Stockle - the stock oracle

New Standard Energy Limited

ASX:NSE
A$0.004Latest close held · delayed

Past year: ▲ 0%(0.40c – 0.40c AUD)

Market cap
A$3.6m
Shares on issue
889m
In-ground value
A$13.50bn
Risked multiple
under review
Story beats
124 since 2007
Last event
29 Aug 2022

History

A tungsten explorer turned Canning Basin and Texas gas player, it sold its assets in 2015, then shrank to a shell with no permits and was delisted in 2022.

2007-2008: From tungsten to Canning Basin oil

The company began life as Hawk Resources, an explorer with tungsten prospects near Cue in Western Australia, including 80% of Callie Soak, and a Queensland coal permit bought for $75,000. In May 2008 it agreed to merge with oil and gas explorer New Standard Energy, shifting its focus to the Canning Basin. A prospectus offered 32.5m shares at 20c to raise $6.5m, and the raising closed oversubscribed, with $7.5m raised. The merger completed on 29 July 2008 and the company was re-quoted on ASX as NSE from 8 August.

Drilling came quickly. Buru Energy agreed to fund 35% of the first two EP417 wells. Lanagan 1, which targeted a prospect estimated at 220 million barrels of oil in place, found no significant hydrocarbons. Lawford 1 was suspended at about 1,320m, short of its targets, because of site delays and the coming wet season.

2009-2011: Texas gas and the Goldwyer shale

In 2009 NSE diversified. It farmed into a Texas 3D seismic project for A$2.5m and sold its Acacia Fairway permits to Buru for $3.2m cash plus 18m Buru shares. The Texas program began producing results in 2010. Brasher #1 was its first US well and its first revenue. Heintschel #1 was fracced (fractured to stimulate flow) and settled at about 2.4 mmcf of gas a day, and Joann #1 was also a discovery. Moeller #1 was disappointing. Cash ran thin, and in July 2010 NSE raised $6.5m at 14.5c. The Canning Basin Goldwyer shale became a focus, and a Merlinleigh gas project was added in the Carnarvon Basin. A partnership search for the Goldwyer failed at the end of 2010.

In 2011 the operator lifted its Heintschel estimates, and first reserves were booked. Green Rock Energy took 15% of EP417, and the deepened Lawford #1 reached 2,690m without finding the target formation. NSE sold some Buru shares, and in September 2011 signed a binding deal under which ConocoPhillips would fund up to US$109.5m to earn 75% of the Goldwyer. A $27.0m raising at 30c followed, and shares on issue rose from 190m at the end of 2010 to 283m at the end of 2011.

2012-2013: Cash from Buru, trouble with the rig

In 2012 NSE sold its remaining Buru shares, 5m at $3.18 and 10m at $2.74, bringing cash above $65m. It also took a stake in Elixir Petroleum. Merlinleigh's permits were granted after a native title agreement. The first Goldwyer well, Nicolay #1, reached 3,564m and found gas shows that faded lower down; their significance awaited analysis. In February 2013 NSE terminated its drilling contract over safety and rig reliability concerns, and the second well, Gibb Maitland #1, was suspended. PetroChina agreed to buy 29% of the Goldwyer venture from ConocoPhillips, and Phil Thick replaced Sam Willis as Managing Director. In October 2013 NSE took Buru's 35% of EP417 for nothing, reaching 100%.

2014-2015: Eagle Ford and Cooper Basin, then the sale

In December 2013 NSE agreed to buy 5,182 net acres in the Eagle Ford (a Texas oil field) from Magnum Hunter and to farm into Cooper Basin PEL 570. Shareholders approved on 20 January 2014, and 65.65m shares went to Magnum Hunter, making it the largest shareholder. The first operated wells, Peeler Ranch-5H and 6H, flowed at 705 and 758 barrels of oil equivalent a day. A Credit Suisse facility of up to US$45m was finalised at 13% interest. Meanwhile NSE took back 100% of the Southern Canning Project for nothing, and sold 35% of PEL 570 to Santos.

Then lower oil prices bit. Drilling was cut and fracking delayed, and by March 2015 production had fallen to 250-300 barrels a day, staff were cut to four and directors' fees were suspended. In June NSE agreed to sell its US and Cooper assets to Sundance for about A$24m, including six million Sundance shares and the assumption of about US$16m of debt. The sale completed in August 2015 and all debt was eliminated, leaving only the Western Australian permits.

2015-2018: Huizhou takes control

Magnum Hunter sold its shares to Jara Resources in October 2015. Chinese company Huizhou Energy then bought 91.4m shares at 1c, becoming the largest holder with 19.15%. Three Canning permits (EP417, EP443, EP450) were allowed to lapse in early 2016. Thick resigned as Managing Director, and in September 2016 leadership turned over to Bruce Li Hua, with Song Hui of Huizhou as chairman. A rights issue at 0.4c raised $955,224 in December 2016, and Huizhou underwrote about 84% of it. In late 2017 the board was overhauled again, with Xiaofeng Liu as Managing Director and Kunfang Liu as chairman, unpaid until its strategy is implemented. A legacy $1.2m claim was settled in January 2018, and a placement at 0.6c raised $429,851 in June.

2019-2022: Suspension and delisting

A 0.6c placement in May 2019 raised $204,134, after cash had fallen to about $64,000. In October 2019 ASX suspended the shares until the company could show it could estimate and fund its rehabilitation obligations. The same day the regulator refused the renewal of EP482. A further $400,000 was raised at 0.6c, taking shares to 888.7m. The company chose not to renew EP481, which expired in August 2020, leaving no exploration permits. Rehabilitation of old well sites remained unfunded.

By 30 September 2021 cash was $39,000. After failing to pay its annual listing fees, New Standard was removed from the ASX official list on 26 August 2022, with its shares suspended since October 2019. As of 29 August 2022 it had no permits, very little cash and open rehabilitation obligations.

Written from the 124 story beats below (2007 to 29 Aug 2022), which come from the company's own announcements and filings.

Beat by beat

The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.

shares on issue market cap (log scale)

2022889m shares · A$3.6m market cap

  1. 29 Aug

    New Standard was removed from the ASX official list from close of trading on 26 August 2022 for not paying its 2022/23 annual listing fees. Its shares had been suspended since October 2019, and the announcement gives no information on any exit or trading arrangement for holders.

    registration revoked

    889m shA$3.6m
  2. 22 Aug

    ASX lists New Standard among already-suspended companies that have not paid 2022/23 annual listing fees. Unless paid by 26 August 2022, it will be removed from the official list. This repeats the 2021 fee warning, which the company then evidently got past.

    listing compliance notice

    889m shA$3.6m

2021889m shares · A$3.6m market cap

  1. 23 Aug

    ASX lists New Standard among already-suspended companies that failed to pay annual listing fees for 2021/22. Unless paid by 27 August 2021, it will be removed from the official list.

    listing compliance notice

    889m shA$3.6m

2020889m shares · A$3.6m market cap

  1. 18 Aug

    The company chose not to renew EP481, which has expired, leaving it with no exploration permits. Unlike EP482, which DMIRS refused, this was the company's own decision. Rehabilitation of the old well sites continues.

    regulatory community update

    889m shA$3.6m
  2. 30 Jan

    December quarter: a $400,000 placement at 0.6c was completed, lifting shares to 888.7m and cash to about $402,000. The rehabilitation site visit slipped to early 2020; shares stay suspended with no relisting date, and EP482 has lapsed.

    quarterly activities report

    889m shA$3.6m

2019716m shares · A$3.6m market cap

  1. 14 Oct

    ASX suspended the company's shares immediately. They stay suspended until it shows it can reliably estimate its rehabilitation obligations, has the financial capacity to meet them, and complies with Listing Rule 12.2.

    listing compliance notice

    716m shA$3.6m
  2. 14 Oct

    DMIRS refused the renewal of EP482, so the permit has expired, leaving EP481 as the only exploration permit. This resolves the open EP482 renewal thread against the company. Rehabilitation continues and project talks are not yet disclosable.

    regulatory community update

    716m shA$3.6m
  3. 9 May

    Completed a $204,134 placement of 34.0m shares at 0.6c to sophisticated investors introduced by the board. Funds are for new opportunities, DMIRS obligations and working capital. Shares on issue rise to 822.1m, after cash had fallen to about $64,000.

    capital raising announcement

    716m shA$3.6m

2018716m shares · A$2.9m market cap

  1. 13 Sept

    The regulator extended exploration permit EP481 to 15 August 2020, securing one of the two remaining permits. EP482's renewal is not mentioned in this announcement.

    regulatory community update

    716m shA$2.9m
  2. 6 Sept

    Both permits stay valid while renewals are decided. The regulator has set rehabilitation deadlines for the historic wells of 15 August 2020 and 30 November 2019. This sets a firm timeline for the open rehabilitation thread.

    regulatory community update

    716m shA$2.9m
  3. 22 June

    Completed a $429,851 placement of 71.6m shares at 0.6c to sophisticated investors introduced by the board, taking shares on issue to 788.1m. Funds are for new opportunities, DMP obligations and working capital. It follows the December 2016 rights issue at 0.4c.

    capital raising announcement

    716m shA$3.6m
  4. 16 Jan

    The 2013 Precision Catering litigation against subsidiary NSO, claimed at about $1.2m, has been settled and dismissed. Terms are confidential but stated to have no material impact. This resolves a legacy liability.

    other

    716m shA$2.1m

2017716m shares · A$2.9m market cap

  1. 21 Dec

    Board overhaul: Kunfang Liu becomes chairman, with Ming Li, Chee Ho Ho and Peng Zhang as directors. Chairman Song, Han, Zhang and Bruce Li resigned. The new board will keep stabilising the company while seeking growth, and will go unpaid until its strategy is implemented.

    director officer appointment

    716m shA$2.9m
  2. 27 Nov

    Xiaofeng Liu, an existing director with 26 years' oil and gas experience, becomes Managing Director, replacing Bruce Li, who stays as non-executive director and company secretary. A technical background now leads the company.

    director officer appointment

    716m shA$2.1m

2016716m shares · A$3.6m market cap

  1. 23 Dec

    The rights issue closed 20 December, raising $955,224. Shareholders took up only $83,542 and the shortfall offer $72,664, so Huizhou underwrote $799,018, about 84%. 238.8m shares are to be issued on 29 December. Funds are for working capital and reviewing opportunities.

    capital raising announcement

    716m shA$3.6m
  2. 30 Nov

    Launches a 1-for-2 non-renounceable rights issue at 0.4c per share to raise up to $955,224, fully underwritten by Huizhou, an entity controlled by Chairman Song. This is the long-delayed rights issue, now at a 25% discount to the 30-day VWAP; it issues 238.8m shares. Non-participants are diluted.

    capital raising announcement

    716m shA$2.9m
  3. 12 Sept

    Leadership turns over: Bruce Li Hua becomes Managing Director and Company Secretary, Zhang Dongbo joins the board, and Chairman Arthur Dixon and Thick resign. Song Hui (Huizhou) is chairman. Huizhou's review leads to EP481 and EP482 not being renewed. Rights issue approvals are still being finalised.

    director officer appointment

    386m shA$2.3m
  4. 6 July

    Managing Director Phil Thick resigns effective 31 July 2016 to pursue other business, staying as non-executive director until 31 October 2016. The board will search for a replacement to pursue growth opportunities in oil and gas and other areas.

    director officer appointment

    386m shA$1.5m
  5. 27 Jan

    December quarter: cash $634,000, no debt. Three Canning permits (EP417, EP443, EP450) were allowed to lapse; EPs 451, 456, 481 and 482 are kept, under DMP discussion. Rights issue timing is still being discussed and is now expected to raise up to $1m.

    quarterly activities report

    386m shA$2.3m

2015386m shares · A$3.5m market cap

  1. 1 Dec

    Huizhou placement completed: 91,442,400 shares issued at 1c, raising about $914,000 and lifting shares on issue to 477.6m, with Huizhou at 19.15%. Huizhou can appoint up to two directors; six-month standstill applies. Resolves the 24 November agreement.

    capital raising announcement

    386m shA$3.5m
  2. 24 Nov

    Chinese company Huizhou Energy signs to buy 91.4m shares at 1c ($914k), becoming largest holder with 19.15%, followed by a 1-for-3 rights issue of up to $1.6m that Huizhou underwrites. Huizhou is to help find a farm-in partner for the Western Australian assets; no guarantee given.

    capital raising announcement

    386m shA$4.2m
  3. 20 Oct

    Magnum Hunter, the largest shareholder since the 2014 alliance, sold its 65.65m shares to Jara Resources. Directors Kip Ferguson and Jeffrey Swanson resigned, ending Magnum Hunter's involvement and leaving three directors.

    director officer appointment

    386m shA$4.6m
  4. 10 Aug

    The Sundance sale completed after shareholders approved it at the 4 August meeting. New Standard received 6m Sundance shares, part escrowed up to 6 months, and all its debt is eliminated. It is left with the Western Australian permits and a strategic review.

    asset acquisition disposition

    386m shA$3.1m
  5. 29 June

    New Standard agrees to sell its US and Cooper Basin assets, including Eagle Ford and its 17.5% of PEL 570, to Sundance for about A$24m: six million Sundance shares (~A$3.18m) plus assumption of ~US$16m debt. This clears all debt, leaving the WA acreage. Shareholder vote due late July.

    asset acquisition disposition

    386m shA$3.1m
  6. 31 Mar

    Credit Suisse releases a further US$3m from its facility as interim working capital while New Standard pursues corporate transactions, joint ventures or asset sales. No deal is yet binding. A 12-month extension on a large Texas lease is in final negotiation.

    debt financing

    386m shA$3.5m
  7. 3 Mar

    Production is now 250-300 boepd, down from 400 last quarter, and fracking of the two new wells is pushed back again. Staff cut to four, directors' fees suspended, MD salary halved, Chris Sadler resigns. Funding talks are said to conclude within two weeks; lenders back interim funding.

    other

    386m shA$9.7m

2014386m shares · A$38.6m market cap

  1. 28 Oct

    Independent report lifts net Eagle Ford 2P reserves 83% to 4.89m BOE, with 2P PV10 of A$72.3m; 1P up 133% to 3.58m BOE, 3P up 33% to 16.45m BOE. Credit Suisse confirms the next debt draw is available. Builds on January 2014 reserves.

    resource reserve update

    386m shA$38.6m
  2. 24 Oct

    Peeler Ranch-7H spuds 25 October, followed by Lagunillas Camp #3. The program is cut from three wells to two, with fracking delayed to Q1 2015 because of lower oil prices. Liquidity of up to $16m is expected through Q1 2015. Changes the earlier three-well plan.

    drilling spud

    386m shA$38.6m
  3. 23 Oct

    New Standard sells a 35% operated stake in PEL 570 to Santos, keeping 17.5%, for $7.5m cash plus Santos funding 75% of the remaining $42.5m earn-in commitments. Net spend could fall to as little as $3.05m. Santos becomes operator, replacing the earlier 52.5% position.

    farm in farm out agreement

    386m shA$38.6m
  4. 6 Oct

    New Standard takes back 100% of the Southern Canning Project from ConocoPhillips and PetroChina for nil consideration, removing a 10m+ third-well obligation. It has hired Miro Advisers to farm out all WA acreage. Reverses the 2013 PetroChina deal and the 25% JV structure.

    farm in farm out agreement

    386m shA$38.6m
  5. 1 Oct

    New Standard plans three Atascosa wells from mid-October 2014, with longer laterals and more proppant. It says well cost fell from US$8.5m to US$6.5m, and Type III wells could cost 10-15% more. Net acreage is now 5,585. Continues the 2H 2014 drilling plan.

    drilling scheduled

    386m shA$38.6m
  6. 30 July

    South Australia's regulator approved a six-month suspension of all PEL570 work commitments and moved the seismic survey from September 2014 to March 2016. This cuts New Standard's Cooper Basin spending for about 12 months, with drilling now in Year Two. Follows the earlier request to revise the program.

    regulatory community update

    386m shA$52.1m
  7. 4 June

    Southern Canning JV delayed Brooke North-1 until late 2015 because approvals were not in time for this wet season. New Standard defers all Canning and Carnarvon drilling to 2015 and is renegotiating the Enerdrill contract. Reverses the 2014 drilling plan; Condon-1 timing is implied to move.

    regulatory community update

    386m shA$52.1m
  8. 29 May

    New Standard finalised a Credit Suisse senior secured facility, up to US$45m (up from the US$32.5m term sheet), with US$9m drawn initially. Interest is 13% a year, initial term 2.5 years, with 80% of oil hedged. Resolves the March term sheet.

    debt financing

    386m shA$56.0m
  9. 28 May

    Peeler Ranch-5H and 6H flowed at 705 and 758 boepd over 24 hours (1,463 combined), 93-94% oil. Company says oil output beats the 2013 Peeler-4H (735 boepd, more gas). First operated Eagle Ford wells meet expectations; two more wells planned for 2H 2014.

    flow test result

    386m shA$56.0m
  10. 31 Mar

    New Standard agreed a term sheet for a senior secured debt facility of up to US$32.5m over two and a half years: US$12.5m initially, plus US$20m tied to Peeler Ranch-5H and 6H results. Closing depends on due diligence and documents. Follows the facility under negotiation.

    debt financing

    386m shA$59.8m
  11. 11 Feb

    Magnum Hunter's Kip Ferguson joins the board as a non-executive director, as flagged at completion of the Eagle Ford deal. Founding director Dr Mark Hagan resigns, and Sam Willis returns as an executive director.

    director officer appointment

    305m shA$50.4m
  12. 29 Jan

    New Standard completed buying 5,182 net Eagle Ford acres from Magnum Hunter on 28 January 2014, issuing 65.65m shares as part payment. Magnum Hunter is now the largest shareholder and the alliance starts. A credit facility is still being negotiated. Resolves the December 2013 deal.

    asset acquisition disposition

    305m shA$36.6m
  13. 28 Jan

    New Standard spudded Peeler Ranch-5H on 26 January 2014, its first Eagle Ford well, operated by Magnum Hunter. Expected to take about 20 days to reach 2,950m vertical depth with a 1,735m lateral; the rig then moves to the 6H well. Meets the lease spud deadline noted earlier.

    drilling spud

    305m shA$36.6m
  14. 21 Jan

    After shareholders approved all resolutions on 20 January, New Standard completed buying Outback Energy Hunter and Pathfinder (15m shares issued to vendors) and exercised the Eagle Ford option: US$15m cash plus US$9.5m in shares (65.6m) to Magnum Hunter. Completion expected the following week; Kip Ferguson joins board.

    business combination

    305m shA$36.6m
  15. 10 Jan

    Independent report certifies Eagle Ford 3P reserves of 12.3 million barrels of oil equivalent on the 5,182 acres being bought, about $2 per barrel of 3P. 2P oil is 1.88 million barrels. 61 drilling locations identified; EGM set for 20 January 2014.

    resource reserve update

    305m shA$36.6m

2013305m shares · A$41.2m market cap

  1. 10 Dec

    New Standard will buy 5,182 net Eagle Ford acres in Texas from Magnum Hunter (five producing wells, US$5,300 per acre headline) and farm into 52.5% of Cooper Basin PEL 570 by spending $42.5m. Magnum Hunter becomes largest shareholder. Shareholder vote planned January 2014; a shift from pure exploration toward production.

    business combination

    305m shA$41.2m
  2. 10 Dec

    Condon-1 at Merlinleigh is pushed from early December 2013 to the second half of 2014, by agreement with Enerdrill, so about $13m can go to two Eagle Ford wells first. This reverses the earlier December spud plan; the company says no large extra costs arise.

    drilling scheduled

    305m shA$41.2m
  3. 11 Oct

    New Standard lifts its EP417 interest in the Laurel Project from 65% to 100% by taking Buru Energy's 35% for nil consideration. With Seven Lakes, net Laurel acreage is 1.46m acres. Buru said the 2014 commitment well is not a priority; New Standard still plans a farm-out.

    asset acquisition disposition

    305m shA$50.4m
  4. 11 July

    PetroChina has Chinese and Australian approvals and has paid ConocoPhillips for 29% of the Canning joint venture; only Western Australian registration remains. Interests will be ConocoPhillips 46%, PetroChina 29%, New Standard 25% (valued about A$28m). Goldwyer Project renamed Southern Canning Project.

    farm in farm out completion

    305m shA$36.6m
  5. 3 July

    New Standard signed with Enerdrill for Rig #3: a firm two-well program plus options for two more. Drilling restarts with Condon #1 at Merlinleigh in late 2013, then 1-3 Canning wells from mid-2014. Merlinleigh seismic is deferred and a farm-out process begins. Cash $41.5m.

    contract award

    305m shA$36.6m
  6. 26 Mar

    Non-executive director Phil Thick becomes Managing Director from 2 April 2013, replacing Sam Willis, who stays on as a director focusing on strategy and corporate matters. Follows the rig contract termination. Thick gets 2m options (40c and 50c) subject to shareholder approval.

    director officer appointment

    305m shA$61.1m
  7. 15 Mar

    Green Rock Energy announced it is selling New Standard its 15% of EP417 and 40% of Seven Lakes for A$1.65m: A$1m upfront, A$650k later. This returns New Standard to full ownership of Seven Lakes. EP417 stake size afterwards is an inference: 65% plus 15%.

    asset acquisition disposition

    305m shA$61.1m
  8. 4 Mar

    Scoping study supports Merlinleigh's conventional and unconventional potential. About $3m will fund up to 150km of new 2D seismic in mid 2013, ahead of a planned 1-2 well drilling program in 2014 and a farm-out process targeted for the second half of 2013. Company holds 100%.

    regulatory community update

    305m shA$61.1m
  9. 21 Feb

    PetroChina is set to buy 29% of the Goldwyer joint venture from ConocoPhillips, leaving ConocoPhillips 46% and New Standard 25% as operator. The deal values the project at about US$100m and New Standard's stake at about US$25m. Subject to approvals and New Standard's pre-emptive rights.

    farm in farm out agreement

    305m shA$64.1m
  10. 8 Feb

    New Standard terminated the drilling contract with MB Century over safety, competency and rig reliability concerns, backed by an independent audit. Gibb Maitland #1 is suspended and the rig demobilised. The ConocoPhillips farm-in stays on foot; a replacement rig is being sought. Company says permit tenure is not at risk.

    material agreement termination

    305m shA$64.1m

2012305m shares · A$93.1m market cap

  1. 6 Dec

    Gibb Maitland #1 spudded 5 December on EP450, the second Phase One Goldwyer well after Nicolay #1. It targets a central Kidson sub-Basin setting with about 65 days planned, to gather data only, with no flow testing planned. Company holds 25%, ConocoPhillips 75%.

    drilling spud

    305m shA$93.1m
  2. 25 Oct

    New Standard sold its remaining 10 million Buru shares at $2.74 for $27.4m before costs, following the 5m sold in August at $3.18. Cash rises to over $65m, which the company says supports expanding its oil and gas activities.

    asset acquisition disposition

    305m shA$147m
  3. 18 Oct

    Nicolay #1 was drilled to 3,564m, deeper than the 3,450m plan, to cover the whole Goldwyer. Gas shows faded below ~3,350m, with no heavier hydrocarbons seen. Limestone was thicker than expected. Significance awaits logs and lab work; rig moves to Gibb Maitland #1.

    drilling result

    305m shA$147m
  4. 11 Oct

    Nicolay #1 cut its first Goldwyer core, 54m with 100% recovery, from 3,150m. Gas readings (methane to propane) began from about 2,850m and desorption confirms gas, but the company says significance is unknown until detailed analysis over coming months.

    drilling result

    305m shA$147m
  5. 20 Aug

    Nicolay #1, the first Goldwyer Phase 1 well, spudded on 18 August after the delay, targeting about 3,450m (deeper than the earlier 3,200m). Drilling is expected to take about 55 days, with coring and logging only, no fracturing or flow testing.

    drilling spud

    305m shA$172m
  6. 13 Aug

    Merlinleigh's two exploration permits are granted after a native title agreement with the Gnulli group, resolving the open permit and native title thread. NSE holds 100%. Partnering assessment follows in H2 2012, with on-ground exploration in 2013.

    regulatory community update

    305m shA$172m
  7. 6 Aug

    NSE sells 5m of its 15m Buru shares at $3.18 for $15.9m before costs, lifting cash above $40m. It bought them at 17c in 2009. It keeps 10m Buru shares, and cites capital management and funding for Merlinleigh partnering.

    asset acquisition disposition

    305m shA$172m
  8. 31 May

    Technical review of the 100%-owned Merlinleigh Project cites potential gas in place of up to 33 TCF unconventional and up to 1.2 TCF conventional across four prospects. These are potential figures, not booked resources. Native title talks are advanced; partnering to be assessed in H2 2012, drilling planned H1 2013.

    resource reserve update

    293m shA$173m
  9. 26 Apr

    Goldwyer Phase 1 stays on track: Nicolay #1 (EP456, about 3,200m) is the first well, with a July 2012 spud intended. ConocoPhillips' cap rises to US$13m per well (US$39m total); NSE funds overruns and 25% of about US$5m of studies. Conditions precedent are now met or waived.

    joint venture update

    292m shA$216m
  10. 2 Mar

    NSE agrees to buy up to a 15% stake in ASX-listed Elixir Petroleum, which holds the Moselle Project in France, for up to about $2.25m. The initial placement is at 6.25c per share. A new, early-stage exploration exposure outside Australia and Texas.

    asset acquisition disposition

    292m shA$146m
  11. 29 Feb

    NSE secures MB Century Rig #14 for a five-well program over 2012-13, with options on up to six more wells. Goldwyer Phase 1 drilling (three wells, funded by ConocoPhillips) is set for mid 2012; two Merlinleigh wells are planned for early 2013, subject to permits.

    contract award

    292m shA$146m

2011200m shares · A$62.0m market cap

  1. 25 Nov

    First 2P reserves booked for Heintschel: independent D&M assessment gives gross 33.7 BCF wet gas and 0.96 MMBO, with 124.55 BCF wet gas and 3.56 MMBO in place. NSE favours horizontal wells over more vertical ones. Final D&M report still awaited.

    resource reserve update

    200m shA$62.0m
  2. 26 Oct

    NSE launches a $27.0m raising at 30c: a $23.0m placement (29.0m shares for $8.7m now, 47.7m for $14.3m needing shareholder approval ~1 Dec) plus a $4.0m share purchase plan. Funds Merlinleigh and other WA shale and tight gas projects. Pro forma cash ~$30m.

    capital raising announcement

    200m shA$61.0m
  3. 24 Oct

    Lawford #1 stopped at 2,690m, short of the 2,780m plan, to be logged and plugged without reaching the Laurel Formation, which lies deeper than modelled. No significant shows. The deepening meets EP417 work commitments; more studies planned over 12 to 24 months.

    drilling result

    200m shA$61.0m
  4. 30 Sept

    NSE signs a binding farm-out: ConocoPhillips funds up to US$109.5m over four phases to earn 75% of Goldwyer, leaving NSE 25%, plus A$1m upfront. Three wells planned in 2012; it formalises the July heads of agreement. Subject to regulatory approvals; ConocoPhillips can withdraw each phase.

    farm in farm out agreement

    198m shA$60.4m
  5. 28 Sept

    Lawford #1 deepening began 27 Sept from 1,323m toward 2,780m, ~13 days. NSE (65%, diluting to 50%) estimates over 500 Bcf gas in place; it does not expect free flow. Green Rock's final $200,000 back-cost payment is triggered, as the September spud planned.

    drilling spud

    198m shA$63.4m
  6. 15 Aug

    Century Rig #7 is secured to deepen Lawford #1 in EP417, spudding mid-late September, to about 2,800m (earlier plan ~2,600m). Buru runs the rig. Green Rock owes a further $250,000 now and $200,000 at drilling start. NSE first Australian drilling in almost three years.

    drilling scheduled

    198m shA$63.4m
  7. 25 July

    NSE is offered the Seven Lakes Special Prospecting Authority next to EP417, expanding its Laurel Project by about 87% to 1.46m gross acres. NSE would hold 60% and Green Rock 40% under the March agreement, each paying its own share. First acreage under that agreement.

    regulatory community update

    198m shA$37.7m
  8. 13 July

    NSE signs a non-binding heads of agreement for ConocoPhillips to fund up to US$109.5m over four phases to earn 75% of the Goldwyer Project, leaving NSE 25%, plus A$1m upfront. Binding agreements targeted by 30 September 2011; this follows the failed earlier partnering search.

    farm in farm out agreement

    198m shA$37.7m
  9. 10 May

    NSE sold 3m of its 18m Buru shares at 67c for $2.01m (bought at 17c), lifting cash above $4m. It keeps 15m shares (8.2%) and says this avoids further raisings for now.

    asset acquisition disposition

    191m shA$30.6m
  10. 3 May

    Arthur Dixon AM, a Shell veteran with over 20 years in LNG, is appointed non-executive chairman. Ian Paton moves back to being a non-executive director. Mr Dixon is named for development expertise as NSE pursues shale gas.

    director officer appointment

    191m shA$30.6m
  11. 14 Apr

    Joann #1 is producing about 1.58 mmcf/d gas and 80 bbl/d condensate on a restricted choke, a higher condensate ratio than the 38 bbl/d seen in the 2010 test. NSE's 33.68% share is about $120,000 a month at stated prices.

    production update

    191m shA$30.6m
  12. 17 Mar

    Green Rock Energy farms into EP417: pays $750,000 back costs, funds 27.5% of Lawford #1 deepening and earns 15%. NSE falls from 65% to 50%, keeps operatorship, and gets a funded well in Q3 2011. This follows the earlier 2008 suspension at 1,325m. A 60/40 mutual-interest deal is also signed.

    farm in farm out agreement

    191m shA$36.3m
  13. 10 Mar

    Operator AKG lifted Heintschel mid-case estimates to 209 bcf gas and 8.7 mmb condensate in place (projected recoverable 93 bcf, 3.9 mmb), up from earlier recoverable 58.9 bcf and 1.07 mmb. Three wells produce 3,250 mcf/d and 125 bbl/d, about $195,000 a month net to NSE. Independent reserves audit planned.

    resource reserve update

    191m shA$36.3m
  14. 2 Feb

    Initial flow-back on D.Truchard #1 and Heintschel #2 reached commercial rates: 1 to 1.7 mmcf/d gas plus 20-60 barrels of condensate. Both made more water than expected. Rates are preliminary and not stabilised. Joann #1 tie-in slipped to about two weeks.

    flow test result

    191m shA$39.1m
  15. 12 Jan

    Heintschel #2 logs show a significant hydrocarbon column in the Prairie Bell sands, in line with pre-drill expectations, with no gas/water contacts and extra sands below. It will be completed, with fracs on D.Truchard #1 and #2 around 24/25 January. Joann #1 is due on production by end-January.

    drilling result

    191m shA$39.1m

2010190m shares · A$50.4m market cap

  1. 24 Dec

    NSE will not conclude a Goldwyer partnership deal for now, missing its year-end target. Large companies cited technical uncertainty from early-stage permits and a limited database. NSE will do more studies in Q1 2011. Aerial gravity (>13,000 km) is complete and EP450/451 relinquishment was revised.

    farm in farm out agreement

    190m shA$50.4m
  2. 20 Dec

    D.Truchard #1 logs show hydrocarbons across over 300 ft (~90 m) of Wilcox sands, with no gas/water contacts evident and sands higher than prognosed. Partners will complete it, with fracs in late January. First appraisal success for the Heintschel structure, though flow tests are still to come.

    drilling result

    190m shA$50.4m
  3. 24 Nov

    Burleson reports D. Truchard #1, the first Heintschel appraisal well, has spudded 2.9 km from Heintschel #1. It targets about 11,800 ft and should take about 28 days. It is estimated to cost US$1.1m dry, plus US$1.5m to complete. NSE holds 32.5%.

    drilling spud

    190m shA$40.0m
  4. 9 Nov

    A rig is contracted for two Heintschel wells: D. Truchard #1, a step-out 2.9 km from Heintschel #1, spudding around 18 November, then offset well Heintschel #2, 370 m away. Fracs are expected late December 2010 and early February 2011. Cash is about $6m.

    drilling scheduled

    190m shA$40.0m
  5. 1 Nov

    After the frac, Heintschel #1 is stabilised at about 2.4 mmcf gas and 100 barrels condensate a day to sales on a restricted choke. That compares with 1.0-1.4 mmcfd before the frac. Condensate ratio is nearly double earlier tests, and appraisal and development wells are now planned.

    production update

    190m shA$40.0m
  6. 28 Oct

    The Heintschel #1 frac was completed and the well is flowing gas and condensate at good rates while it cleans up. It is expected to go to sales next day. Definitive rates are not yet known, but early signs are encouraging.

    well test result

    190m shA$35.2m
  7. 13 Sept

    NSE awarded a contract for over 13,000 line km of aerial gravity data across its Goldwyer shale acreage, taking about 10 weeks and due by end 2010. It meets the revised permit commitments and will guide 2011-12 drilling. Earlier plans said 6,000 km.

    contract award

    190m shA$29.5m
  8. 28 July

    Operator AKG estimates Heintschel contingent recoverable resources of 59 Bcf gas and 1.1m barrels condensate (mid case; range 25.6-88 Bcf). NSE says this could mean over A$100m net revenue, undiscounted, if developed. Frac likely September; more drilling expected from October.

    resource reserve update

    101m shA$21.8m
  9. 22 July

    NSE is raising $6.5m: a $4.5m placement of 31.0m shares at 14.5c, plus a $2.0m share purchase plan underwritten by Euroz. Funds go to Australian shale exploration, US drilling and working capital. Tranche two ($2.5m) needs shareholder approval. This addresses the thin cash position.

    capital raising announcement

    101m shA$21.8m
  10. 15 July

    Joann #1 flowed 2.1 mmcfd of gas plus about 38 barrels a day of condensate from one 3 ft zone, confirming a discovery: the third success in four Colorado County wells. Three other zones are untested. NSE's interest is 33.68%.

    flow test result

    101m shA$21.8m
  11. 7 July

    Heintschel #1 flowed gas at 1.0-1.4 mmcfd from a 4 ft zone below the 225 ft gas column, without fraccing. The main 225 ft sands are still untested. NSE sees a larger structure than mapped; it holds 32.5%. Cash about $1.5m.

    flow test result

    101m shA$21.8m
  12. 5 July

    Moeller #1 initial testing produced mostly formation water and very little gas, because the water was unexpectedly low in salinity; NSE calls the results disappointing. The top 20 ft will be retested, and an updip location 150 ft higher is seen as promising. Joann #1 will be cased. Cash is now about $1.5m.

    drilling result

    101m shA$21.8m
  13. 21 June

    NSE won two Canning Basin application areas (100%) and is preferred bidder on a third, lifting its Goldwyer shale acreage to over 48,000 km2. DMP also approved replacing 600 line km of seismic with 6,000 line km of gravity gradiometry on EPs 450, 451, 456. NSE estimates this saves A$8-10m.

    asset acquisition disposition

    101m shA$17.2m
  14. 9 June

    The Moeller #1 drill stem test could not be run because of unstable hole, so the well will be cased and flow tested over about two weeks. Logs show 155 ft of gross gas saturated sands; NSE calls it a potential gas/condensate discovery. No size or flow rate yet.

    drilling result

    101m shA$17.2m
  15. 3 June

    NSE was awarded 100% of two Special Prospecting Authority areas, the Merlinleigh Project, covering over 8,500 km2 in the onshore Carnarvon Basin. It adds a shale and conventional gas option (up to 500 bcf in place, conventional) to the Canning Basin shale holdings, away from the Canning Basin.

    asset acquisition disposition

    101m shA$17.2m
  16. 10 May

    An independent adviser, NSAI, found the Goldwyer shale across NSE's ~37,000 km2 Canning Basin permits has the geological indicators for shale gas. NSE has hired Euroz to seek and assess potential partners and farm-out, with drilling targeted for 2011. No resource figure given.

    other

    99.9m shA$20.5m
  17. 3 May

    Moeller #1, the second Wilcox well, spudded 29 April, targeting 100 bcf and 2.4 million barrels of condensate at 12,500 ft. NSE has farmed in to raise its interest to 38.5% (from 36%), paying 39.33% of costs of ~US$1.9m dry or ~US$2.9m completed. Cash is about $3.0m.

    drilling spud

    99.9m shA$20.5m
  18. 27 Apr

    Logs at Heintschel #1 (TD 11,800 ft) show a 225 ft hydrocarbon column with 135 ft of gas sand, versus 85 ft expected. Low-permeability sands need fraccing, planned late June, to prove commercial flow. NSE 32.5%; rig moves to Moeller #1 (100 bcf potential).

    drilling result

    99.9m shA$15.0m
  19. 21 Apr

    Brasher #1, the Yegua gas discovery flow tested in March at 380 mcf/d, is now tied into the sales network and producing, the company's first revenue from the US program. NSE holds 32.5%; stabilised flow rates are to be reported in coming weeks.

    production update

    99.9m shA$15.0m
  20. 6 Apr

    Heintschel #1, the first Wilcox well, spudded 4 April, about a week or so after the late-March plan. It targets 7.2 bcf of gas and over 100,000 barrels of condensate at 11,750 ft, costing about US$2.5m. NSE holds 32.5%.

    drilling spud

    99.9m shA$15.0m
  21. 10 Mar

    NSE will accelerate shale gas work on the Goldwyer shale in its Canning Basin permits, after a review with an independent adviser found it prospective, though early stage. An adviser report is due within two months. No resource figure is given.

    other

    99.9m shA$12.5m
  22. 8 Mar

    Brasher #1 flow-tested at 380 mcf/d of gas with no water from the top 2 ft of the 14 ft gas zone. Pipeline hook-up and sales are expected within 30 days. Management calls it a small first step; focus shifts to larger Wilcox wells, first spud planned late March.

    well test result

    99.9m shA$12.5m
  23. 22 Feb

    Brasher #1 found a 14 ft gas column in the Yegua, and a formation test gave 100% gas. This is NSE's first US well; gas sales are expected in 30-45 days. Final size is unknown until extended flow testing. Focus now moves to the Wilcox wells.

    drilling result

    99.9m shA$9.2m
  24. 12 Feb

    Brasher #1, the first well of the six-well Colorado County program, has spudded, about two months later than planned. It targets 1.4 bcf of Yegua gas at 5,000 ft, with NSE holding 32.5%. A three-well Wilcox rig contract is secured, with the first Wilcox well due in March.

    drilling spud

    99.9m shA$9.2m
  25. 27 Jan

    NSE acquires a 36% working interest in two new Texas Wilcox projects (one in Colorado County outside the existing area, one in Wharton County) with Burleson and AKG. Each is said to have over 100 BCFE potential. Brasher #1 is deferred to early February.

    asset acquisition disposition

    99.9m shA$12.5m

200999.9m shares · A$7.0m market cap

  1. 3 Nov

    Joint venture agrees a six-well Colorado County program starting December 2009 with a Yegua well, then Wilcox wells from January 2010. A large Edwards/Sligo prospect (Woppa) is put at 350 Bcf and 250 Bcf potential. Funded from $6m+ cash. Lawford 1 revisit now targeted for 2H 2010.

    drilling scheduled

    99.9m shA$7.0m
  2. 4 Sept

    NSE completes the Acacia sale to Buru, receiving $3.2m cash and 18m Buru shares at 17c. Cash rises to $6.8m before costs, and NSE regains 100% of EP 443, 450, 451 and 456. The Buru farm-in is terminated.

    asset acquisition disposition

    99.9m shA$9.0m
  3. 12 Aug

    NSE sells its Acacia Fairway permits to Buru for $3.2m cash plus 18m Buru shares at 17c (deemed $6.3m), giving about a 10% Buru stake. Four permits revert 100% to NSE and the Buru farm-in ends. Pro forma cash is about $7m.

    asset acquisition disposition

    94.7m shA$4.7m
  4. 28 May

    Non-executive Chairman Gordon Hill, a founding director, will step down from the board effective 30 June 2009 to pursue other interests. He remains a significant shareholder.

    director officer appointment

    94.7m shA$4.9m
  5. 28 Apr

    NSE agrees to farm into a 32.5% interest in a Colorado County, Texas 3D seismic project with Burleson (38%) and operator AKG, for A$2.5m from existing cash. Drilling is planned from Q3 2009. It is a diversification beyond the Canning Basin.

    asset acquisition disposition

    94.7m shA$3.5m
  6. 17 Mar

    Trident Energy signs a binding heads of agreement to fund 25% of an initial program (200km 2D seismic by end-2010, one well by end-2011) to earn 17.5% of EP442(A). NSE keeps 82.5%, completing the EP442(A) farm-out talks noted earlier.

    farm in farm out agreement

    91.5m shA$4.6m

200891.5m shares · A$15.6m market cap

  1. 27 Oct

    Lawford 1 is being temporarily suspended at about 1,320m, short of the Anderson and Laurel targets, because of site delays and the coming wet season. NSE and Buru agreed to return early in the 2009 drilling season to finish the well. No result yet.

    drilling progress report

    91.5m shA$15.6m
  2. 6 Oct

    Lawford 1, the second EP417 well, spudded at 12:30pm on 4 October 2008 and was at 369m by 6 October, with no significant hydrocarbons. Planned depth is 1,650m. Targets are Anderson and Laurel sands; prospect could hold over 500 BCF gas or 440mmb oil if hydrocarbons are present. NSE 65%, Buru 35%.

    drilling spud

    91.5m shA$15.6m
  3. 17 Sept

    Lanagan 1, the first well of the campaign, found no significant hydrocarbons in the Basal Laurel Sandstones reached at 1,400m (gas up to 8 units). After logging at about 1,530m it is expected to be plugged and abandoned. This is effectively a dry hole against the 220mmb prospect.

    drilling result

    91.5m shA$18.3m
  4. 1 Sept

    Lanagan 1 spudded at 6pm on 29 August 2008, as flagged, and reached 430m by 1 September, on prognosis with only trace background gas. NSE holds 65% and Buru 35%. Target is the Basal Laurel Sandstones, expected at 1,650m.

    drilling spud

    91.5m shA$18.3m
  5. 27 Aug

    Buru Energy will fund 35% of the first two EP417 wells, Lanagan 1 and Lawford 1, to earn a 35% interest, paying $75,000 for past costs. It has an option for a further 15%. NSE stays operator, reducing its drilling cost exposure.

    farm in farm out agreement

    91.5m shA$18.3m
  6. 7 Aug

    The Canning Basin acquisition is complete and the company raised $7.5m under its prospectus. It will be re-quoted on ASX as NSE from 8 August 2008. This resolves the re-listing thread after the Hawk suspension.

    other

    91.5m shA$18.3m
  7. 6 Aug

    The company confirms the Hawk/NSE implementation agreement of 12 May 2008 completed on 29 July 2008, with shares issued to NSE shareholders. This closes the merger step; the Canning Basin assets are now inside the listed company.

    other

    91.5m shA$18.3m
  8. 18 July

    The raising closed oversubscribed, and Hawk intends to accept the full $1m of oversubscriptions on top of the $6.5m minimum, giving about $12m cash after settlement. Hawk shareholders approved the merger on 18 July; re-listing is targeted for late July.

    capital raising announcement

    28.4m shA$5.7m
  9. 30 June

    NSE signs a contract with Australian Drilling Services for rig #6 to drill two EP417 wells from August 2008, with an option for two more. First well Lanagan A, to about 1,800m, is due to spud mid-August; mean oil in place is estimated at 220 million barrels.

    contract award

    28.4m shA$7.2m
  10. 18 June

    Hawk lodges the prospectus for the NSE merger: 32.5m shares at $0.20 to raise $6.5m, with up to a further $1m from 5m oversubscription shares. Proposed directors include Gordon Hill as chair and Sam Willis, with Cygnet Capital as lead manager.

    capital raising announcement

    28.4m shA$6.5m
  11. 4 June

    NSE won a 100% interest in application area 28/07-8 (next to EP417) and an option over 50% of area 30/07-8 (next to EP442), lifting its Canning Basin holdings above 90,000 km2. These are applications only; native title negotiations have not started.

    asset acquisition disposition

    28.4m shA$6.5m
  12. 12 May

    Hawk agrees a conditional merger to acquire 100% of oil and gas explorer New Standard Energy (NSE), shifting from tungsten and coal to Canning Basin oil. It plans to raise at least $6.5m via 32.5m shares at 20c, needs shareholder approval and ASX re-compliance, and will rename itself New Standard Energy.

    business combination

    25.7m shA$5.1m
  13. 6 Mar

    Stage two soil sampling defined the Wilks Creek tungsten anomaly at about 1.9 km long and 100 m wide. Hawk is seeking approvals for a 12-hole, 1,200 m diamond drilling program to test it.

    drilling scheduled

    25.7m shA$7.7m

200725.6m shares · A$10.7m market cap

  1. 28 Dec

    Due diligence on Callie Soak is complete and the formal agreement signed, giving Hawk an 80% interest for $20,000 plus $40,000 of shares. This completes the October deal. Past drilling includes 3.0m at 1.77% WO3.

    farm in farm out completion

    25.6m shA$10.7m
  2. 17 Dec

    Hawk bought 100% of coal permit EPC 1070 (Mount McDonald North) in Queensland's Bowen Basin for $75,000: $20,000 cash plus 137,500 shares at $0.40. This is its first coal asset, alongside its tungsten projects.

    asset acquisition disposition

    25.6m shA$9.5m
  3. 3 Oct

    Hawk signed a Heads of Agreement to acquire 80% of the Callie Soak tungsten prospect near Cue, WA, for $20,000 cash plus $40,000 of shares, subject to due diligence. The 20% holder is free carried to a feasibility study.

    asset acquisition disposition