheduled▲ Good

Century Rig-3 contract for Sarahlyn-1 and Vanessa-1 (option for two more) is signed and the rig is mobilised, with first spud expected 14 April 2007. This ends the flood delay; AuDAX's PEL-182 interest is shown as 49.9%.

Value this in the calculator →Discuss in chat

20 Mar 2007drilling scheduled▼ Bad

Flooding on Cooper Creek and local roads is delaying the start of PEL-182 drilling. Century Rig 3 is stacked at Moomba, and its option remains in force. Contract signing and mobilisation will follow once site access opens.

Value this in the calculator →Discuss in chat

11 Apr 2006farm in farm out agreement▲ GoodMajor

Falcon Minerals can earn 70% of the nickel and associated base metal rights at the Marymia project by spending $1.75m within 5 years, with at least $150,000 in the first 12 months. AuDAX keeps all gold rights.

Value this in the calculator →Discuss in chat

24 Jan 2006drilling progress report● Neutral

Emily-1 has run 7 inch production casing, with cementing and rig release due next. This is the final report; the well is cased and suspended after the small oil recovery.

Value this in the calculator →Discuss in chat

20 Jan 2006drilling progress report● Neutral

Emily-1 wireline logging is complete. A drill stem test is planned over 1,901-1,907.5m in the lower Birkhead, where the best shows and a log anomaly were seen.

Value this in the calculator →Discuss in chat

18 Jan 2006drilling progress report● Neutral

Emily-1 reached total depth of 2,324m (planned 2,364m) with no further shows. Wireline logs follow, and drill stem tests may be run on any shows.

Value this in the calculator →Discuss in chat

17 Jan 2006drilling progress report▼ Bad

Emily-1 is at 2,186m in the Tinchoo Formation. No significant shows in the Poolowanna or top Tinchoo, two of the three objectives; logs will evaluate further. This is less encouraging than the earlier Birkhead/Hutton show.

Value this in the calculator →Discuss in chat

16 Jan 2006drilling result▲ GoodMajor

Emily-1 recorded a fair oil show at 1,901.5m near the base Birkhead/top Hutton, in the primary objective, and the zone warrants testing. Rain closed roads and blocked test equipment, so testing is deferred to wireline logs and a possible later test. Well is at 2,027m.

Value this in the calculator →Discuss in chat

9 Jan 2006drilling spud● NeutralMajor

Emily-1 spudded on 7 January 2006 and was drilling surface hole (448m at report time) towards a planned 2,364m. This starts the PEL-182 drilling programme in which AuDAX holds 39.9%.

Value this in the calculator →Discuss in chat

5 Jan 2006drilling scheduled▲ GoodMajor

Operator Eagle Bay announced Emily-1, the first well in the new PEL-182 Cooper Basin permit, with AuDAX holding 39.9%. Pre-drill estimate is 10.5 million barrels of recoverable oil (P50), only if oil is present. Target depth is 2,364m.

Value this in the calculator →Discuss in chat