Stockle - the stock oracle

Key Petroleum Ltd

ASX:KEY
A$0.080Close 7 Oct 2026 · delayed

Past year: ▼ 19%(5.10c – 10.0c AUD)

Market cap
A$3.1m
Shares on issue
38.9m
In-ground value
A$1.12bn
Risked multiple
under review
Story beats
172 since 2007
Last event
1 May 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

7 Nov 2012drilling progress report● Neutral

Buru's operations update (Buru is Key's Canning partner) restates that Cyrene-1 targets about 5m barrels of conventional oil plus Goldwyer shale, with DCA Rig 7 secured. Key's subsidiary operates the well; Key's interest falls to 20% after farm-in. Mostly Buru's own Ungani and seismic news.

Value this in the calculator →Discuss in chat

29 Oct 2012drilling scheduled▲ Good

Key has secured DCA Rig 7 for Cyrene-1, awaiting final regulator approval. Site works are complete. Targets up to 5m barrels of recoverable oil; coring the Goldwyer shale first, then testing the Willara Formation.

Value this in the calculator →Discuss in chat

30 Aug 2012farm in farm out agreement● Neutral

Empire farms out 15% of EP437 to Caracal Exploration, which pays 30% of Waugh-1 drilling costs. Empire falls to 35%; Key's 50% is unchanged per the announcement. Empire estimates 3m barrels potential at a 700m depth.

Value this in the calculator →Discuss in chat

17 Aug 2012drilling scheduled▲ GoodMajor

Key and Empire, 50% each in EP437, plan to drill Waugh-1 in late 2012 to early 2013, targeting 4-5m barrels of oil plus shale gas. The regulator varied the permit commitment from seismic to one well. Key claims oil pay was missed at Dunnart-1.

Value this in the calculator →Discuss in chat

9 July 2012drilling scheduled● Neutral

Empire Oil & Gas announces planned shallow oil drilling in North Perth Basin permits EP 432, EP 454 and EP 437, naming Key as a party. The excerpt highlights Black Arrow-1 in EP 432 (10m barrel potential). Key's own stake is not shown here.

Value this in the calculator →Discuss in chat

6 Oct 2011drilling result▼ BadMajor

Nyuni-2 suspended after reaching 3,450m, when the drill assembly jammed in the sidetrack. Gas indications were seen in Neocomian and shallower sands, and re-entry remains possible. Key, at 5%, was free carried.

Value this in the calculator →Discuss in chat

6 Oct 2011drilling result▼ BadMajor

Partner Bounty reports Nyuni-2 suspended after drilling to 3,450m, with the mud motor and bit stuck in the sidetrack. Gas indications were seen in Neocomian and shallower sands; the well can be re-entered later.

Value this in the calculator →Discuss in chat

19 Sept 2011drilling progress report● Neutral

Partner Bounty repeats the Nyuni-2 junk problem and planned sidetrack from about 3,000m. It also says a firm order has been placed for line pipe to connect Kiliwani North-1 gas well. Duplicates Key's update.

Value this in the calculator →Discuss in chat

16 Sept 2011drilling progress report▼ Bad

Nyuni-2 drilling stopped on 14 September by rubber debris from a broken logging tool. The operator will pull back to about 3,000m and sidetrack around the blockage. Key holds 5%, free carried.

Value this in the calculator →Discuss in chat

26 Aug 2011drilling progress report● Neutral

Nyuni-2 has reached 2,945m with casing being run, after a few days' rig shutdown for damaged equipment. Planned depth is 3,325m. Key holds 5% and is free carried through drilling.

Value this in the calculator →Discuss in chat

26 Aug 2011drilling progress report● Neutral

Partner Bounty reports Nyuni-2 drilled to 2,945m with casing being run, after several days lost to damaged rig equipment. Planned depth is 3,325m. Key holds 5%. Duplicates Key's own update.

Value this in the calculator →Discuss in chat

17 June 2011drilling spud● NeutralMajor

Nyuni-2 spudded on 17 June in Tanzania, targeting Neocomian sandstones and the gas-bearing Aptian/Albian sands logged in Nyuni-1. Planned measured depth is 3,325m, taking 9-10 weeks. Key holds 5% after the farm-out; Zeta deal still pending.

Value this in the calculator →Discuss in chat

17 June 2011drilling spud● Neutral

Partner Bounty Oil & Gas announced that Nyuni 2 was due to spud on 17 June. It repeats the drilling plan: about 3,325m measured depth, 9-10 weeks. Key holds 5%. Duplicates Key's own announcement.

Value this in the calculator →Discuss in chat

25 Feb 2011farm in farm out completion● NeutralMajor

Tanzania's energy ministry approved Aminex's acquisition of 15% of the Nyuni PSA from Key, the only condition. Key is now at 5%, with Aminex at 65%. This completes the farm-out announced on 4 February.

Value this in the calculator →Discuss in chat

7 Feb 2011drilling result▼ BadMajor

Dibblers #1 reached about 525m and logs showed the reservoir is water wet, so it will be plugged and abandoned. This is the second dry well in EP 437 after Dunnart. Key has now earned its 45% interest by funding the two wells.

Value this in the calculator →Discuss in chat

4 Feb 2011farm in farm out agreement● NeutralMajor

Key signed a binding agreement to cut its Nyuni (Tanzania) interest from 20% to 5%, with Aminex taking 15% by paying 20% of Nyuni-2's dry hole cost. Key says it is refocusing on UK production, Perth Basin and European opportunities. Needs Tanzanian approval; this advances the earlier divestment plan.

Value this in the calculator →Discuss in chat

31 Jan 2011drilling progress report● Neutral

Dibblers #1 had cased its upper section at about 260m on 31 January and was preparing to drill ahead to a planned final depth of 550m, then run logs. Routine progress, no result.

Value this in the calculator →Discuss in chat

24 Jan 2011drilling spud● NeutralMajor

Dibbler #1, the second and final EP 437 well, has spudded after the rig moved from Dunnart. It targets the Bookara Sandstone at about 530m total depth. Key is earning 45% in the permit.

Value this in the calculator →Discuss in chat

14 Jan 2011drilling result▼ BadMajor

Dunnart #1 reached 669m and found oil shows in up to 80% of the Bookara Sandstone, but logs indicate the reservoir is tight, so it will be plugged and abandoned. The joint venture will still drill Dibbler-1.

Value this in the calculator →Discuss in chat

17 Dec 2010drilling progress report▼ BadMajor

Drilling at Dunnart #1 is suspended after casing was cemented, because the rig contractor has resourcing limits the joint venture says could compromise performance and safety. Drilling is expected to resume in the first week of January 2011.

Value this in the calculator →Discuss in chat

14 Dec 2010drilling progress report● Neutral

Dunnart #1 was drilling at about 239m on 14 December, heading to a section depth of about 270m before running casing. Routine progress, no result.

Value this in the calculator →Discuss in chat