Stockle - the stock oracle

Horizon Oil Ltd

ASX:HZN
A$0.215Close 7 Oct 2026 · delayed

Past year: ▲ 5%(19.5c – 28.0c AUD)

Market cap
A$340m
Shares on issue
1.58bn
In-ground value
A$202m
Risked multiple
0.24×
Story beats
214 since 2006
Last event
27 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

4 Mar 2008drilling progress report● Neutral

Operator reports Wei 6-12E-1A drilled to 1,970 m and drilling ahead, total depth expected by end of week. The rest concerns ROC's other wells. No result yet.

Value this in the calculator →Discuss in chat

28 Feb 2008farm in farm out agreement▲ GoodMajor

Horizon signed a farm-in with Pearl Energy (Aabar subsidiary) for 20% of three more Gulf of Thailand blocks, G1/48, G3/48 and G6/48, by paying 40% of the initial three-year seismic and drilling costs. Pearl stays operator; subject to Thai approval. Extends the existing Pearl relationship.

Value this in the calculator →Discuss in chat

27 Feb 2008security holder rights change▲ GoodMajor

Oasis Energy Investments and Ward Ferry funds committed to exercise 10.5m options (about 26% of those outstanding) at A$0.35 before 28 February expiry, for a fee of A$0.01 per option. Shares closed at A$0.32. Well result will not be known before expiry.

Discuss in chat

27 Feb 2008drilling progress report● Neutral

Operator reports Wei 6-12E-1A has run and cemented casing at 986 m, preparing blowout preventer tests; total depth expected early March. Routine progress, no result.

Value this in the calculator →Discuss in chat

27 Feb 2008drilling progress report● Neutral

Partner FAR repeats the operator's update that Wei 6-12E-1A has casing set at 986 m; the rest covers FAR's own Louisiana well. Nothing new for Horizon.

Value this in the calculator →Discuss in chat

25 Feb 2008drilling progress report▼ Bad

Wei 6-12E-1A is at 986 m after the stuck-pipe restart. Horizon says results are highly unlikely before the listed options expire on 28 February, so option holders will have to decide without the well result.

Value this in the calculator →Discuss in chat

22 Feb 2008half year report▼ Bad

Half-year to 31 December 2007: net loss US$2.07m, up 87%, revenue US$522k. Exploration and new business costs rose; the A$14.7m placement funds an expanded nine-well programme. Maari 64.7% complete at end January, first oil mid-August 2008.

Discuss in chat

20 Feb 2008drilling progress report▼ Bad

Operator reports Wei 6-12E was re-spudded as Wei 6-12E-1A, two metres from the original hole, because of stuck drill pipe. Now at 253 m with total depth expected early March, later than first planned.

Value this in the calculator →Discuss in chat

20 Feb 2008drilling progress report● Neutral

Partner FAR repeats the operator's report of the Wei 6-12E-1A re-spud after stuck pipe; the rest concerns FAR's own Louisiana well. Nothing new for Horizon.

Value this in the calculator →Discuss in chat

13 Feb 2008drilling spud● Neutral

Horizon confirms Wei 6-12E-1 spudded 12 February, 1.7 km east of the Wei 6-12S oil discovery, after a weather delay moving the rig. Total depth of 2,520 m was expected around 22 February. Second well of the programme after the dry first well.

Value this in the calculator →Discuss in chat

13 Feb 2008drilling spud● Neutral

Operator ROC reports Wei 6-12E-1 started drilling 12 February in Block 22/12 (Horizon 30%), targeting about 2,520 m by end February. Second well of the programme after the dry Wei 6-12W-1. Also covers ROC's non-Horizon wells.

Value this in the calculator →Discuss in chat

31 Jan 2008security holder rights change● Neutral

Required notice to option holders: listed options (A$0.35) expire 28 February 2008. Shares closed at A$0.295 on 29 January, below the exercise price. Exercise is not underwritten.

Discuss in chat

29 Jan 2008drilling result▼ BadMajor

Wei 6-12W-1 dry hole: drilled to 2,333 m, oil shows were not commercial and the well is being plugged. The rig moves to Wei 6-12E-1, which is independent of this result. First failure of the four-well programme on Block 22/12 (Horizon 30%).

Value this in the calculator →Discuss in chat

29 Jan 2008drilling result▼ Bad

Operator ROC confirms Wei 6-12W-1 found no hydrocarbons and is abandoned; the rig moves to Wei 6-12E-1. Horizon's own release described oil shows as non-commercial. Duplicates Horizon's news.

Value this in the calculator →Discuss in chat

22 Jan 2008capital raising announcement● Neutral

FIRB approval received, so the remaining 10.4 million shares of the December 2007 placement (44 million at A$0.335) were issued. Completes the placement.

Discuss in chat

2 Jan 2008drilling spud● NeutralMajor

Horizon confirms the Wei 6-12W-1 well started 1 January 2008, about two weeks late, the first of four Block 22/12 wells (30%). Target depth about 2,425 m; drilling at 560 m. 2P reserves already identified are quoted as 50-60 million barrels.

Value this in the calculator →Discuss in chat

2 Jan 2008drilling spud● Neutral

Operator ROC announces Wei 6-12W-1 spudded 1 January 2008 in Block 22/12 (Horizon 30%), about two weeks late after rig equipment faults. Targets about 2,425 m. Programme expected to finish by end of March quarter. Duplicates Horizon's own release.

Value this in the calculator →Discuss in chat