History
Vizsla Silver turned a 2022 maiden silver-gold resource at Panuco into a feasibility study and large financings, while a 2026 security crisis halted site work.
2022: Copala and a first resource
Vizsla Silver's story in this record centres on Panuco, a silver-gold project in Sinaloa, Mexico. The record starts in March 2022, so the earlier discovery work is not covered here. That month, drilling on the newly found Copala vein returned 2,142 g/t silver-equivalent over 7.81 metres, and Copala later became the core of the project. Holes along the Napoleon corridor stretched the Napoleon vein to 2,500 metres of strike. In April the company filed its first mineral resource estimate: 61.1 million ounces of silver-equivalent indicated and 45.6 million inferred. Drilling through the year widened Copala's high-grade footprint to 900 by 400 metres. In November the company raised C$34.5 million at C$1.45 a unit, each carrying half a warrant.
2023: The resource doubles
In January 2023 the resource grew sharply: indicated ounces rose 71% to 104.8 million and inferred rose 150% to 114.1 million. Copala alone supplied 51.1 million indicated ounces. In February the company raised C$45.0 million at C$1.65 a share, with no warrant attached. Infill drilling in the southeast-central part of Copala showed high-grade continuity within the resource wireframe. La Luisa, a discovery from October 2022, was extended in March and again in September. In August, metallurgical tests on Copala samples recovered 91% of the silver and 94% of the gold.
2024: Royalty spin-out, new ground and a first study
The January 2024 update lifted indicated ounces to 155.8 million and brought in La Luisa for the first time. The company also announced it would give shareholders a separate listed company, Vizsla Royalties, holding a 2.0% royalty over most of Panuco. The spin-out took effect on 24 June, so Panuco now owes a royalty to a company Vizsla Silver does not own. In March the company raised C$34.5 million at C$1.50 and agreed to buy the undrilled La Garra-Metates district, which closed in October for US$3,075,000 in cash and 5,555,555 shares. In June, hole CS-24-356 gave the highest-grade intercept reported at Panuco, 9,920 g/t silver and 663 g/t gold over 0.64 metres. The July economic assessment put the build cost at US$224 million, with an after-tax value of US$1,137 million and average output of 15.2 million ounces a year. In September the company raised C$65 million at C$2.60, 73% above the February price. In December it began a test mine and bulk sample at Copala.
2025: Setbacks and a larger company
The January 2025 update added a measured category, taking measured and indicated ounces to 222.4 million. On 9 January a landslide on a drill pad killed an employee of contractor Bylsa Drilling and critically injured another, and work was suspended before a limited restart on 21 January. In March a hole on the Animas vein, six kilometres northeast of Copala, returned 897 g/t over 5.85 metres, the first real hit in the search for a second deposit. No follow-up is reported. In April all field work was paused because of security conditions, and test mining resumed by June. In May the company agreed to acquire Santa Fe, which includes a permitted 350-tonne-a-day mill. In June it raised US$100 million at US$3.00 a share, its first offering priced in US dollars. Shares on issue rose from about 155 million at the end of 2022 to about 298 million at the end of 2025, reflecting these raisings and the shares issued for La Garra-Metates.
2025-2026: Feasibility, convertible notes and crisis
In September 2025 the company signed a mandate letter with Macquarie for up to US$220 million of secured project finance. The 12 November feasibility study put the build cost at US$173 million, with an after-tax value of US$1.8 billion, a 111% return and production targeted for the second half of 2027. Eight days later the company priced US$250 million of 5.00% convertible notes due 2031, convertible at about US$5.84 a share. On 2 December it confirmed these notes replaced the Macquarie mandate, which was never drawn.
On 9 February 2026 the company reported that colleagues taken from its Concordia project site had been found dead. By 5 March it described ten colleagues taken, two more confirmed deaths and three still missing. It cooperated with Mexican authorities, reviewed its security protocols and gave no restart date for site work. On 23 April it awarded engineering and construction management work to M3 Engineering and mine design to Mining Plus, both working off site. In May it announced a MXN$173 million working capital facility, and restated that no construction decision had been made. On 16 June 2026 it awarded FLSmidth the equipment supply agreement for eight major packages, with formal notice to proceed still to come.
Written from the 45 story beats below (2022 to 16 June 2026), which come from the company's own announcements and filings.