Each one in plain English, with the numbers worked through for a shareholder.
29 May 2007drilling result● NeutralMajor
West Florence-1 reached 1,957 metres total depth, short of the planned 2,134 metres, and wireline logs were run. Hydrocarbon shows were seen while drilling; their significance is still being evaluated. Not yet a discovery.
Victoria Petroleum's repeat of 1,781 metres for West Florence-1. Its partner table now shows Victoria at 25% and a 'Private American Interest' at 15%, with Mountain's 40% no longer listed as such. This is unexplained in the text.
Fall River reports West Florence-1 at 1,334 metres and now labels the 100-200 bcf gas and up to 15 million barrels of oil as prospective resources, with no certainty they are present. No new result.
Fall River's own report that West Florence-1 was drilling ahead at 1,170 metres; the Muddy J is expected near 1,800 metres. Fall River holds 15%. No new result.
West Florence-1 drilling ahead at 1,078 metres. The operator's potential estimate is restated as 100-200 bcf of gas plus about 15 million barrels of oil combined across three formations, on the whole 12,000 acres, if present. No new result.
Partner Victoria Petroleum repeats that West Florence-1 was drilling ahead at 1,078 metres on 10 May. No new result; duplicates the earlier Fall River and operator update.
Fall River confirms West Florence-1 (the Slanovich 32-23 well) began drilling on 3 May 2007 and was at 502 metres. Target depth is 2,134 metres, with the Muddy J sandstone at about 1,800 metres. Fall River holds 15%.
Victoria Petroleum, a West Florence partner, reports the operator spudded West Florence-1 on 3 May 2007, drilling at 502 metres. It lists Fall River at 15% in this release. Duplicates Fall River's own announcement.
Slanovich 32-23 at West Florence, Colorado is planned to spud early May 2007 to about 7,000 ft, targeting the Muddy J sandstone. Fall River's 15% share is budgeted at US$137,723 of US$918,154, below the earlier US$165,000 estimate. Operator estimates 100-200 bcf potential.
Martin Place mandated to raise A$1.4m through 20,000,000 CDIs at A$0.07 with 20,000,000 options at A$0.10 over 24 months. The price is below January's A$0.10 placement. Funds are for a two-well US program, the first spudding May 2007, and cash flow.
What it means for a shareholder
20.0m new shares at A$0.070 to raise about A$1.4m. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.
Cover note attaching Questar's press release on its Trail 13C-15J Baxter Shale well, about 80 km from Fall River's acreage. The substance repeats the previous day's announcement.
Fall River relays that Questar's Trail 13C-15J well, about 80 km from its Baxter acreage, flowed 9 million cubic feet a day. Fall River says it shows 'sweet spot' upside, but such zones are currently unpredictable. It is another company's well, not Fall River's.
Re-release of the audited 2006 accounts with a chairman's report, restating the same figures: net loss C$2,044,719 and the clean audit opinion. The chairman highlights the Baxter test and plans to acquire more North American interests.
Management discussion for the year to 30 September 2006, restating known facts: 20% Sprowl interest producing about 670 mcf/d and 15 bbl/d, revenue below projections, and a sixth well planned. It also says Sprowl should earn about A$300,000 a year if the sixth well succeeds.
Fall River gets a 15% interest in 12,000 acres at West Florence, Colorado, with operator Mountain Energy. It will join the Slanovich 32-23 well around May 2007, with its share at US$165,000. Company estimates 100-200 bcf potential.