History
Red Sky Energy listed in 2007 chasing Cooper Basin oil, then went through gas, solar and US wells before settling on South Australian assets and Angola.
2007-2008: Listing and dry holes
Red Sky Energy listed on the ASX on 21 May 2007 under the code ROG, issuing shares at 20 cents. It raised about $6.05 million, short of the $8 million sought. It held farm-in interests (deals to fund wells in return for a stake) in Cooper Basin permits and in Western Australia's EP 444. Its pitch was a geochemical survey method from major shareholder Sky Hunter.
The method was tested quickly and failed. Rainbird-1 was abandoned as a dry hole in August 2007 and Patron-1 followed in October. About $2 million went on the wells and $1 million on Darling Basin seismic. By November 2007 Red Sky had dropped EP 444, and it said weak markets were hampering the search for more funds. Klaus Zahnd retired as chairman in May 2008 and Barry Adams took over. In December 2008 it let its Darling Basin permits lapse and gave up its right to earn into PEL 93, citing the need to preserve cash.
2009-2011: Coal seam gas
In February 2009 a $350,000 placement at 0.2 cents came with a change of control of the board. Planet Downs-1 then failed in March, and the $1 million deposit behind it yielded nothing. March quarter cash was down to $71,000.
The company changed strategy. In September 2009 it bought Cydonia Resources, with two Surat Basin coal seam gas permits, and raised $4 million. Rohan Gillespie became Managing Director. Purchases of Norwest Hydrocarbons and Surat Resources, both with northern NSW permits, followed, funded by a $4.5 million placement in November 2009. Shares on issue reached about 971.5 million.
Results were mixed. Romona #1 found little coal in February 2010. A farm-in with Central Petroleum ended in a dispute, default notices and a settlement in July 2010 under which Red Sky withdrew. The Clarence Moreton Basin in NSW was the bright spot. Annvale #1 and Talma #1 earned Red Sky 30% in two permits, and in March 2011 independent certification gave maiden 2P reserves and a 210% rise in 3P reserves. In June 2011 it let an option to lift its stake lapse and narrowed its focus to the Clarence Moreton Basin and ATP 946.
2012-2014: Partners, solar and retreat
Talma pilot approval took until May 2012. In September 2012 a deal with ERM Gas closed: ERM would fund six to nine wells and pay Red Sky up to $2.7 million on milestones, while Red Sky issued it 150 million shares and dropped to 20%. The same year Red Sky bought solar developer SOLEIR, a move beyond gas. In January 2013 it exited the ATP 946 farm-in, citing compliance costs and permitting uncertainty.
The Dubbo solar project slipped repeatedly and was scaled back in November 2013. Red Sky withdrew from ATP 840 in December 2013 to avoid an $8 million well. In January 2014 it agreed to sell its 20% of the Clarence Moreton permits to ERM for $1.685 million. Gillespie resigned in October 2014.
2014-2017: Cache, Gold Nugget and collapse
In November 2014 Red Sky signed to buy 50% of the Cache oilfield in Colorado, which made about 12 barrels a day. The deal was completed in July 2015, paid largely in shares at 0.1 cent, and shares on issue rose to about 5.69 billion. Cache was never developed. Permitting delays led to it being put on care and maintenance, and it was written down in December 2016. Red Sky disposed of its interest for nominal consideration in August 2017.
In May 2016 the company completed the Gold Nugget gas well in Wyoming for US$450,000 plus 336.3 million shares. Flows disappointed, at 300 to 500 mcf a day, below the 500 to 1,000 expected, and September 2016 quarter cash was A$25,000. A recapitalisation led by RM Corporate Finance included a $1 million convertible note and a 50-to-1 share consolidation, which cut 6.16 billion shares to about 123 million. The note later converted at 0.3117 cents, and shares stood at 608.7 million by August 2017.
2018-2021: Innamincka and Killanoola
Andrew Knox became CEO in July 2018. Red Sky agreed to buy Beach Energy's Innamincka Dome interests in the Cooper Basin, funded by a planned $2.2 million raising at 0.4 cent. The rights issue drew only about $53,000, and the deal was completed in March 2019 after a $342,000 placement at 0.18 cent. Red Sky took the remaining 25% of PRL182 in May 2019 and held all six permits. In September 2019 Santos agreed to fund up to A$9 million to earn 80% and operatorship, relieving Red Sky of a A$5.0 million bond. Later raisings of $780,000 and $400,000 came at 0.25 and 0.1 cent.
In November 2020 it agreed to buy the Killanoola oilfield from Beach. The rights issue raised only $771,478, but $4.3 million of commitments at 0.2 cent followed in January 2021, and the purchase completed in February. Rob Annells became chairman. An $5.1 million raising at 0.8 cent in August and September 2021 funded seismic and drilling. DW-1 flowed about 40 barrels a day in December 2021. Shares reached 4.64 billion by year end.
2022-2026: Yarrow gas, Angola and a fresh raising
Killanoola's best-estimate oil in place rose to 93 million barrels in 2022 and 135.5 million in 2023, though no reserves were booked. Yarrow 3 flowed about 5.0 MMscf/d after fracturing in November 2022. A pipeline was finished in 2023, and first Innamincka revenue arrived for November 2023 gas sales to Origin Energy. Killanoola crude was contracted to Viva Energy, but DW1 flowed 62 barrels a day before a pump failure halted the test.
Red Sky took 35% of Angola's Block 6/24 at the end of 2024, ratified in September 2025. Yarrow 1 came online on 15 November 2025 at about 2.4 MMscf/d. The KN2 well at Killanoola reached 1,044 metres with hydrocarbons but low permeability, and was cased and suspended.
In March 2026 the company launched a $1.0 million placement and a rights issue at 0.1 cent, underwritten by CPS Capital, to fund its Santos-operated wells. It also cut directors' fees and salary by 25%. The raising totalled about $4.1 to $4.2 million. Cash was A$6.17 million at 30 June 2026, with no debt. A small shareholding sale facility cut holders from 5,453 to 1,819. Yarrow 4 spudded on 31 August 2026, with Yarrow 5 to follow. The Willowie 2 spud was estimated for late October 2026, and the company planned to divest Gold Nugget. About 10.57 billion shares were on issue.
Written from the 161 story beats below (2007 to 31 Aug 2026), which come from the company's own announcements and filings.