History
Octanex spent years on carried offshore exploration and a Malaysian oil field that ended uneconomic, then pivoted to gold, relinquished everything, and was taken private by its chairman in 2023.
2009-2010: Listing and early deals
Octanex was admitted to the ASX Official List on 4 November 2009, after a prospectus for a placement of up to 1,000,000 shares at $0.30. Its New Zealand subsidiary won an offshore Taranaki permit, PEP 51906, and in December 2009 the Cornea-3 well in WA-342-P, where Octanex held 8%, found a 20.4 metre oil column. OMV and ENI then committed to drill on the Exmouth Plateau, and Octanex chose to keep a 20% fully carried interest (its drilling costs paid by partners) rather than take US$16m.
In 2010 Octanex bid for Orion Petroleum, but the offer lapsed in June with its conditions unmet. It then merged with Goldsborough, in which it already held 45.15%, issuing 6,059,528 new shares. To fund itself it ran a partly paid rights issue (shares paid only 5c up front) that closed fully subscribed, raising $2,167,057 from 43,341,151 shares. Most of the listed options were also exercised, raising $1.49m.
2011-2014: Dry holes, farmouts and a big sale
The Exmouth Plateau program disappointed. Gawain-1 (April 2011) and Galahad-1 (May 2011) both came up dry, though Octanex bore no cost. Farmouts improved the picture: Santos took 75% of the Winchester permits and paid A$7m for past costs, and OMV took 65% of PEP 51906. Octanex declared a 4 cent special dividend in 2011 and, in January 2012, collected $7,066,427 when the 10c call was paid on most partly paid shares. It also planned to distribute its Cue Energy and Orion shares as a special dividend.
In 2013 Santos made a gas discovery at Winchester-1, with net gas pay later lifted to 58m. NZOG paid US$12.5m for 12.5% of PEP 51906, leaving Octanex 22.5%. Shell's Palta-1 was dry, though Octanex had already received US$5m in discovery payments. Matuku-1, spudded in November 2013, was plugged in January 2014 without confirming commercial hydrocarbons. Octanex also agreed to buy 25% of the Canning Basin's Derby Block and moved to merge with Peak Oil & Gas, but the Peak merger was terminated in December 2014, leaving Octanex with a net $1,887,159 advanced to Peak.
2014-2016: The Sabah deal and Ophir
Octanex's 50% share of the Ophir oil field offshore Malaysia, with bank loans for development, became its central project. In late 2014 it signed with Sabah International Petroleum (SIP) for a US$12m bridge loan, US$5m for 40,332,663 shares and US$12m of convertible notes. Shareholders approved this in February 2015. The Derby Block purchase was terminated, and the Peak loan was eventually settled in November 2015 for a share of Peak's Cadlao proceeds, capped at $1,603,683. In late 2016 the unpaid 10c on the partly paid shares was cancelled and they were consolidated into fully paid shares at 3 for 5. PETRONAS approved a cheaper Ophir plan in September 2015, but first oil slipped to 2017.
2017-2019: Ophir's brief life
Ophir drilled three wells and reached contractual first oil, with production starting on 20 October 2017. A power trip in January 2018 stopped production, and attempts to restart failed. The risk service contract was terminated in June 2018 as the field reached economic cut-off. Meanwhile regulators first refused, then reopened, then saw Octanex withdraw its Ascalon retention lease applications. Octanex withdrew from WA-362-P and WA-363-P after Eni left, and WA-323-P (Winchester) expired in July 2018. In March 2019 Octanex settled the SIP note by handing SIP its Ophir holding company, the related debt and US$2,089,449 in cash. Cornea's lease expired in July 2019.
2019-2022: The gold pivot
In October 2019 Octanex added gold exploration, applying for licences in Western Australia's Sefton area. Three were granted in January 2021, and sampling found low-level gold anomalies. A placement of 15M shares at 5 cents raised $750,000 in May 2021, taking shares to 257.8M. Octanex earned 65% of Sefton and elected to go to 80%. Ascalon expired in February 2022 after Octanex did not seek renewal. But a July 2022 review downgraded the gold results, and in November 2022 Octanex relinquished all its remaining tenements.
2022-2023: Taken private
With no exploration assets, Octanex owed $760,069 to the Albers Group and employees. Chairman Geoff Albers proposed a scheme paying non-associated shareholders $0.002 per share, about $207,000 in total. The company had a shareholder funds deficiency of about $682,000. ASX suspended trading on 16 March 2023 over an auditor disclaimer. Shareholders approved the scheme on 23 May with 96.13% of votes cast, and the court approved it on 5 June. Octanex was removed from the ASX on 6 June 2023, with Albers and associates owning 100% and payment due on 14 June 2023.
Written from the 118 story beats below (2009 to 6 June 2023), which come from the company's own announcements and filings.