Po Valley spent nearly two decades getting northern Italian gas fields approved and producing, surviving near-collapse in 2016 to become a profitable producer paying its first dividend.

2006-2009: Gas found, approvals awaited

Po Valley Energy set out to bring northern Italian gas to market. In early 2006 its Vitalba 1d well flowed 2.8 million cubic feet a day, the third positive test in six weeks, and proven reserves rose 45% to 36.6 bcf (billion cubic feet). The company applied for eight new licences and lodged its Sillaro production concession application. It raised A$5.85m in October 2006 and A$7.136m in June 2007, at a lower price of A$1.65, and signed with UK storage operator Star Energy to bid for gas storage licences.

The obstacle was regulation. Bank of Scotland agreed a first debt facility, later set at €25m, but the Ministry's approvals slipped repeatedly, and management said the slowness delayed production by up to a year. The Castello and Sillaro 20-year concessions were finally granted in November 2008. Further money came in February 2009 (A$10m at A$1.20) and September 2009 (A$8.52m at A$1.55). Bezzecca-1 tested 3.75 mmcf/d (million cubic feet a day) in April 2009 and Sillaro-2 confirmed a combined 13 mmcf/d in August. On 21 December 2009 Castello's first gas flowed into the Italian grid, the first revenue since 2005.

2010-2014: Production, downgrades and leadership change

Sillaro began commercial production in May 2010, but trouble followed. Castello's pressure fell faster than expected, water entered one level, and its 2P reserves were cut 42% to 3.66 bcf. Sillaro and Fantuzza were cut in September, and Bezzecca's 2P reserves fell to 3 bcf. In October 2010 founder Michael Masterman handed the CEO role to Giovanni Catalano.

The company reported its first half-year profit in 2011, but a €5.83m Castello write-down produced a 2011 net loss of €5.07m. Vitalba-1dirA restarted Castello in February 2012. Farm-outs began: Petrorep took part of Cadelbosco, and a December 2012 placing raised A$1.35m at A$0.12. A €20m Nedbank facility replaced the earlier lender in May 2013. A 2013 first-half loss of €5.63m followed another write-down, and Catalano left in August, with Sara Edmonson acting as CEO. The Gradizza-1 well found gas, but only 3.6 bcf of contingent resources against 9 bcf hoped. Bezzecca received its production concession in July 2014.

2015-2016: Near collapse and recapitalisation

Sillaro output fell to about 25,000 m3/day by late 2014. In 2015 the company raised A$1.0m at 7 cents and sold its La Prospera stake to AleAnna for €1.85m to cut Nedbank debt. The 2015 loss was €6.66m. A 2016 ban on offshore activity within 12 nautical miles threatened the Adriatic permit.

In March 2016 the company launched a 2.5-for-1 rights issue at A$0.005, raising about A$1.75m. It issued 350.4m new shares in April. Masterman returned as chairman and Kevin Bailey joined the board. A delisting proposal was withdrawn. Sillaro workovers failed, and directors and others refinanced the remaining debt. A September placing raised A$900,000 at A$0.02. Shares on issue were about 550m at the end of 2016, up from about 140m a year earlier.

2017-2019: Bezzecca, the Saffron detour and Selva

Subsidiary Saffron Energy listed on London's AIM in February 2017, raising £2.5m, with PVE keeping 65%, later diluted to 54%. Bezzecca produced first gas on 13 April 2017, and Sant'Alberto received its concession in October. A planned Saffron deal was cancelled in February 2018 after an independent expert found it 'neither fair nor reasonable'. PVE distributed 100m Saffron (now Coro) shares to shareholders. A sale of Cadelbosco and Grattasasso collapsed in October 2018.

The key success was Podere Maiar-1dir at Selva, with partners United and Prospex funding part of the cost, which flowed over 148,000 scm/day in January 2018. Selva got a preliminary concession in January 2019 and maiden 2P reserves of 13.3 bcf. Funding came from A$2.5m of convertible notes (2018) and placings at 4.2c and 5.5c. PVE began exploring an AIM dual listing in June 2019; no decision has been made.

2020-2022: Waiting for Selva

Cash fell to €31,000 at 30 June 2020, and ASX questioned continued listing; directors and shareholders lent A$500,000. Environmental decrees for Selva and Teodorico were signed in April 2021. A A$10.1m raise at A$0.028 closed in July 2021, and the company said Selva was fully funded. First gas slipped to 2023. Masterman retired in May 2022, Bailey became chairman, and the remaining A$1.75m of notes converted to 62.5m shares. The final Selva concession came on 29 July 2022, followed by a A$4.5m placing at A$0.055 and a €3.45m plant contract.

2023-2026: Producer

Podere Maiar-1 delivered first gas on 4 July 2023, selling to BP. The 2023 report showed the first profit after tax in many years, with no debt. In 2024 the BP contract was extended, and a court ruled Teodorico's assessment must cover two newer marine protected areas. Bailey became Executive Chair and CEO in July 2025. A 140 sq km 3D seismic survey was completed in 13 days in late 2025. FY2025 profit was €2.72m on €7.05m revenue, and a maiden dividend of 0.0431 A-cents a share was paid on 31 March 2026.

As of 4 September 2026, the four-well drilling environmental assessment was admissible and in a 60-day comment period, with drilling hoped for 2027. June liquidity was €8.76m with no debt. A new Hera Trading gas contract starts 1 October 2026, and August gas sold at a record €0.67/scm. Disputes over Prospex's purchase of United's 20% remain unresolved.

Written from the 168 story beats below (2006 to 4 Sept 2026), which come from the company's own announcements and filings.

Beat by beat

The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.

shares on issue market cap (log scale)

2026647m shares · A$42.1m market cap

  1. 4 Sept

    The ministry confirmed the four-well EIA is admissible, opening a 60-day public observation period from 1 September. Po Valley signed a new 12-month Hera Trading gas sales agreement from 1 October 2026 (about 28.19m scm), and August gas sold at €0.67/scm, giving record monthly revenue.

    material agreement

    647m shA$42.1m
  2. 29 June

    On 26 June 2026 Po Valley filed its Environmental Impact Assessment with the Italian ministry for the four-well Selva Malvezzi drilling program. Seismic processing is nearly complete. The CEO says approval would allow drilling to start in 2027.

    regulatory community update

    647m shA$37.9m
  3. 30 Jan

    The board adopted a dividend policy and intends to pay a maiden unfranked dividend of 0.0431 A-cents per share for FY2025, payable 31 March 2026. It is indicative, discretionary and not guaranteed; FY2025 operating cash flow was €4.5m.

    dividend declaration

    647m shA$40.1m

2025647m shares · A$38.8m market cap

  1. 4 Dec

    The 140 sq km 3D seismic survey was completed in 13 days, on budget and ahead of schedule, after the November start. Processing results are targeted for Q2 2026 to refine the four-well plan; Manuel Porcelli was also appointed General Manager of the Italian operations.

    drilling result

    647m shA$38.8m
  2. 21 Aug

    Po Valley and its Selva Malvezzi partners signed a 12-month gas sales agreement with Hera Trading from 1 October 2025, replacing the BP Gas Marketing deal that ends then. Price is linked to the Italian Gas Index; estimated volume is 27.96m scm.

    material agreement

    647m shA$38.8m
  3. 4 July

    Chairman Kevin Bailey, who says he owns 25%, becomes Executive Chair and CEO immediately, on $265,000 a year (0.6 FTE) for 12 months. This replaces the earlier plan for a full-time Rome-based CEO; no other board changes.

    director officer appointment

    647m shA$29.8m
  4. 28 Jan

    Emilia Romagna region granted its INTESA approval for the 3D seismic campaign over Selva Malvezzi, ahead of the four-well drilling plan. A formal Ministry decree is expected imminently; the survey should take no more than three weeks.

    regulatory community update

    647m shA$25.9m

2024647m shares · A$24.6m market cap

  1. 3 Dec

    A court ruled Teodorico's environmental assessment must evaluate two newer marine protected areas, partly upholding an environmental group's challenge. PVE says its tenure is unaffected and will seek a Ministry meeting to update the study; this is a setback to the 2021 approval.

    regulatory community update

    647m shA$24.6m
  2. 31 Oct

    September quarter: PM-1 produced 7.02m scm (100%), revenue €2.76m at €0.39/scm. Four drilling applications were filed with the Ministry. Cash rose to €4,159k. 3D seismic awaits final regional sign-off after November elections.

    quarterly activities report

    647m shA$24.6m
  3. 21 Oct

    New Italian environmental decree allows Adriatic gas concessions within a defined area, which includes Teodorico (1P 27 Bcf). PVE says the project meets the requirements, improving clarity for a joint venture or sale; the decree must still be converted into law.

    regulatory community update

    647m shA$22.7m
  4. 12 Sept

    Half-year to 30 June 2024: profit €930,241 versus a €399,260 loss a year earlier, on gas sales of €2.66m net. Cash €3.11m. The BP gas contract was extended 12 months to 30 September 2025, resolving that open thread.

    half year report

    647m shA$22.7m
  5. 29 May

    AGM chairman's address: production reached 20.61m scm cumulative by 26 May, cash A$4.2m. The proposed Selva North/South drilling this year is replaced by a broader, slower plan after PiTESAI's annulment, and a Rome-based full-time CEO will be hired.

    other

    647m shA$23.3m
  6. 30 Apr

    2023 annual report: chairman calls 2023 pivotal, with 9.8m scm produced (6.2m net) and €2.3m revenue, the first profit after tax in many years. Cash €2.1m, no debt; plans 3D seismic and multi-well drilling, with funding options meant to be least dilutive.

    annual report

    647m shA$23.3m

2023647m shares · A$31.7m market cap

  1. 7 Aug

    Four-week ramp-up of Podere Maiar-1 (63%) is complete, with about 1.8m scm sold to BP. Production resumed at a forecast 72,000 scm/d pending well-data analysis due in about 3 weeks. First gas cash flows are expected before end of August 2023.

    production update

    647m shA$31.7m
  2. 5 July

    Podere Maiar-1 delivered first gas on 4 July 2023, PVE's maiden revenue from Selva Malvezzi (63% owned), supplying BP under the 18-month contract. Ends the long development phase; flow rate will be tuned and Teodorico JV or sale still being assessed.

    production update

    647m shA$47.3m
  3. 14 Feb

    Signs an 18-month gas sales agreement with BP Gas Marketing from 1 April 2023 for Podere Maiar-1 gas, about 37m scm, priced off Italy's Heren PSV day-ahead price. Resolves the offtake thread; first gas still on track for early Q2 CY23.

    contract award

    647m shA$60.8m

2022647m shares · A$32.4m market cap

  1. 23 Nov

    Final UNMIG and fire department approvals received; Podere Maiar gas plant and pipeline construction starts 28 November 2022, with SNAM tie-in works also begun. Gas sale discussions with several buyers are underway. First gas still targeted for early Q2 CY23. Clears the last approval hurdle.

    regulatory community update

    647m shA$32.4m
  2. 11 Aug

    Construction contract signed with TESI Srl for the Podere Maiar gas plant and 1km pipeline: €3.45m total (€2.2m net to PVE), €130k below forecast. Construction is due to finish in Q1 CY23; first gas still targeted for early Q2 CY23. Resolves the open contract thread.

    contract award

    647m shA$41.4m
  3. 10 Aug

    Placement raises A$4.5m at A$0.055 per share (81.8m shares), overbid, to fund Podere Maiar construction. A$600k from director-related parties needs shareholder approval. Lead manager gets 7.5m options at A$0.10 expiring June 2024. Funds also cover Teodorico sale/JV options and 3D seismic planning.

    capital raising announcement

    647m shA$41.4m
  4. 29 July

    Italy's Ministry granted the final production concession for Podere Maiar, the last regulatory step, resolving the open Selva concession thread. First gas is still targeted for 1H 2023. Next steps include transferring 37% to Prospex/UOG and asking partners for their share of the Snam bond.

    regulatory community update

    647m shA$41.4m
  5. 26 July

    Updated independent report keeps 2P gas reserves unchanged, but the combined 2P value of Selva and Teodorico rises to €90.1m from €36.0m in 2019 on higher gas prices. Selva net capex rises to €2.7m. Oil resources are dropped after Pitesai, which the company says is immaterial.

    resource reserve update

    647m shA$33.0m
  6. 2 June

    The Emilia Romagna Regional Council approved the Selva (Podere Maiar) INTESA, the penultimate step before the final production concession. This resolves the INTESA thread. First gas is still targeted for 1H 2023, subject to final approval, and contract talks are underway.

    regulatory community update

    647m shA$19.4m
  7. 3 May

    All 1,750,000 remaining convertible notes (A$1.75m) converted into 62.5m shares at A$0.028, ending that debt. Net assets rise from €9.7m at the annual report to over €10m. This closes the outstanding notes thread.

    security holder rights change

    647m shA$18.8m
  8. 2 May

    Founder Michael Masterman retires after more than 20 years. Kevin Bailey is elected chairman, and Katrina O'Leary joins as an independent non-executive director. This resolves the chairman succession flagged in December 2021.

    director officer appointment

    647m shA$18.8m
  9. 1 Mar

    Italy's new Plan of Areas (Pitesai) leaves Selva unaffected but may hit Teodorico, whose no-development zone was extended. Bagnolo and Ravizza oil projects will not proceed; the company says this is not material (about €30,000 spent), and it plans to relinquish ineligible acreage.

    regulatory community update

    647m shA$20.7m

2021647m shares · A$18.8m market cap

  1. 1 Dec

    Joseph Constable of HGL joins the board as a non-executive director. Chairman Michael Masterman plans to retire before the early-2022 AGM, with a new chairman to follow. A project manager has been hired for Selva.

    director officer appointment

    647m shA$18.8m
  2. 26 Oct

    Selva first gas slips to the first half of 2023 because Snam's grid tie-in will take longer. Capex rises to €2.65m from €2.3m. INTESA is now expected in Q4 2021 and the concession in Q1 2022, against Italian gas prices that have risen from about €0.20 to above €0.90 per scm.

    production update

    647m shA$20.7m
  3. 30 Aug

    Prospex has agreed to buy United Oil & Gas's 20% Podere Gallina interest (via its subsidiary) for €2,164,701, subject to Italian approvals. Po Valley says it has pre-emptive rights, is taking legal advice on the deal's validity, and has reserved its rights.

    joint venture update

    647m shA$16.2m
  4. 13 July

    Retail offer closed with A$2.6m raised (about 57.4% take-up), completing the A$10.1m raise. Cash is A$4.5m, A$1.75m of convertible notes remain, and the company says Selva is fully funded for first gas in Q2 2022. The shortfall of about A$0.8m goes to sub-underwriters.

    capital raising announcement

    647m shA$18.8m
  5. 21 June

    The placement and institutional offer closed, raising about A$7.5m at A$0.028. Institutional take-up was about 62%, including about A$3.35m of loan and interest conversion to shares, with Henslow covering the A$1.6m balance. The retail offer follows.

    capital raising announcement

    647m shA$22.7m
  6. 18 June

    Po Valley launches a A$10.1m raise at A$0.028 a share: a A$1m placement plus a fully underwritten 1-for-2 entitlement offer (A$9.1m, underwriter Henslow). Funds go to Selva development, shareholder loan and convertible note repayment. This is the larger raise the company had planned. Offer price is a 17.6% discount to the last close.

    capital raising announcement

    647m shA$22.7m
  7. 6 Apr

    Italy signed the environmental impact decrees for both Selva and Teodorico, ending a long wait for the Minister's signature. Next come the INTESA process for Selva and concession paperwork for Teodorico, both to be lodged in the June quarter. First Selva gas is now targeted for mid-2022, later than the earlier 2021 aim.

    regulatory community update

    647m shA$19.4m

2020647m shares · A$24.6m market cap

  1. 19 Aug

    PVE replied to an ASX query on its low cash, €31,000 at 30 June 2020. It cites cost cuts, A$500,000 of director and shareholder loans, and Selva approval it expects by October 2020, so it can fund development by December 2020. Continued listing remains in question.

    listing compliance notice

    647m shA$24.6m
  2. 19 Aug

    Directors and major shareholders extended A$500,000 of loans since 30 June 2020, maturing 31 December 2021 at 10% interest, for working capital. Management plans a larger fund raising in late 2020 once Selva is approved, which it now expects in the December quarter.

    debt financing

    647m shA$24.6m
  3. 7 Jan

    Italy's Environment Ministry gave formal technical environmental approval for the 63%-owned Selva gas field, resolving the environmental thread open since April. Still needed: ministerial decree, INTESA agreement and final concession grant, with development slated for 2020.

    regulatory community update

    647m shA$33.7m

2019647m shares · A$32.4m market cap

  1. 23 Dec

    Sara Edmonson joins as non-executive director from 23 December 2019. She previously led Po Valley Energy from July 2010 to 2017, so this is a return to the company, and now heads an Italian energy association. The board grows to four.

    director officer appointment

    647m shA$32.4m
  2. 31 July

    PVE raised A$1.4m by placing 25.45m shares at 5.5c, up from the 4.2c placement in December 2018. 14.5m shares issue in August; 10.9m to directors need a September general meeting. Funds go to Selva, Teodorico and working capital.

    capital raising announcement

    622m shA$36.7m
  3. 4 June

    PVE is in preliminary stages of exploring a dual listing on London's AIM, aiming to improve share liquidity, and has appointed Cairn Financial Advisors and Turner Pope Investments. No decision is made, including on whether to raise new capital at listing.

    other

    622m shA$22.4m
  4. 26 Apr

    Selva gains 14.1 bcf of 2C contingent resources (North Flank 8.9, South Flank 5.2) from none previously. Prospective resources rise 74% to 91.5 bcf best estimate from 52.7 bcf, helped by the new Riccardina prospect. Reserves stay at 13.3 bcf 2P.

    resource reserve update

    612m shA$23.2m
  5. 26 Apr

    Maiden prospective resources of 106 MMbbl (best estimate) for Torre del Moro and 54.5 MMbbl for Bagnolo SW. 2C contingent resources rise to 27.3 MMbbl at Bagnolo in Piano and 16.1 MMbbl at Ravizza, all 100% PVE. This lifts the oil inventory on the retained Cadelbosco/Grattasasso licences, which were kept after the Delta sale collapsed.

    resource reserve update

    612m shA$23.2m
  6. 8 Feb

    Maiden Selva reserves: 13.3 bcf gross 2P (8.38 bcf net to PVE at 63%), reclassified from the earlier 17 bcf 2C contingent resource figure after the preliminary concession award. East Selva prospective resources of 34.8 bcf (30% chance of success) are also reported; start-up capex is stated as €3m gross.

    resource reserve update

    612m shA$24.5m
  7. 15 Jan

    Italy granted preliminary approval of the Selva production concession (PVE 63%). PVE targeted final production approvals by the first half of 2020 and first gas late in calendar 2020.

    regulatory community update

    612m shA$23.2m

2018593m shares · A$26.7m market cap

  1. 19 Dec

    PVE raised A$1.2m through a placement of 28.6m shares at 4.2c. Of these, 18.5m shares are issued now and 10.1m go to directors and associates, subject to a general meeting in early February 2019. Funds go to Selva, Teodorico and working capital.

    capital raising announcement

    593m shA$26.7m
  2. 11 Oct

    The €1.13m sale of the Cadelbosco di Sopra (85%) and Grattasasso (100%) oil licences to Delta Energy collapsed after a large Delta shareholder blocked it. PVE keeps both licences. This resolves the pending sale thread.

    asset acquisition disposition

    593m shA$27.3m
  3. 29 May

    PVE lodged the Selva production concession application (80.8 km2) with the Italian ministry, following the Podere Maiar-1dir discovery. Phase one is a €2.4m plant producing up to 150,000 scm/day; preliminary award is expected at the July commission meeting.

    regulatory community update

    593m shA$17.6m
  4. 26 Apr

    PVE raises A$2.5m via 3-year convertible notes, 8% coupon, converting at 4.2c, to fund Selva concession, Teodorico final decision and Torre del Moro seismic. Directors Bailey (A$700k) and Masterman (A$300k) plan to join, subject to approval at the 30 May AGM.

    capital raising announcement

    593m shA$16.3m
  5. 13 Apr

    PVE will distribute 100m Saffron (now Coro) shares to shareholders instead of 80m, avoiding a lock-in on the other 20m under AIM rules. The EGM is to be adjourned from 23 April to early May.

    security holder rights change

    593m shA$16.3m
  6. 28 Feb

    PVE and Saffron mutually cancelled the sale of Po Valley Operations for 200m Saffron shares. The independent expert found it 'neither fair nor reasonable', and the tax office was unlikely to give demerger relief. PVE keeps Selva (63%), Teodorico and Torre del Moro, and still backs the Sound deal.

    material agreement termination

    593m shA$18.5m
  7. 19 Feb

    A new independent report gives Teodorico, the offshore Adriatic gas field, maiden 2P reserves of 36.5 bcf. Bezzecca and Sillaro reserves are cut, as flagged in the quarterly. Selva resource update is due in the June quarter.

    resource reserve update

    593m shA$18.5m
  8. 23 Jan

    PVE signed a binding agreement for Saffron to buy PVE's Italian subsidiary for 200m Saffron shares, alongside a reverse takeover of Sound's Italian unit, with a £14m raise at 4.38p. PVE would hold 33.65% of Saffron, keep a 5% Selva royalty, and plans to distribute its Saffron shares to shareholders. This firms up the October non-binding proposal; PVE's stake is lower than the 51% first proposed.

    business combination

    593m shA$17.6m
  9. 19 Jan

    Podere Maiar-1dir flowed 148,136 scm/day from level C2 and 129,658 scm/day from C1, and PVE calls it a commercial discovery at Selva. A production concession application is due in H1 2018, with revised resources in the June quarter. PVE holds 63%.

    flow test result

    593m shA$17.6m

2017593m shares · A$17.1m market cap

  1. 6 Dec

    Podere Maiar-1dir reached 1,330 m ahead of schedule and on budget. Logs show 53 m gross gas pay, with the reservoir top 12 m above previous producers. It will be cased and completed, with rigless flow testing planned for early January.

    drilling result

    593m shA$17.1m
  2. 21 Nov

    Podere Maiar-1 dir was spudded on 21 November 2017 at Selva, targeting 1,350 m in 20-25 days. After the United (20%) and Prospex (17%) farm-ins, PVE holds 63% of the licence. This starts the Selva well flagged earlier.

    drilling spud

    593m shA$17.1m
  3. 1 Nov

    Prospex Oil and Gas (AIM) will earn 17% of the Podere Gallina licence by funding 34% of the Podere Maiar-1 well. With United, partners now cover 74% of the well cost. Drilling starts this month.

    farm in farm out agreement

    593m shA$16.3m
  4. 31 Oct

    Chairman Michael Masterman becomes PVE CEO from 1 November 2017 on A$120,000 a year plus super, replacing Sara Edmonson, who moves to be Saffron CEO. Masterman becomes a Saffron non-executive director. The company says it aligns roles for the proposed Saffron deal.

    director officer appointment

    593m shA$16.3m
  5. 18 Oct

    Italy's Ministry granted the Sant'Alberto production concession (19.51 km2, 2P 2.0 bcf), as expected in October. First gas now expected summer 2018, with plant installation done by end Q2 2018. Shell is contracted to take all output.

    regulatory community update

    593m shA$12.9m
  6. 6 Oct

    Non-binding heads of terms for PVE's 54%-owned Saffron to acquire Sound Energy's Italian assets and PVE's remaining Italian assets (Selva 80%, Teodorico, Torre del Moro). PVE would hold 51% of the enlarged Saffron, completing early 2018; James Parsons to chair.

    business combination

    593m shA$12.9m
  7. 26 Sept

    Saffron Energy raised £1.25m (A$2.16m) in a placing, cutting PVE's stake from 65% to 54%. Funds are for acquisition opportunities and raising Sillaro and Bezzecca output. PVE is diluted but retains control.

    capital raising announcement

    593m shA$12.9m
  8. 25 Sept

    PVE is selling its 85% of Cadelbosco di Sopra and 100% of Grattasasso for €1.13m (A$1.69m) to a London private-equity-backed company. Completion needs ministry approval, expected in the March 2018 quarter. Proceeds will part-fund the Selva well.

    asset acquisition disposition

    593m shA$12.9m
  9. 8 May

    Conditional deal for United Oil & Gas to earn 20% of the Podere Gallina licence (Selva gas field) by funding 40% of the Podere Maiar-1 well. Conditions are expected by July 2017, with drilling in the December quarter. This answers the farm-in search for Selva.

    farm in farm out agreement

    565m shA$12.3m
  10. 19 Apr

    First gas flowed from Bezzecca on 13 April 2017, ramping toward 30,000-40,000 scm/day, worth about €190-250k a month. With Sillaro (~10,000 scm/day), group output is expected to rise to 40-50,000 scm/day. Resolves the long-awaited first gas.

    production update

    565m shA$11.9m
  11. 4 Apr

    Placing to raise A$1.18m via 42.88m shares at A$0.0275, above the A$0.02 of the last raise. Funds go to Selva and Teodorico, about A$480k repayment of shareholder loans, and working capital. Directors' 28.4m shares await approval at the 31 May AGM.

    capital raising announcement

    550m shA$11.6m
  12. 3 Mar

    PVE was granted the 111 km2 Torre del Moro onshore oil exploration licence southeast of Bologna, with a six-year initial period. The first step is collecting existing data and buying 2D seismic. A new exploration asset, with no drilling planned yet.

    regulatory community update

    550m shA$13.2m
  13. 27 Feb

    Saffron Energy listed on London's AIM after an oversubscribed £2.5m (A$4.07m) raise at 5p, closing its first day at 7.37p, a 47% premium. PVE's retained 65% stake was valued at A$19.3m.

    asset acquisition disposition

    550m shA$10.0m
  14. 16 Feb

    Saffron Energy will list on AIM around 24 February, raising up to GBP2.5m (A$4.1m) at a GBP5m pre-money value. PVE keeps about 65%, locked in for 12 months, and may later consider distributing shares to its shareholders. Proceeds fund Bezzecca, Sant'Alberto and bridging debt.

    capital raising announcement

    550m shA$10.0m
  15. 6 Jan

    PVE is advancing a London AIM listing of subsidiary Saffron Energy, holding Sillaro, Bezzecca and Sant'Alberto, to raise GBP2-2.2m at a pre-money value above GBP5m. PVE would stay majority holder. Still subject to board review and market conditions. (Release is dated '6 December 2017' in text.)

    business combination

    550m shA$10.0m

2016550m shares · A$8.0m market cap

  1. 25 Nov

    Reserves revised: Sillaro 2P fell from 4.4 bcf to 2.2 bcf as Pliocene levels moved to contingent resources pending the Sillaro-1 sidetrack (late 2017/early 2018). Bezzecca net 2P rose from 3.8 to 4.0 bcf. Sant'Alberto figures were truncated.

    resource reserve update

    550m shA$8.0m
  2. 24 Nov

    Italy's Ministry awarded a preliminary production concession for the offshore Teodorico gas field (47 bcf 2C), resolving the open award thread. EIA submission is planned for first half 2017, and PVE expects to fund development with a farm-in partner.

    regulatory community update

    550m shA$8.0m
  3. 27 Sept

    Environmental Impact Assessment decree awarded for Sant'Alberto, resolving the open decree thread. A regional acknowledgement and the final production concession are still needed. Management targets a second new field in production in 2017.

    regulatory community update

    515m shA$7.1m
  4. 13 Sept

    Private placement raising A$900,000 via 45m shares at A$0.02, four times the A$0.005 rights issue price. Directors' portion (35.7m shares) needs shareholder approval. Funds go to Bezzecca development and working capital.

    capital raising announcement

    505m sh
  5. 13 Sept

    Signed a turnkey contract with TESI Srl for the 7 km Bezzecca pipeline and tie-in, now under construction. Capital cost is €2.2m, partly paid after production starts. Completion is expected by end-2016, before first gas from the 90%-owned field.

    contract award

    505m sh
  6. 27 June

    Sillaro C1 was perforated but testing gave no gas or water flow, a failure of the main target after several workover attempts. Level C0 kept producing about 14,000 scm/day. The team now turns to smaller levels and Bezzecca.

    drilling result

    491m shA$2.5m
  7. 31 May

    Board withdrew the delisting resolution (Resolution 5) from the 31 May AGM, reversing the April proposal. It says staying listed may help possible asset sales and restructuring transactions it is evaluating.

    agm notice

    491m shA$2.5m
  8. 9 May

    Debt cut to €450,000 (from €2.78m at end-2015) and refinanced with an unsecured 12-month, 10% facility from entities tied to directors Pirola and Bailey and former director Bradley. It replaces Nedbank. Sillaro C1 will be re-perforated in Sillaro-2 and also perforated in Sillaro-1.

    debt financing

    491m shA$5.3m
  9. 3 May

    Sillaro C1 test after the April perforation was inconclusive: the perforation tunnel appears blocked and B1 is watered out. Level C0 kept producing about 10,000 scm/day. This disappoints the hope of lifting output toward 30,000 scm/day.

    drilling result

    491m shA$5.3m
  10. 29 Apr

    Annual report says the board will seek shareholder approval to delist the company from ASX at the 31 May 2016 AGM, citing cost reduction. This is a strategy change that, if approved, would end ASX trading of shareholders' shares.

    annual report

    491m shA$5.3m
  11. 22 Apr

    Rights issue completed with 350.4m new shares issued on 20 April. Chairman Graham Bradley (about 12 years) and Kevin Eley retire; founder Michael Masterman becomes Chairman and substantial shareholder Kevin Bailey joins. Board falls to three, with cost cuts to follow.

    director officer appointment

    491m shA$15.9m
  12. 18 Apr

    Rights issue closed, raising A$1.61m from shareholders, with underwriters taking 27.6m shortfall shares. Total A$1.752m before costs at A$0.005, so the full target was reached, partly with underwriter support.

    capital raising announcement

    491m shA$15.9m
  13. 1 Apr

    2015 loss was €6.66m, including a non-cash loss on the asset sale and impairments from lower forecast gas prices, as flagged on 18 March. Revenue was €2.50m, EBITDA a €0.80m loss, and year-end cash €2.45m (before the Nedbank repayment).

    annual report

    491m shA$15.9m
  14. 18 Mar

    Launches a 2.5-for-1 renounceable rights issue at A$0.005 to raise about A$1.75m, partly underwritten by two directors and two shareholders. Funds go to the Sillaro rework, Selva approval, debt repayment and working capital. The price is far below the A$0.07 raise of June 2015.

    capital raising announcement

    491m shA$3.9m
  15. 18 Mar

    Sets a six-step recapitalisation: a ~A$1.75m rights issue, possible sale of Sant'Alberto and Bezzecca, and Nedbank refinancing. Expects a 2015 net loss from impairments and the La Prospera sale loss. Draws €150,000 of a €300,000 bridging loan from director Pirola's entity. Sillaro is ~10,000 scm/day.

    capital raising announcement

    491m shA$3.9m
  16. 21 Jan

    Nedbank loan restructured: €2.2m repaid on 19 January, leaving €576,000, and the loan becomes a standard facility repaid monthly to be cleared by 30 September 2016. Cash about €440,000. Directors are reviewing equity, convertible debt or asset sales to fund operations.

    debt financing

    140m shA$2.5m
  17. 6 Jan

    Italy's 2016 Budget Law reinstates a ban on offshore activity within 12 nautical miles, which may halve the AR94PY licence and will almost certainly delay the Teodorico concession decision. Sillaro output fell to 15,000 m3/day during a rigless rework; Nedbank loan restructuring is under negotiation.

    regulatory community update

    140m shA$2.5m

2015140m shares · A$2.6m market cap

  1. 29 Dec

    Completes the sale of the 75% La Prospera interest and Zanza share to AleAnna, announced in October. Proceeds go to Nedbank, reducing debt to under €1m. The company now holds 10 licence areas.

    asset acquisition disposition

    140m shA$2.6m
  2. 19 Oct

    Sells its 75% of La Prospera (with the Gradizza gas discovery) and its Zanza interest to partner AleAnna for €1.85m, plus €200,000 if the final Gradizza concession arrives by August 2016. Proceeds will cut Nedbank debt below €1m; a book loss is expected.

    asset acquisition disposition

    140m shA$6.9m
  3. 15 May

    Placement raises A$1.0m at 7 cents a share from an existing non-director shareholder, 14,285,714 new shares, settling around 31 May 2015. Funds are for working capital and asset development. First equity issue after a period with no new shares, against cash of only €0.54m.

    capital raising announcement

    122m shA$3.4m
  4. 15 May

    Sillaro work programme set in two phases: recomplete Sillaro-2 in Q3 2015 for €1.8m (about 50,000 m3/day), then sidetrack Sillaro-1 for €4.1m (80-90,000 m3/day). Funding is planned from a farm-out, equity and Nedbank drawings; none is yet secured.

    drilling scheduled

    122m shA$3.4m
  5. 14 Apr

    2014 Annual Report repeats the results: revenue €5.03m, loss €1.2m. Adds that Bezzecca, Sant'Alberto and Gradizza are now classed as reserves, lifting undeveloped 2P reserves 140% to 10.00 bcf. Sillaro fell to about 21,000 m3/day after October.

    annual report

    122m shA$5.8m
  6. 9 Jan

    Sillaro reserves cut to 2P 4.67 bcf from 5.5 bcf at end-2013, after water arrival and depletion cut output to about 25,000 m3/day. 1.45 bcf of Miocene gas moved from Fantuzza contingent resources to probable reserves. A Sillaro-1 sidetrack in late 2015 needs approval and funding.

    resource reserve update

    122m shA$8.9m

2014122m shares · A$10.6m market cap

  1. 31 Oct

    September quarter output 5.29m m3 (up about 6%), revenue €1.42m, cash €1.32m. A 10% Bezzecca farm-in is agreed subject to Ministry approval. After Sillaro's Level A depleted, output fell to about 25,000 m3/day from 55,000. Pipeline work due in Q4.

    quarterly activities report

    122m shA$10.6m
  2. 14 July

    Bezzecca was awarded production concession status by enlarging the Cascina Castello concession, the final approval needed to bring it into production via a 7 km pipeline to the Vitalba plant. Reserves were quoted at 1P 3.0 bcf and 2P 4.2 bcf, with an initial rate of 20,000 cubic feet per day.

    regulatory community update

    122m shA$7.1m
  3. 16 June

    Ministry awarded the preliminary production concession for Sant'Alberto, 2C contingent resources 2.1 bcf. The environmental study now goes to Emilia Romagna Region, the last step. Planned as a small modular plant with a grid link about 200 m away. Resolves a long-pending approval.

    regulatory community update

    122m shA$8.4m
  4. 30 Jan

    Gradizza-1 booked as Contingent Resources: 2C 3.6 bcf (PVE 75%: 2.7 bcf), well below the 9.0 bcf pre-drill prospective estimate because less net pay was found. Production concession application to be filed in February.

    resource reserve update

    122m shA$10.6m

2013122m shares · A$13.3m market cap

  1. 20 Dec

    Company and farm-in partners will apply for a Gradizza production concession in Q1 2014, calling the rig-less test commercially viable. Also repaid €1.5m of Nedbank debt by year-end, leaving €3.5m outstanding.

    joint venture update

    122m shA$13.3m
  2. 29 Aug

    Gradizza-1 reached 1,030 m and found a 10 m gross gas column with 9 m of net gas sand in the primary target. PVE is completing the well and testing for about a week; a first positive result for the 9 bcf prospect.

    drilling result

    122m shA$10.6m
  3. 14 Aug

    Drilling of the Gradizza-1 exploration well in La Prospera has begun, targeting Quaternary sands at about 1,000 m, expected to take around 10 days. PVE holds 75% after the Petrorep (15%) and AleAnna (10%) promote.

    drilling spud

    122m shA$10.2m
  4. 12 Aug

    CEO Giovanni Catalano steps down as CEO and director, his consultancy agreement terminated by the board. CFO Sara Edmonson becomes Acting CEO while a successor is sought. Follows a weak half-year result; the text gives no stated reason beyond board's view of company's interests.

    director officer appointment

    122m shA$10.2m
  5. 8 Aug

    First-half loss of €5.63m including a €5.02m non-cash write-down of Castello's Vitalba well. Revenue €3.0m (about 30% lower), EBITDA €0.91m, on lower output and spot prices. Bezzecca final award now expected late 2013; a cost review is under way.

    half year report

    122m shA$10.2m
  6. 5 July

    Sillaro restarted its main levels at about 65,000 m3/day after the separator was installed, targeting 75,000. But Castello was cut to 5,000-10,000 m3/day after water increased in May. Q2 output was 4.74m m3, down 25%, revenue about 20% lower.

    production update

    122m shA$8.9m
  7. 1 July

    New gas sale contract with Shell Italia from 1 July 2013, priced off Italian gas benchmarks, with an option to extend. Follows the shift to spot-market sales via InTrading since late 2012; no volumes or price stated.

    contract award

    122m shA$8.9m
  8. 6 June

    Tozzona exploration licence (about 90 sq km, Emilia-Romagna) fully awarded by the Ministry for an initial six-year term. Its gas targets lie beside ENI's Santerno field. Resolves the earlier Tozzona environmental review; work starts with buying ENI 2D seismic.

    regulatory community update

    122m shA$9.7m
  9. 9 May

    Commits to drill Gradizza-1 (planned late June 2013) and signs AleAnna Resources to earn 10% of La Prospera by funding a promote on the well. With Petrorep's 15%, PVE keeps 75% and operatorship. Both deals need Ministry approval.

    farm in farm out agreement

    122m shA$8.9m
  10. 6 May

    Completes a €20m five-year reserve based lending facility with Nedbank, replacing the Lloyds facility (€4m drawn, due November 2013). Resolves the refinancing thread; funds Bezzecca, offshore and pipeline development.

    debt financing

    122m shA$8.9m
  11. 30 Apr

    March quarter: output 6.3m m3, revenue €1.6m. New independent report lifts 2C gas resources to 79.5 bcf and offshore AR94PY 2C to 47.3 bcf (from 24.8). Gradizza-1 spud expected by end June; Sillaro restart awaiting regulator approval. New lending facility negotiations well advanced.

    quarterly activities report

    122m shA$8.9m
  12. 18 Mar

    2012 result: first profit before tax, €201,570, on revenue €8.20m and EBITDA €4.51m. Net profit €2.37m includes a first-time €2.23m deferred tax asset. Debt cut to €4.0m; production down 15% to 24.7m m3. Sillaro expected back to 80,000 m3/day in April 2013.

    annual report

    122m shA$9.7m

2012111m shares · A$10.0m market cap

  1. 3 Dec

    Raises A$1.35m by placing 11,266,667 shares at A$0.12 with institutions and sophisticated investors. Proceeds fund the Sillaro gas plant upgrade and working capital. Directors' shares (3.85m) need shareholder approval at a meeting in late January. Follows the AGM-flagged capital-raising options.

    capital raising announcement

    111m shA$10.0m
  2. 26 Sept

    Bezzecca gas field gets a preliminary production concession, as expected for August; final award is expected around year-end after the environmental review. Resources become reserves: 0.7 bcf proven, 4.1 bcf 2P. First production phase connects the existing well to the Castello plant by 7 km line.

    resource reserve update

    111m shA$14.1m
  3. 20 July

    Final award of the AR94PY offshore permit in the Adriatic (previously AR168PY), the company's first offshore permit. It holds the Carola and Irma gas discoveries with 2C of 24.8 bcf. The company will buy 3D seismic and plan development.

    asset acquisition disposition

    111m shA$9.6m
  4. 15 June

    Petrorep Italiana can earn 15% of the Cadelbosco di Sopra licence, which covers the Zini-1, Canolo-1D and Canolo-2D wells, and 15% of La Prospera (Gradizza-1) via an option. Petrorep pays a promoted share of drilling costs plus past costs. Subject to Ministry approval. First farm-out of the strategy.

    farm in farm out agreement

    111m shA$9.2m
  5. 17 Apr

    Independent review by Fugro Robertson puts 2P gas reserves at 8.9 bcf (11.8 bcf in 2010), reflecting 1 bcf produced and the Castello cut. Gas 2C contingent resources rise to 44.1 bcf from 21.6 bcf, plus 10 mmbbls of 2C oil at Bagnolo in Piano and Ravizza.

    resource reserve update

    111m shA$11.3m
  6. 20 Mar

    2011 revenue €9.11m (up 27%) and EBITDA €4.41m, but a net loss of €5.07m after a €5.83m non-cash Castello write-down. Modelling suggests a lower optimal rate, so Castello reserves are expected to be cut. New reserve estimates are due next quarter.

    financial restatement

    111m shA$12.5m
  7. 8 Feb

    Vitalba-1dirA began producing on 8 Feb at about 0.5m cf/day, targeting 0.7m. Sillaro is held at 1.6m cf/day because extra condensate forced a halt; processing equipment may be needed, with cost and timing under evaluation. The company calls it a straightforward operational issue.

    production update

    111m shA$14.1m

2011111m shares · A$13.3m market cap

  1. 16 Dec

    Vitalba-1dirA flowed up to 2.6m cubic feet a day in clean-up, stabilising at 1.4 and 0.6m on smaller chokes, with no water. The company estimates a production rate of about 0.7m cf/day, starting January 2012. Castello restart is on track, and revised reserves are still to come.

    flow test result

    111m shA$13.3m
  2. 6 Dec

    Vitalba-1dirA reached 1,730 m measured depth (1,524 m vertical). Logs show one gas zone, 4.2 m of pay in the Pliocene SAN A2 sand, so the well will be completed and flow-tested. The first sign the Castello restart well found gas.

    drilling result

    111m shA$13.3m
  3. 31 Oct

    Workover has started at Vitalba-1dirA, the well meant to restart Castello. It should take 20 days to reach 1,400 m vertical depth. The company's reservoir consultants estimate remaining 2P reserves at 3.7 bcf.

    drilling spud

    111m shA$15.3m
  4. 5 Sept

    PVE reports its first half-year net profit, €0.37m, on revenue of €4.35m (up 68%) and EBITDA of €2.26m. Cash is €1.6m and debt €6.0m. Vitalba-1dirA drilling is due in coming weeks, with Castello restart targeted before year-end.

    half year report

    111m shA$15.3m
  5. 18 Apr

    Italian authorities gave final approval for Vitalba-1dirA and PVE contracted LP Drilling's rig HH200. Castello production is expected to restart late Q3 or early Q4 2011 if drilling succeeds. Sant'Alberto and Podere Gallina 2D seismic is complete, with processing under way.

    contract award

    111m shA$18.5m
  6. 22 Feb

    Po Valley is awarded the Cadelbosco di Sopra and Grattasasso exploration licences (six-year initial terms), adding 547 km2 to reach nearly 2,000 km2, a 38% rise. They cover the old Correggio field, and a drilling application is targeted by Q3 2011.

    asset acquisition disposition

    111m shA$20.0m

2010110m shares · A$19.5m market cap

  1. 12 Oct

    Giovanni Catalano, Deputy CEO/COO since July, becomes CEO from 11 October 2010, succeeding founder Michael Masterman, who becomes non-executive Deputy Chairman. The text says Masterman is leaving his executive role to take a position at a major mining company. Catalano's fixed pay is €180,000.

    director officer appointment

    110m shA$19.5m
  2. 8 Sept

    A review of Sillaro and Fantuzza cut both. Sillaro 1P fell 22% to 8.1 bcf and 2P fell 40% to 8.8 bcf, while Fantuzza 2C fell 78% from 26.6 bcf to 5.8 bcf. The Correggio review was still ongoing.

    resource reserve update

    110m shA$21.1m
  3. 26 July

    Castello 2P reserves cut 42% to 3.66 bcf (from 6.3 bcf); 1P falls to 0.11 bcf. The existing well can only make 3,000-5,000 m3/day. Most remaining gas sits in an attic needing a new ~€2.5m well, Vitalba-1dirA, with authorisation expected by 2Q 2011.

    resource reserve update

    110m shA$24.3m
  4. 23 July

    The tribunal rejected the rival bidder's challenge to the Azzurra offshore licence preliminary award, clearing the way for final grant, expected second half 2010. The 526 km2 Adriatic area includes four gas discoveries. This resolves the legal dispute open since October 2008.

    regulatory community update

    110m shA$24.3m
  5. 8 July

    Giovanni Catalano, formerly CEO of Mediterranean Oil & Gas, becomes Deputy CEO and COO, succeeding Doug Colkin whose contract ended in June. Sara Edmonson joins as Finance and Administration Manager, and two technical hires were made.

    director officer appointment

    110m shA$24.3m
  6. 6 July

    June quarter production was 4.6m m3, down 15%, with revenue about €1.22m. Sillaro reached about 95,000 m3/day. Castello tests found water entering the deeper San A2 level, which is now closed, and possible perforation problems on San A1. Debt cut to €7m; cash €2.5m.

    production update

    110m shA$24.3m
  7. 19 May

    Sillaro, the second field, began commercial gas production. Sillaro-2 is running at 31,200 m3/day, with the plant to reach 110,000 m3/day over the next month. This is roughly double Castello's rate and arrives as Castello's reserves are in doubt. Release is misdated April.

    production update

    110m shA$29.9m
  8. 29 Apr

    Castello wellhead pressure is falling faster than expected. If the trend continues, production and reserves (proven 4.6 bcf) would be substantially lower. Downhole tests are due in May, with results in June. This is the first sign of trouble at the only producing field.

    production update

    110m shA$97.6m
  9. 15 Apr

    Bezzecca development plan: 2P reserves cut to 3 bcf, with two wells producing about 2 mmcf/d via an 8 km line to Castello. Geology is more complex than expected. Production is targeted by 2012, a sharp downgrade from the earlier larger estimate.

    resource reserve update

    110m shA$97.6m

2009110m shares · A$124m market cap

  1. 21 Dec

    First gas from Castello flowed into the Italian grid, building to about 1.5 mmcf/d and targeting 2.5 mmcf/d. Po Valley has banked its first revenue, ending the long wait since 2005. Sillaro commissioning expected early 2010, which should roughly double output.

    production update

    110m shA$124m
  2. 8 Dec

    Ministry of Economic Development signed final approval on 7 December to begin production at Castello after safety inspections. First gas into the national network expected next week. Sillaro plant 85% complete, commissioning January 2010.

    regulatory community update

    110m shA$124m
  3. 3 Nov

    Castello plant is connected to the national grid, and an operations and maintenance contract with DG Impianti covers Castello and Sillaro. Operating cost at full production is estimated at about €2 cents per cubic metre versus Italian gas prices of €22-25 cents. First commercial sales expected later this month.

    material agreement

    109m shA$123m
  4. 30 Sept

    Oversubscribed placement of 5.5m shares at A$1.55 (3% discount) raising A$8.52m via Petra Capital, lifting shares on issue to 108.9m. A share purchase plan at the same price is planned. Described as strengthening working capital ahead of Castello commissioning.

    capital raising announcement

    103m shA$120m
  5. 15 Sept

    Company adopts a revised reserves policy following SPE/WPC principles. Bezzecca and Fantuzza become Contingent Resources until development plans are approved, and Bezzecca contingent resources are expected to be lower than pre-drilling targets. Sillaro reserves will be reassessed after Sillaro-2.

    resource reserve update

    103m shA$128m
  6. 18 Aug

    Sillaro-2 testing confirmed four levels with a combined 13 mmcf/d, including a new 2,023 m level at 3.5 mmcf/d; six levels now proven across both wells. Well completed on budget; plant installation starts early September, commissioning December 2009. Castello 85% complete.

    well test result

    103m shA$112m
  7. 4 Aug

    Po Valley and 50:50 partner Edison voluntarily relinquished the Bernaga (formerly Ossola) licence application north of Milan, citing nature-reserve concerns and low prospects of full grant. Ends the long-pending Ossola thread; other preliminary awards unaffected.

    asset acquisition disposition

    103m shA$112m
  8. 28 July

    Sillaro-2 reached 2,364 m on schedule; logs confirm the main pay zones seen in Sillaro-1 over 140 m gross (2,180-2,320 m). Extra possible zones, including 15 m at 2,020 m, will be completed and tested in early August.

    drilling result

    103m shA$107m
  9. 3 July

    Sillaro-2 production well spudded 2 July, planned to about 2,400 m vertical depth in roughly 24 days. With Sillaro-1 it should give 3.8 mmcf/d initial capacity; completion expected end of August before plant installation.

    drilling spud

    103m shA$107m
  10. 1 July

    Installation began at Castello on 30 June, with contractor Semat targeting four months. Plant is described as 78% complete, with start-up in late October 2009 at 2.7 mmcf/d initial capacity.

    production update

    102m shA$106m
  11. 22 June

    Castello plant installation approval received, the final regulatory approval needed. It unlocks civil works from 29 June, Sillaro-2 drilling in early July and the Bank of Scotland senior facility, which converts the A$8.7m (€5m) current debt to a four-year line expiring 2013.

    regulatory community update

    102m shA$110m
  12. 21 Apr

    Bezzecca-1 tested gas on all three levels: deep Miocene 2.2, shallow Miocene 0.55 and Pliocene 1.0 mmcf/d, a combined 3.75 mmcf/d. Rig released to move on before Sillaro-2. Development size still to be assessed.

    well test result

    102m shA$96.2m
  13. 15 Apr

    Bezzecca-1's deepest Miocene level flowed 2.2 mmcf/d on a quarter-inch choke at 1760 psi, stable with good pressure recovery, which the CEO calls above expectations. More tests to follow; Castello and Sillaro commissioning now said to be from third quarter.

    flow test result

    102m shA$96.2m
  14. 31 Mar

    Logs on Bezzecca-1 show potential gas zones, including about 31 m gross pay in the primary Miocene target (1913-1944 m) plus a smaller Pliocene level. The well will be cased and flow tested; drilled in 16 days.

    drilling result

    102m shA$96.2m
  15. 13 Mar

    Bezzecca-1 appraisal drilling began 12 March on the 100%-owned Cascina San Pietro permit, after repeated slips from January. Target depth expected in 20 days, first results by mid April. Company says field could be 5 to 10 times Castello's size.

    drilling spud

    102m shA$111m
  16. 26 Feb

    Second gas sales contract signed with Elettrogas for 50% of initial Castello and Sillaro output, worth about A$150m combined with January's Italtrading deal (about A$75m each). Pre-sells the first three years; commissioning starts from July 2009.

    contract award

    102m shA$110m
  17. 23 Feb

    A$10m placement of 8.33m shares at A$1.20, versus A$1.30 prior close, to fund Castello and Sillaro and Bezzecca drilling while keeping debt low. Masterman may add up to A$1m, subject to shareholder approval. Bezzecca 1 spud now said to be March.

    capital raising announcement

    94.8m shA$106m
  18. 30 Jan

    December quarter: first gas sales contract of €38m awarded for 50% of production; Castello output expected June/July and Sillaro Sept/Oct 2009. Cash A$5.2m, €5.0m drawn on bank facility; second tranche needs authority documentation. Bezzecca 1 now due Q2 2009.

    quarterly activities report

    94.8m shA$106m

200894.8m shares · A$95.3m market cap

  1. 27 Nov

    Italy granted a 20-year Sillaro production concession, the company's largest asset (14 bcf 2P, 3.8 mmcf/d initial rate), following Castello's grant. Production expected in 2009. Resolves the regulatory bottleneck that delayed Sillaro.

    regulatory community update

    94.8m shA$95.3m
  2. 10 Nov

    Italy granted a 20-year Castello production concession, the long-awaited final approval after repeated slips. Castello has 4.6 bcf proven reserves and 2.7 mmcf/d initial rate; start-up anticipated Q2 2009.

    regulatory community update

    94.8m shA$95.3m
  3. 7 Nov

    La Prospera and Terra del Sole converted to formal six-year exploration licences, expiring 2014. Gradizza target (about 7 bcf P50) is to be drilled late 2009 or early 2010. These follow earlier preliminary awards.

    regulatory community update

    94.8m shA$95.3m
  4. 23 July

    Po Valley received a preliminary award, subject to environmental clearance, of the 513 km² Cadelbosco di Sopra licence, including the former ENI Correggio gas field (247 bcf produced). Targets a possible return to production; resolves a pending application.

    asset acquisition disposition

    91.9m shA$116m
  5. 16 July

    Po Valley won a competitive preliminary award of the 526 km² AR168PY 'Azzurra' offshore Adriatic licence, its first offshore block, subject to environmental clearance. Separately, Bezzecca 1 now has environmental approval, with spud scheduled for November.

    asset acquisition disposition

    91.9m shA$116m
  6. 30 May

    The chairman says the hoped-for May (Sillaro) and July (Castello) approval dates have slipped. Final approvals are now targeted for late September, and plant installation is delayed towards the end of Q1 2009. Surface plant is about 50% complete. Doug Colkin was appointed COO in March.

    regulatory community update

    90.7m shA$114m
  7. 31 Mar

    Castello received its Lombardia environmental approval, following Sillaro's in January. But first gas is now targeted for about December 2008 (Sillaro) and two months later for Castello, possibly two months more after the April election. Management says regulatory slowness delayed production by up to a year.

    regulatory community update

    90.4m shA$119m
  8. 18 Mar

    Po Valley and Edison settle the Ossola dispute: Ossola will be a 50:50 JV, subject to final licence grant, with Po Valley operating until the first well. Edison's 50% in Sant'Alberto and San Vincenzo converts to a 3.75% royalty, giving Po Valley 100%.

    farm in farm out agreement

    90.4m shA$108m
  9. 25 Feb

    Po Valley completed its €25m facility with Bank of Scotland: €5m is available now, and up to €20m more after production concessions are formally granted, now expected in the June quarter (slipped from March). Completes the facility announced in December.

    debt financing

    90.4m shA$98.1m
  10. 30 Jan

    Sillaro received its environmental decree from the Emilia Romagna region, one of the last steps before the production concession. Castello's decree is expected soon. Surface plant is over 20% complete. Company says first revenue is expected this year.

    regulatory community update

    90.4m shA$98.1m

200790.4m shares · A$88.3m market cap

  1. 5 Dec

    Bank of Scotland Corporate will provide up to A$34m (€20m) of finance: A$8m initially, the rest once the production concession is formally granted. It is Po Valley's first debt and funds plant construction and 2008 wells. Final approvals expected March 2008.

    debt financing

    90.4m shA$88.3m
  2. 12 Nov

    The Ministry confirmed Po Valley's application for a 526 km2 licence in the northern Adriatic, its first offshore bid, covering three gas targets drilled by ENI. Recoverable reserves are expected around 45 bcf. One competing application exists; decision at next Commission.

    regulatory community update

    90.4m shA$96.1m
  3. 7 Nov

    The Ministry formally gave preliminary award of production concessions for Sillaro and Castello, resolving the long-awaited April Commission outcome. Full grant still needs environmental decrees, expected in November. Company's timetable shows final award around January 2008.

    regulatory community update

    90.4m shA$96.1m
  4. 29 Oct

    Po Valley awarded SEMAT Spa a A$9.6m contract to build and install surface plant for Castello and Sillaro. Equipment is due on site May 2008, with first gas targeted early in Q3 2008. Castello is expected first, Sillaro after Sillaro 2 is drilled. Resolves the pending surface plant award.

    contract award

    90.4m shA$101m
  5. 23 Oct

    Po Valley signed a contract with HydroDrilling for the Ideco 1200 rig to drill Sillaro 2, Bezzecca 1 and Fantuzza 1 from April 2008. Sillaro 2 is to be drilled before first production. This secures the rig for the next drilling program.

    contract award

    90.4m shA$101m
  6. 20 June

    Po Valley placed 4,325,000 shares at A$1.65 to raise A$7.136m, mainly to John Hancock (3.5m shares), Cranport and Hunter Hall. Funds go to first production, exploration and gas storage. Shares on issue rise to 89.88m. The price is below the A$1.95 placement of 2006.

    capital raising announcement

    85.6m shA$104m
  7. 7 June

    Po Valley and UK gas storage operator Star Energy will jointly bid for up to five Italian gas storage licences. Tenders close September 2007 and results are expected in the first quarter of 2008. This opens a new business line beyond gas production.

    joint venture update

    85.6m shA$104m

200649.3m shares · A$60.4m market cap

  1. 14 Nov

    SNAM Rete Gas agreed a Sillaro grid connection only 300 metres away, with an estimated A$230,000 cost. Po Valley also signed an engineering, procurement and construction contract with Orion Energy for the Sillaro and Castello surface plants. This replaces the earlier 4km spur plan.

    material agreement

    49.3m shA$60.4m
  2. 30 Oct

    Po Valley raised A$5.85m by placing three million shares at A$1.95 with Harbinger (17.2% holder) and Hunter Hall (14.1%). Shares on issue reach 85.5m. It also won exclusive rights to proceed with five new licences covering 1,610 sq km. This follows the falling cash balance.

    capital raising announcement

  3. 2 June

    Po Valley lodged its Sillaro production concession application, the formal start of approval for first commercial gas. Sillaro 2 is planned for 2006 or early 2007, with a spur line to the national grid targeted at over 8 million cubic feet a day.

    regulatory community update

  4. 30 May

    Po Valley has applied for eight new exploration licences covering 2,005 square kilometres, almost double its current area. Grants are expected progressively through 2007; five applications have competing bids, so joint ventures are being discussed. These are applications only, not yet granted.

    asset acquisition disposition

  5. 21 Feb

    Proven gas reserves rose 45% to 36.6 bcf from 25.3 bcf after a consultant review; 2P was steady at 104.6 bcf and 3P at 130.4 bcf. First sales at Sillaro and Vitalba are targeted for late 2006 or early 2007.

    resource reserve update

  6. 30 Jan

    Vitalba 1d flowed 2.8 million cubic feet a day from the San 1 and San 2 levels, above the 1 to 1.5 million expected. Third positive test in six weeks after Sillaro and Santa Maddalena; further evaluation is needed before production.

    well test result