Stockle - the stock oracle

Prominence Energy NL

ASX:PRM
A$0.001Close 7 Oct 2026 · delayed

Past year: ▼ 67%(0.10c – 0.40c AUD)

Market cap
A$2.7m
Shares on issue
2.68bn
In-ground value
A$1.45bn
Risked multiple
under review
Story beats
190 since 2006
Last event
31 July 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

1 Apr 2011security holder rights change● Neutral

The convertible note conversion rate resets to 9.16 shares per note for the June 2011 quarter, up from 5.87. This is a scheduled quarterly reset under the trust deed.

Discuss in chat

17 Mar 2011drilling result▼ BadMajor

Sun confirms Krai Thong-1 found only water in the tested zones and will be plugged and abandoned, with Chalawan deferred. Both L20/50 wells are now dry; Sun keeps 42.5% and the joint venture will reinterpret the seismic data.

Value this in the calculator →Discuss in chat

17 Mar 2011drilling result▼ BadMajor

Carnarvon reports Krai Thong-1 wireline testing found water as the mobile fluid, so the well will be plugged and abandoned and the Chalawan well deferred. A second dry hole in the Thailand program; good reservoir and seals were noted.

Value this in the calculator →Discuss in chat

14 Mar 2011drilling progress report● Neutral

Carnarvon reports Krai Thong-1 stopped at about 1,300m, short of the 1,425m plan, due to hard rock, after the target intervals were penetrated. Sandstone zones with elevated resistivity and minor oil shows need wireline testing. Cautiously encouraging, but unproven.

Value this in the calculator →Discuss in chat

14 Mar 2011drilling progress report● Neutral

Sun repeats the operator's update: Krai Thong-1 stopped at about 1,300m after hard rock, with sandstone zones showing elevated resistivity and minor oil shows. Wireline logging and testing over 3-4 days will decide whether a hydrocarbon accumulation exists.

Value this in the calculator →Discuss in chat

10 Mar 2011half year report● Neutral

Sun lodges its half-year report to 31 December 2010, showing a net loss of $1,447,435 (prior period loss $6,216,259). It notes Tapao Kaew-1 was plugged and abandoned and Dr Farrell retired as chairman on 28 February 2011.

Discuss in chat

8 Mar 2011drilling progress report● Neutral

Raisama re-released Carnarvon's Krai Thong-1 update (casing set at 605m, drilling to about 1,425m). It says it has acceptances for over 90% of Peak, with its offer closing 17 March. Third-party repeat with no new Sun information.

Value this in the calculator →Discuss in chat

8 Mar 2011drilling progress report● Neutral

Carnarvon reports Krai Thong-1 has set casing at 605m and is preparing to drill the final section to about 1,425m. Total depth is expected within 3-4 days, followed by logging. No results yet.

Value this in the calculator →Discuss in chat

8 Mar 2011drilling progress report● Neutral

Sun repeats the operator's update that Krai Thong-1 (37M barrel target, 42.5% interest) has set casing at 605m and is preparing to drill to about 1,425m. Logging follows in 3-4 days. No result yet.

Value this in the calculator →Discuss in chat

2 Mar 2011other● Neutral

Sun will pay A$92,441 interest on its 12% convertible notes for 1 January to 31 March 2011, payable 31 March (1.6274 cents per note). Routine scheduled payment.

Discuss in chat

1 Mar 2011drilling progress report● Neutral

Carnarvon reports Krai Thong-1, the second Thailand well (37M barrel target, about 1,425m), spudded 28 February and has drilled to 132m. Target objectives are expected within 9-12 days and total depth in about two weeks.

Value this in the calculator →Discuss in chat

1 Mar 2011drilling spud● NeutralMajor

Sun reports Krai Thong-1, the second L20/50 well with a 37M barrel target, has spudded and drilled to 132m after the rig moved from the dry Tapao Kaew-1. Major objectives are expected within 9-12 days. Sun holds 42.5%.

Value this in the calculator →Discuss in chat

25 Feb 2011farm in farm out agreement● Neutral

A further extension has been agreed to sign the definitive NW Europe farm-in, now to 30 April 2011 (previously 28 February). It remains a non-binding term sheet for 15% of a 720 bcf gas prospect, costing about A$2.3M. Sun says it is hopeful of signing in coming weeks; the well could be drilled in Q3 2011.

Value this in the calculator →Discuss in chat

25 Feb 2011investor presentation● Neutral

Sun lodged its conference presentation for 1-2 March 2011. It repeats known facts: 42.5% of L20/50 with the remaining Thailand wells testing 70M barrels gross, the non-binding 15% NW Europe farm-in, and A$7.1M cash. No new information.

Discuss in chat

25 Feb 2011director officer appointment● NeutralMajor

Dr Wolf Martinick, a director since 1996, is appointed Non-Executive Chairman from 1 March 2011, replacing the retiring Dr Brad Farrell. This resolves the open chairman succession; Farrell remains available as a consultant.

Discuss in chat

21 Feb 2011drilling result▼ BadMajor

Carnarvon reports Tapao Kaew-1 reached 1,792m and failed to find hydrocarbons. The sands were not oil-bearing, though failed logging tools left the deepest section inconclusive. The well will be plugged and abandoned. This is a dry hole for the first Thailand well.

Value this in the calculator →Discuss in chat

21 Feb 2011drilling result▼ Bad

Raisama (Peak's takeover bidder) re-released Carnarvon's news that Tapao Kaew-1 found no hydrocarbons and will be abandoned. It restates that Peak is earning 7.5% of L20/50 from Sun. Third-party repeat with no new Sun information.

Value this in the calculator →Discuss in chat

21 Feb 2011drilling result▼ BadMajor

Sun confirms Tapao Kaew-1 (the 21M barrel target) was drilled to 1,792m and will be plugged and abandoned, as the joint venture consensus is that it found no hydrocarbons. The rig moves to Krai Thong-1. Peak has completed its free carry of Sun's share; Sun keeps 42.5%.

Value this in the calculator →Discuss in chat

15 Feb 2011drilling progress report▼ Bad

Sun repeats Carnarvon's update: Tapao Kaew-1 at 1,600m with no significant reservoir sections or hydrocarbon shows so far, though deeper sands are still anticipated. The well will be completed for testing or plugged after logging. Sun keeps 42.5%.

Value this in the calculator →Discuss in chat

15 Feb 2011drilling progress report▼ Bad

Carnarvon reports Tapao Kaew-1 at 1,600m, heading for 1,715m. The primary marker was found at about 800m, but no significant reservoir sands or hydrocarbon shows so far. Deeper reservoir sands are still expected. Early signs are discouraging.

Value this in the calculator →Discuss in chat

8 Feb 2011drilling progress report● Neutral

Tapao Kaew-1, the first Thailand well (21M barrel target, planned to about 1,715m), is drilling at 605m. The first objectives are expected within 3-4 days and total depth within 6-8 days. No result yet.

Value this in the calculator →Discuss in chat

1 Feb 2011drilling progress report● Neutral

Carnarvon reports Tapao Kaew-1 spudded in late January and is drilling at 112 metres. It expects the first objectives within 8-10 days and total depth in about 12 days. Interests: Carnarvon 50%, Sun 42.5%, Peak 7.5%.

Value this in the calculator →Discuss in chat

1 Feb 2011drilling spud▲ GoodMajor

Tapao Kaew-1, the first well of Sun's Thailand programme, has spudded, targeting about 21M barrels to 1,715m. Drilling is at 112m, and total depth is planned about 12 days after spud. This begins the exploration campaign Sun has been building towards.

Value this in the calculator →Discuss in chat

28 Jan 2011quarterly activities report● Neutral

December 2010 quarter Appendix 5B: cash rose to A$7.108M from A$1.979M after the capital raisings, despite a A$1.633M operating outflow. Next quarter's outflows are estimated at A$2.397M. Directors were paid A$155k.

Discuss in chat

28 Jan 2011quarterly activities report● Neutral

December quarter report: Thai programme expanded to two firm wells plus one contingent, testing over 90M barrels of speculative potential. Tapao Kaew-1 is scheduled to spud 29 January. Sun raised A$7M and held A$7.1M cash. NW Europe farm-in remains non-binding.

Discuss in chat

19 Jan 2011security holder rights change● Neutral

The convertible note conversion rate for the March 2011 quarter was reset to 5.87 shares per note, down from 6.77. Routine quarterly reset under the note terms.

Discuss in chat

19 Jan 2011drilling progress report● Neutral

Rig mobilisation has begun for the Thailand programme, with some equipment due at the Tapao Kaew-1 site by 21 January. Sun will update on rig-up and spud timing. Otherwise repeats known prospect details.

Value this in the calculator →Discuss in chat

19 Jan 2011other● Neutral

Raisama (ASX: RAI), which has an agreed takeover offer for Peak Oil & Gas valuing it at A$39M, re-released Sun's rig mobilisation news. It confirms Peak is earning 7.5% of L20/50 from Sun. Third-party announcement, no new Sun information.

Discuss in chat

17 Jan 2011farm in farm out agreement▼ Bad

The deadline for signing the definitive NW Europe farm-in was extended from 31 December 2010 to 28 February 2011. The deal is still a non-binding term sheet for 15% of a 720 bcf gas prospect; the well has slipped from Q2 to possibly Q3 2011.

Value this in the calculator →Discuss in chat

7 Jan 2011drilling scheduled● Neutral

Sun says the multi-well Thailand programme will start the week of 17 January 2011, with Peak carrying Sun through the first well (21M barrel target). Sun keeps 42.5%. Repeats known facts and timing.

Value this in the calculator →Discuss in chat