Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

25 Oct 2012drilling progress report● Neutral

Early wireline logs at Nicolay #1 show the Goldwyer is more shale-bearing than core observations suggested, consistent with the gas shows. Further interpretation is needed. Core analysis results are expected early 2013. This is the final weekly report; rig then moves to Gibb Maitland #1.

Value this in the calculator →Discuss in chat

18 Oct 2012drilling result● NeutralMajor

Nicolay #1 was drilled to 3,564m, deeper than the 3,450m plan, to cover the whole Goldwyer. Gas shows faded below ~3,350m, with no heavier hydrocarbons seen. Limestone was thicker than expected. Significance awaits logs and lab work; rig moves to Gibb Maitland #1.

Value this in the calculator →Discuss in chat

11 Oct 2012drilling result▲ GoodMajor

Nicolay #1 cut its first Goldwyer core, 54m with 100% recovery, from 3,150m. Gas readings (methane to propane) began from about 2,850m and desorption confirms gas, but the company says significance is unknown until detailed analysis over coming months.

Value this in the calculator →Discuss in chat

4 Oct 2012drilling progress report● Neutral

Nicolay #1 is at 2,728m, 46 days after spud. The 9 5/8 inch casing was cemented and pressure tested successfully, and drilling resumed in 8.5 inch hole. Next step is drilling to the first coring point in the Nita and Goldwyer formations.

Value this in the calculator →Discuss in chat

27 Sept 2012drilling progress report● Neutral

Nicolay #1 is at 2,649m, with 9 5/8 inch casing being run and cemented at 2,643m in the upper Bongabinni formation. Drilling will then continue to the Nita formation to prepare for coring. No hydrocarbons were encountered, none expected.

Value this in the calculator →Discuss in chat

20 Sept 2012drilling progress report● Neutral

Nicolay #1 is at 2,593m, having made only 343m in the week as the Nibil formation proved thicker than expected, slowing drilling to 2-3m per hour. The company says this adds drilling time but has no material implication for the well prognosis. No hydrocarbons expected.

Value this in the calculator →Discuss in chat

13 Sept 2012drilling progress report● Neutral

Nicolay #1 is at 2,250m, 25 days after spud, having drilled 847m in the week despite some rig downtime from mechanical issues. No hydrocarbons were encountered, none expected. The 55-day estimate to about 3,450m is unchanged.

Value this in the calculator →Discuss in chat

6 Sept 2012drilling progress report● Neutral

Nicolay #1 is at 1,403m, 18 days after spud, and is pulling out of the hole to change the drill bit. No hydrocarbons were encountered, and none were expected. The 55-day estimate to about 3,450m is unchanged.

Value this in the calculator →Discuss in chat

30 Aug 2012drilling progress report● Neutral

Nicolay #1 reaches the first casing point at 858m, where 13 3/8 inch casing is run, cemented and pressure tested. Drilling continues toward the second casing point above the Nita and Goldwyer formations. The 55-day estimate is unchanged.

Value this in the calculator →Discuss in chat

23 Aug 2012drilling progress report● Neutral

Nicolay #1 is at 660m, five days after spud, drilling toward a first casing point on the way to about 3,450m. No hydrocarbons are expected at this stage. ConocoPhillips is funding the first US$13m per well, and the 55-day estimate is unchanged.

Value this in the calculator →Discuss in chat

23 Aug 2012drilling progress report● Neutral

NSE starts an airborne gravity survey (about 3,695 line km) over EP417 and the Seven Lakes SPA, taking about 3 weeks. It fulfils the work commitments for both areas, and follows the 2011 Lawford #1 well that missed the Laurel target. Results are due within 40 days of completion.

Value this in the calculator →Discuss in chat

20 Aug 2012drilling spud▲ GoodMajor

Nicolay #1, the first Goldwyer Phase 1 well, spudded on 18 August after the delay, targeting about 3,450m (deeper than the earlier 3,200m). Drilling is expected to take about 55 days, with coring and logging only, no fracturing or flow testing.

Value this in the calculator →Discuss in chat

2 Aug 2012drilling scheduled▼ Bad

Nicolay #1 spud slips from July to mid-August after faults in a rig control panel, now reported resolved. NSE says it is not liable for rig rates during rig-up. First Goldwyer well delayed by about two weeks or so.

Value this in the calculator →Discuss in chat

2 July 2012drilling progress report● Neutral

The rig has reached the Nicolay #1 site after a 2,500km move from Darwin and is being rigged up, with spud expected in the next few weeks subject to final compliance inspections. Work continues on Gibb Maitland #1 and Blatchford #1.

Value this in the calculator →Discuss in chat

31 May 2012resource reserve update▲ GoodMajor

Technical review of the 100%-owned Merlinleigh Project cites potential gas in place of up to 33 TCF unconventional and up to 1.2 TCF conventional across four prospects. These are potential figures, not booked resources. Native title talks are advanced; partnering to be assessed in H2 2012, drilling planned H1 2013.

Value this in the calculator →Discuss in chat

30 May 2012drilling scheduled▲ Good

NSE takes delivery of MB Century Rig #14 after Darwin customs and quarantine clearance and begins moving it to Nicolay #1 (about 3,200m), with spud now expected around mid July. Vertical wells are for data, and no flow testing is expected.

Value this in the calculator →Discuss in chat

25 Nov 2011resource reserve update▲ GoodMajor

First 2P reserves booked for Heintschel: independent D&M assessment gives gross 33.7 BCF wet gas and 0.96 MMBO, with 124.55 BCF wet gas and 3.56 MMBO in place. NSE favours horizontal wells over more vertical ones. Final D&M report still awaited.

Value this in the calculator →Discuss in chat

24 Oct 2011drilling result▼ BadMajor

Lawford #1 stopped at 2,690m, short of the 2,780m plan, to be logged and plugged without reaching the Laurel Formation, which lies deeper than modelled. No significant shows. The deepening meets EP417 work commitments; more studies planned over 12 to 24 months.

Value this in the calculator →Discuss in chat

24 Oct 2011drilling result▼ Bad

Buru confirms Lawford-1 ends at 2,690m, citing hard formations, geological uncertainty, no significant shows and the approaching wet season. The rig moves to deepen Buru's Paradise-1. Buru calls the well outside its core areas. Duplicates NSE's news.

Value this in the calculator →Discuss in chat

20 Oct 2011drilling progress report● Neutral

Weekly update: Lawford #1 drilled to 2,483m by 20 Oct against a 2,780m target, no hydrocarbon indications. NSE holds 65%, diluting to 50%. No new result.

Value this in the calculator →Discuss in chat

20 Oct 2011drilling progress report● Neutral

Buru's weekly report: Lawford-1 drilled to 2,483m at 20 Oct, day 23, still heading for the Laurel Formation. No hydrocarbon indications. Duplicates NSE's update.

Value this in the calculator →Discuss in chat

13 Oct 2011drilling progress report● Neutral

Buru's weekly report: Lawford-1 deepening at 1,953m on 13 Oct, day 16, with 10 days to go to 2,780m. No hydrocarbon indications. Duplicates NSE's update.

Value this in the calculator →Discuss in chat

13 Oct 2011drilling progress report● Neutral

Weekly update: Lawford #1 drilled to 1,953m by 13 Oct, with about 10 days to reach 2,780m. No hydrocarbon indications reported. No new result.

Value this in the calculator →Discuss in chat

6 Oct 2011drilling progress report● Neutral

Buru's weekly report: Lawford-1 deepening drilled to 1,725m at 6 Oct, day 9 after spud, still heading for the Laurel Formation. No hydrocarbon indications. Duplicates NSE's update.

Value this in the calculator →Discuss in chat

6 Oct 2011drilling progress report● Neutral

Weekly update: Lawford #1 drilled to 1,725m by 6 Oct, heading for the Laurel Formation, with no hydrocarbon indications. NSE holds 65%, diluting to 50%. No new result.

Value this in the calculator →Discuss in chat

30 Sept 2011farm in farm out agreement▲ GoodMajor

NSE signs a binding farm-out: ConocoPhillips funds up to US$109.5m over four phases to earn 75% of Goldwyer, leaving NSE 25%, plus A$1m upfront. Three wells planned in 2012; it formalises the July heads of agreement. Subject to regulatory approvals; ConocoPhillips can withdraw each phase.