Each one in plain English, with the numbers worked through for a shareholder.
8 Dec 2010drilling progress report● Neutral
D.Truchard #1 is drilling at about 11,460 ft, near its planned depth. Somewhat elevated gas readings have been seen, but the target sands often show nothing while drilling, so logs after reaching total depth will decide whether it is completed.
Partner Burleson repeats that D.Truchard #1 is at 11,460 ft with somewhat elevated gas readings, and logging will decide on completion. Duplicates NSE's announcement of the same day.
Partner Burleson reports D.Truchard #1 drilling ahead at 5,732 ft, repeating NSE's announcement of the same day. Target depth is about 11,800 ft. No new information.
AGM presentation recapping known facts: three commercial successes from four US wells, Heintschel appraisal drilling under way, Goldwyer and Merlinleigh shale acreage. Shows cash of about $5.0m and the Buru stake at about $9.0m at 50c. Text is truncated; no new results visible.
NSE announces D.Truchard #1, the first Heintschel appraisal well, has spudded 2.9 km from Heintschel #1, targeting about 11,800 ft in around 28 days. NSE holds 32.5%. Success would be a step towards AKG's 59 Bcf mid case; cost US$1.1m dry, US$1.5m more to complete.
Burleson reports D. Truchard #1, the first Heintschel appraisal well, has spudded 2.9 km from Heintschel #1. It targets about 11,800 ft and should take about 28 days. It is estimated to cost US$1.1m dry, plus US$1.5m to complete. NSE holds 32.5%.
November update presentation restating known facts: Heintschel #1 at 2.4 mmcf and 100 bbls condensate a day, Brasher #1 at about 400 mcf a day, and a two-well appraisal program from around 18 November. Gives a Heintschel #1 payback of 8-10 months. Nothing new.
A rig is contracted for two Heintschel wells: D. Truchard #1, a step-out 2.9 km from Heintschel #1, spudding around 18 November, then offset well Heintschel #2, 370 m away. Fracs are expected late December 2010 and early February 2011. Cash is about $6m.
Partner Burleson says a rig is contracted for two Heintschel wells, with D. Truchard #1 due to spud around 18 November, 2.9 km from Heintschel #1. Heintschel #2 follows as an offset well. Repeats NSE's announcement of the same day.
After the frac, Heintschel #1 is stabilised at about 2.4 mmcf gas and 100 barrels condensate a day to sales on a restricted choke. That compares with 1.0-1.4 mmcfd before the frac. Condensate ratio is nearly double earlier tests, and appraisal and development wells are now planned.
Partner Burleson repeats the news that the Heintschel #1 frac was successful and the well is flowing gas and condensate while cleaning up, with sales expected next day. No new information beyond NSE's announcement.
The Heintschel #1 frac was completed and the well is flowing gas and condensate at good rates while it cleans up. It is expected to go to sales next day. Definitive rates are not yet known, but early signs are encouraging.
Annual report for the year to 30 June 2010. The visible text lists holdings, including Joann #1 at 33.68%, and describes the Australian shale and US strategy. Financial figures are not in the excerpt supplied. Repeats the report already noted on 30 September.
The Heintschel #1 frac moves up a month to 26 October 2010, from the 26 November date given earlier. The well is already tied to sales, so any extra flow can be sold immediately. Cash is about $6.0m.
NSE says the Colorado County joint venture will drill two Wilcox wells by end 2010, starting with an exploration well from early November. The Heintschel #1 frac slips to on or before 26 November. Joann #1 is expected to reach sales by end 2010.
Annual report for the year to 30 June 2010. The visible text lists the asset holdings, including Joann #1 at 33.68%, and describes the shale and US strategy. Financial figures are not in the excerpt supplied.
NSE awarded a contract for over 13,000 line km of aerial gravity data across its Goldwyer shale acreage, taking about 10 weeks and due by end 2010. It meets the revised permit commitments and will guide 2011-12 drilling. Earlier plans said 6,000 km.
Notice of an audio interview with the Managing Director on the US project, Australian shale and the $6.5m raising. Says cash will be about $7m after the raising completes. No new results.
Administrative notice: 41.6m shares and about 14m unlisted options come out of escrow on 8 August 2010. This means they can be freely sold; it is not a new issue.
Letter to shareholders explaining the $6.5m raising and the share purchase plan of up to $15,000 each at the placement price. It repeats the shale gas and US strategy. Directors intend to join the second tranche, subject to approval.
NSE issued tranche one of its placement: 13.7m shares at 14.5c, raising $2.0m. The remaining 17.3m shares ($2.5m) await shareholder approval at a 6 September meeting. Includes the standard notice allowing the new shares to be resold.
What it means for a shareholder
13.7m new shares at A$0.145 to raise about A$2.0m. That's 12% dilution: every existing holder's slice gets 12% smaller. If you held A$1,000 of shares (6,897 at the issue price), your slice goes from 0.0068% to 0.00599% of the company. To keep it you'd need 931 more shares - about A$135 at the issue price.
Operator AKG estimates Heintschel contingent recoverable resources of 59 Bcf gas and 1.1m barrels condensate (mid case; range 25.6-88 Bcf). NSE says this could mean over A$100m net revenue, undiscounted, if developed. Frac likely September; more drilling expected from October.
22 July 2010capital raising announcement▲ GoodMajor
NSE is raising $6.5m: a $4.5m placement of 31.0m shares at 14.5c, plus a $2.0m share purchase plan underwritten by Euroz. Funds go to Australian shale exploration, US drilling and working capital. Tranche two ($2.5m) needs shareholder approval. This addresses the thin cash position.
What it means for a shareholder
31.0m new shares at A$0.145 to raise about A$4.5m. That's 23% dilution: every existing holder's slice gets 23% smaller. If you held A$1,000 of shares (6,897 at the issue price), your slice goes from 0.0068% to 0.00521% of the company. To keep it you'd need 2,108 more shares - about A$306 at the issue price.
Burleson reports Joann #1 flowed 2.1 mmcfd of gas plus about 38 barrels a day of condensate from one of four zones. It calls this a discovery and says its own interest rose to 39.4%. Repeats NSE's news.
Joann #1 flowed 2.1 mmcfd of gas plus about 38 barrels a day of condensate from one 3 ft zone, confirming a discovery: the third success in four Colorado County wells. Three other zones are untested. NSE's interest is 33.68%.
Heintschel #1 is tied into the gas sales pipeline and flows until shut in for fraccing, which awaits a frac unit. Joann #1 flow testing has just begun, and Moeller #1 needs further testing. Brasher #1 revenue has been banked. NSE's Joann interest is now 33.68%.
Burleson reports Heintschel #1 is tied into the gas sales pipeline awaiting fraccing, Joann #1 flow testing has started, and Brasher #1 has banked its first revenue. Burleson says its Joann interest rose to 39.4% from 38%, which may affect NSE's 32.5% (an inference, not stated).
July 2010 corporate presentation repeating known facts: Goldwyer shale acreage of 48,000 km2, 40-480 Tcf estimates, Merlinleigh, and US projects. It shows cash of about $1.0m at 7 July, 143.0m shares, market cap about $26m, and the Buru stake worth about $6.7m.
Heintschel #1 flowed gas at 1.0-1.4 mmcfd from a 4 ft zone below the 225 ft gas column, without fraccing. The main 225 ft sands are still untested. NSE sees a larger structure than mapped; it holds 32.5%. Cash about $1.5m.