GAS2GRID spent nearly two decades chasing oil in the Philippines and gas permits in France, lost both, and was removed from the ASX in August 2025.

2006-2008: Dry holes and a new start

The record opens with Nuevo Malolos-1, a well in Cebu, Philippines. Logs in January 2006 showed hydrocarbons across about 3,981 feet of sands with high core porosity, but tests of the Toledo interval and a later shallower zone failed to flow hydrocarbons to surface. In March the Managing Director, Gundi Royle, stepped down and Dr David King took over. In May the company placed 5,000,000 shares at 10 cents to raise $500,000.

In June 2007 it farmed into New Zealand's PEP 38260, earning 40% by funding the Kate-1 well, and raised up to $3m at 6 cents a share. In March 2008 it agreed to buy EP 453 in Western Australia's Canning Basin, and vendor Dennis Morton became Managing Director. Kate-1 was abandoned in May 2008 with no significant hydrocarbons. In June the St Griede permit in France was awarded, shared 50/50 with Gippsland Offshore Petroleum.

2008-2010: Thin funding and a failed merger

Cash had fallen to $0.4m by September 2008. A 1-for-1 rights issue at 3 cents aimed for about $3.465m but drew only a 33.4% take-up and almost $1.3m. The company withdrew from the New Zealand permit, and in July 2009 placed 21.3m shares at 5 cents for $1,065,750.

In November 2009 it signed a merger agreement with Orion Petroleum and Gas2Grid. Gas2Grid shareholders approved it in February 2010 with 92.62% of votes cast, but after challenges to the expert reports and a rival bid from Octanex, the agreement was terminated in March with no break fees. Gas2Grid then placed 52m shares at 2.5 cents to raise $1.3m. A Malolos-1 workover confirmed natural gas but no sustained flow.

2010-2014: Malolos-1 and the dry wildcats

A 1-for-3 rights issue at 2.5 cents, underwritten by Morton's company Budside, was completed in full in late 2010 after Budside took the shortfall. In December 2010 Darren Reeder, holding 14.96%, joined the board. In August 2011 the company bought Flow Energy's 50% of St Griede for $900,000, taking it to 100%. Over 20 barrels of oil flowed from Malolos-1 in November 2011, but junk left in the well in 1960 blocked the main target.

In 2012 the company raised money in placements at 4 cents and 6.5 cents, and bought two rigs. Its first two SC44 wildcat wells failed: Jacob-1 (up to 50 million barrels targeted) in November 2012, and Gumamela-1 in January 2013. The third, Ilang-1, was deferred, and drilling costs were written off. By February 2013 there was a working capital deficit and a going concern warning, and a $1.25m facility from a Morton-controlled company was largely drawn.

Malolos-1 then produced oil in 2013 testing. A first contingent resource of 12 million barrels best estimate was announced in June, lifted to 20.4 million in January 2014, and the Philippine energy department recognised an oil discovery. Money came from a 3 cent share purchase plan and a placement at 2.2 cents. A 1-for-4 rights issue launched in April 2014 was withdrawn in June because of low acceptances. Extended testing sustained 33 barrels a day and briefly about 200, but fines kept blocking the perforations. A two-year moratorium on SC 44 was approved in December 2014.

2015-2019: The French fight

In October 2015 the company was told France would not renew St Griede. It won in court: a suspension in December 2015, a Conseil d'Etat refusal to admit the Minister's appeal in 2016, and a Pau tribunal order for a 5-year extension in November 2016. France appealed in January 2017, and the SC44 moratorium expired without extra time. In November 2017 the company said it would seek new assets, likely overseas. A December 2017 decree extended St Griede only to May 2018 over a smaller area, and in March 2018 France rejected all three other Aquitaine applications. Small raisings of $250,000 each followed at 0.25 cents, the first equity raising since 2013. France paid €414,400 (about A$662,000) in penalties in 2018, and the DOE extended SC 44 to September 2020.

In March 2019 the Bordeaux appeal court annulled the 5-year extension order, and in April the company renounced its St Griede rights and later lodged a €34.6m damages claim. A 1-for-2 offer at 0.3 cent aimed for about $1.717m but drew only 112.8m of 572.2m shares by July. Deepening of Nuevo Malolos-1 began in September 2019, but in December a dropped pry bar wedged the drilling assembly and the well was suspended.

2020-2023: Permit lost, Australian attempts fail

The record for 2020 is quiet apart from a November address saying the company was reviewing Australian oil and gas acquisitions and restructuring balance sheet debts owed to directors. Early 2021 placements raised $2.542m. An underwritten 1-for-1 offer at 0.3 cent followed, in which the directors' entities took up almost all the shares, about $5.97m, and the proceeds repaid their loans. Shares on issue rose to about 4.06 billion. In June 2021 the DOE terminated SC 44, and in September rejected reconsideration. France also won an annulment of the 2018 judgment behind the penalties already paid, and the Conseil d'Etat declined the company's appeal in 2022.

Australian farm-ins failed: Armour Energy's Surat Basin proposal ended in March 2022, and a Santos Cooper Basin term sheet ended in September 2022 because the work commitments could not be met in time. In March 2023 ASX found the company's operations inadequate, and suspended its shares on 1 September 2023. In November 2023 the Pau Tribunal awarded only €60,342.25 plus interest against the €34.35m claim.

2024-2025: Suspension and removal

A new Cebu application covering about 127,475 hectares was declared complete in September 2024, though award still needed a Notice of Qualification and the President's signature. By July 2025 the company said it was close to farm-ins of 50% and 60% in two Philippine contracts, and planned to hold them in subsidiary Max-E Limited, with no guarantee. A French appeal at Bordeaux was awaiting determination. The company said it had a going concern uncertainty, with a March 2025 quarter operating outflow of $55K. On 28 August 2025 it was removed from the ASX official list for unpaid annual listing fees, with about 4,089m shares on issue. The Cebu contract, farm-ins and French appeal were all unresolved.

Written from the 104 story beats below (2006 to 29 Aug 2025), which come from the company's own announcements and filings.

Beat by beat

The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.

shares on issue market cap (log scale)

20254.09bn shares · A$4.1m market cap

  1. 29 Aug

    GGX was removed from the ASX official list from the close of trading on 28 August 2025 for not paying annual listing fees. The shares had been suspended since 1 September 2023; the Cebu contract, farm-ins and French appeal remain unresolved in the record.

    registration revoked

    4.09bn shA$4.1m
  2. 31 July

    June quarter: GGX says it is close to farm-ins of 50% and 60% in two Philippine contracts, and the Cebu contract still awaits signature. It says reinstatement before 1 September 2025 is unlikely, so delisting looms. Plan: hold the interests in subsidiary Max-E Limited, seek a separate ASX listing, and possibly distribute shares to shareholders, subject to approval.

    quarterly activities report

    4.09bn shA$4.1m

20244.09bn shares · A$4.1m market cap

  1. 29 Oct

    September quarter: the DOE finished evaluating the Cebu application and will issue a Notice of Qualification with contract copies for execution, then the President must sign, timing uncertain. GGX is finalising terms for one Philippine farm-in. French appeal and suspension continue.

    quarterly activities report

    4.09bn shA$4.1m
  2. 30 Sept

    No challenge was made to GGX's Cebu application, and the DOE declared it complete on 27 September 2024. It covers about 127,475 hectares, larger than SC44. Award hoped for by end of December 2024; GGX will talk to ASX about reinstatement.

    regulatory community update

    4.09bn shA$4.1m

20234.08bn shares · A$4.1m market cap

  1. 21 Nov

    The Pau Tribunal awarded GGX only €60,342.25 plus interest and €1,500 costs against its €34.35m St Griede claim; the rest was dismissed. This resolves the long-awaited hearing, a near-total loss. Lawyers see grounds for appeal, with a decision pending.

    drilling result

    4.08bn shA$4.1m
  2. 1 Sept

    ASX suspends GGX securities from close of trading on 1 September 2023, finding operations inadequate under Listing Rule 12.1. This is the outcome of the March 2023 notice. The suspension lasts until the company shows compliance.

    listing compliance notice

    4.08bn shA$4.1m
  3. 28 Aug

    ASX has refused the company's request to extend the 1 September 2023 deadline to 31 December 2023, so suspension from quotation is expected. The company will seek reinstatement once the new Philippine contract is granted, which it expects may take 3 to 4 months.

    listing compliance notice

    4.08bn shA$8.2m
  4. 28 Apr

    March quarter: company says negotiations with the Philippine DOE concluded satisfactorily and it is finalising documents for a new Service Contract. The ICC action is suspended. It has paused eastern Australia searches, citing the $12/GJ gas price cap. French hearing date still not advised.

    quarterly activities report

    4.08bn shA$8.2m
  5. 9 Mar

    ASX has ruled that Gas2Grid's level of operations does not satisfy Listing Rule 12.1. The company has until 1 September 2023 to show compliance, or ASX intends to suspend its shares from quotation. The company points to a possible restart in SC 44.

    listing compliance notice

    4.08bn shA$8.2m

20224.06bn shares · A$10.1m market cap

  1. 21 Sept

    Gas2Grid and Santos agreed to terminate the proposed Cooper Basin farm-in because the work commitments cannot be met within the licence time frames. The company is seeking other Cooper Basin farm-ins, leaving it with no Australian project.

    material agreement termination

    4.06bn shA$10.1m
  2. 6 Sept

    The Conseil d'Etat declined to admit the company's appeal over the annulled €383,500 penalties, which had been paid in 2018. This ends that appeal; lawyers are advising on further steps. The €34.35m claim still awaits a hearing date.

    regulatory community update

    4.06bn shA$10.1m
  3. 6 Apr

    Binding term sheet with Santos to acquire 60% of Cooper Basin licences ATP 1063 and ATP 1174 by funding 100km of 2D seismic and one well (about $3m). Replaces the lapsed Armour deal; equity raising will be needed and work programs need government amendment by 1 Oct 2022.

    farm in farm out agreement

    4.06bn shA$12.2m
  4. 30 Mar

    Gas2Grid and Armour have ended attempts to finalise binding agreements for the Surat Basin farm-in proposed in November 2021. The company keeps looking for onshore eastern Australian assets. This ends its only announced Australian project, despite January's 'nearly finalised' statement.

    material agreement termination

    4.06bn shA$8.1m

20211.64bn shares · A$5.7m market cap

  1. 22 Nov

    Non-binding heads of agreement with Armour Energy to earn 50% of the Riverside and Myall-Bainbilla blocks in Queensland's Surat Basin by funding seismic and three wells, over $12m in total. Drilling is targeted for early 2022. It gives the company its first Australian project since the Philippine termination.

    farm in farm out agreement

    1.64bn shA$5.7m
  2. 28 Sept

    The DOE rejected the company's reconsideration request and reiterated termination of SC 44. The company calls this wrongful and is studying legal remedies. This confirms the loss of the Philippine permit unless a challenge succeeds.

    regulatory community update

    1.64bn shA$3.3m
  3. 5 July

    The entitlement offer closed with eligible shareholders taking only 52.9m of 2,044.6m shares ($158,805). The directors' entities took up the 1,991.6m-share shortfall ($5.97m). Shares issue on 7 July 2021.

    capital raising announcement

    1.64bn shA$3.3m
  4. 2 June

    The Philippine DOE has terminated Service Contract 44, rejecting the company's March 2020 force majeure claim, with no explanation given. The company will seek reconsideration. This is a major blow to its only drilling project in the Philippines, the Malolos field.

    regulatory community update

    1.64bn shA$4.9m
  5. 19 May

    The company relaunched a fully underwritten 1-for-1 entitlement offer at $0.003 to raise about $6.13m. Directors Morton, Sam Yue and Munns underwrite $1.81m, $2.07m and $2.25m, and proceeds repay their loans, cutting company liabilities. Closes 1 July 2021.

    capital raising announcement

    1.64bn shA$6.5m
  6. 30 Apr

    March quarter: SC 44 stays suspended with no DOE response, and no hearing date is set for the France claim. The company raised $2.542m in placements, 399m shares at $0.0037 (26 Feb) and 266.5m at $0.004 (24 Mar), for new ventures and working capital.

    quarterly activities report

    1.64bn shA$6.5m
  7. 16 Feb

    The French Government lodged a defence on 15 February against the €34.35m claim. Separately, Bordeaux's appeal court annulled the 2018 judgment behind the €383,500 penalties already paid to the company; it will seek redress, possibly via the Conseil d'Etat. This is a setback.

    regulatory community update

    1.64bn shA$6.5m

20201.64bn shares · A$3.4m market cap

  1. 27 Nov

    AGM address: the company says frustration with the Philippines and France, plus Australian opportunities, means it is now reviewing Australian oil and gas acquisitions. It is also looking at restructuring a balance sheet with large amounts owed to directors. This marks a shift away from Philippine focus.

    agm notice

    1.64bn shA$3.4m

20191.64bn shares · A$6.5m market cap

  1. 9 Dec

    Nuevo Malolos-1 hit trouble: a dropped pry bar wedged the drilling assembly at 837m depth after the well was cleaned out to 1,913.7m. Attempts to free it failed, the well is suspended over the holidays, and equipment may need importing. This delays the deepening.

    drilling progress report

    1.64bn shA$6.5m
  2. 25 Sept

    The company instructed French lawyers to lodge a €34.6m (about A$55m) damages claim in the French tribunal over the St Griede non-renewal, as the Ministers did not respond in two months. The company says it has a good chance of success, but the outcome is unknown.

    regulatory community update

    1.64bn shA$3.4m
  3. 9 Sept

    Site operations for the Nuevo Malolos-1 deepening began on 9 September 2019, meeting the DOE's end-September start deadline. Rig-2 will be moved about 20m, then the well deepened from 1,941.5m to a proposed 2,250m TVD to test two known oil sandstones.

    drilling spud

    1.64bn shA$3.4m
  4. 31 July

    Entitlement offer closed with applications for only 112.8m of 572.2m shares (about $338.5k of $1.717m). The 459.4m-share shortfall ($1.378m) is to be placed with investors within 3 months. Funding for the well remains dependent on that placement.

    capital raising announcement

    1.64bn shA$4.9m
  5. 8 July

    The DOE granted until end of September 2019 to start deepening Nuevo Malolos-1, easing the SC 44 termination risk. The company urges eligible shareholders to apply for the offer, which closes 26 July.

    regulatory community update

    1.64bn shA$3.4m
  6. 17 June

    The Philippine DOE denied the force majeure request to delay Nuevo Malolos-1 drilling, requiring drilling by 3 July 2019 or risk SC 44 termination. The company will challenge the decision; the DOE decision now affects the capital raising.

    regulatory community update

    1.64bn shA$4.9m
  7. 10 May

    Entitlement offer closing pushed from 27 May to 28 June 2019 as drilling is deferred to July because of Philippine elections. The company discloses SC 44 depends on finishing the well by July 2019, and the DOE could terminate it if it refuses more time.

    capital raising announcement

    1.64bn shA$4.9m
  8. 29 Apr

    Launches a 1-for-2 non-renounceable entitlement offer at $0.003 per share to raise about $1.717m, a 25% discount to the last sale price. Not underwritten. Funds go to deepening Nuevo Malolos-1, meeting the SC 44 commitment; this is the equity raising flagged earlier.

    capital raising announcement

    1.64bn shA$6.5m
  9. 24 Apr

    March quarter: the company told French Ministers on 23 April 2019 it renounces its St Griede renewal rights, citing sovereign risk, ending that long fight. Nuevo Malolos-1 deepening is now planned for May and new capital is needed.

    quarterly activities report

    1.06bn shA$4.3m
  10. 6 Mar

    Bordeaux Court of Appeal annulled the Pau order granting a 5-year St Griede extension, but told the Ministers to reconsider a second 5-year term within 2 months, with €1,000/day penalty for delay. This partly resolves the appeal, with the permit outcome still open.

    regulatory community update

    1.06bn shA$4.3m

20181.06bn shares · A$4.3m market cap

  1. 23 Oct

    The Philippine DOE approved extending SC 44 to September 2020, ending the long wait for a decision and giving security of tenure. The company plans to deepen Nuevo Malolos-1 using its own rig, funded from existing funds and new funding initiatives.

    regulatory community update

    1.06bn shA$4.3m
  2. 30 Aug

    The French Government has paid €414,400 (about A$662,000): the €383,500 St Griede penalty plus €1,200 costs, and €29,700 for Mirande. This resolves the penalty thread and adds cash; the Bordeaux appeal on the permit remains pending.

    regulatory community update

    1.06bn shA$3.2m
  3. 11 July

    The Pau Tribunal directed the French Government to pay Gas2Grid €383,500 plus €1,200 costs for the St Griede delay penalty, with no appeal available. This resolves the penalty claim; the Bordeaux appeal on the permit itself is still pending, with submissions closing 14 September 2018.

    regulatory community update

    1.06bn shA$3.2m
  4. 6 Mar

    The company placed a further 100 million shares at $0.0025 to raise $250,000 for working capital, at the same price as the SPP. It was made under shareholder approval from the 9 February 2018 meeting.

    capital raising announcement

    1.06bn shA$3.2m
  5. 6 Mar

    France rejected the Eauze application (3,172 km2) under the new law. All three Aquitaine Basin applications, lodged 2010–2011, have now been rejected; the company has 2 months to object.

    regulatory community update

    1.06bn shA$3.2m
  6. 2 Mar

    France rejected the Mirande application (3,642 km2) under the new law, after the July 2017 court had ordered the Minister to decide. The company has 2 months to object and will seek legal advice.

    regulatory community update

    865m shA$2.6m
  7. 2 Mar

    The SPP closed early, fully subscribed at $0.0025 per share, raising the $250,000 target without scale back. All three directors applied for their maximum $15,000 each.

    capital raising announcement

    865m shA$2.6m
  8. 1 Mar

    France rejected the Tartas permit application (2,821 km2, lodged 2010) under the new December 2017 law, despite officials having recommended grant in 2015. The company has 2 months to object in the Tribunal.

    regulatory community update

    865m shA$2.6m
  9. 12 Feb

    The company announced a Share Purchase Plan of up to 100 million shares at $0.0025 to raise up to $250,000, a 16.6% discount to the five-day VWAP. Funds are for new ventures and working capital. This is the first equity raising since 2013.

    capital raising announcement

    865m shA$3.5m
  10. 8 Jan

    A French decree of 8 December 2017 extended St Griede only to 31 May 2018, over a reduced 652 km2 area with a €1,176,860 minimum work commitment. The company says this does not satisfy the Pau judgement's 5-year extension; the Bordeaux appeal is still pending.

    regulatory community update

    865m shA$2.6m

2017859m shares · A$2.6m market cap

  1. 29 Nov

    AGM presentation says SC44 is in limbo, with the DOE decision awaited for over 12 months, and France is shutting down petroleum exploration. The forward program is to acquire new petroleum assets, likely overseas. This signals a shift in focus.

    investor presentation

    859m shA$2.6m
  2. 31 Jan

    The SC44 moratorium expired 27 January 2017. The DOE denied more time, so the company applied for force majeure; rejection would end SC44 tenure. France appealed the St Griede judgement on 3 January 2017, reopening the earlier court win.

    quarterly activities report

    851m shA$5.0m

2016851m shares · A$2.6m market cap

  1. 7 Nov

    The Pau tribunal annulled the Ministers' September 2015 refusal and ordered a 5-year St Griede extension from 3 November 2016 within 30 days, with a €3,000 daily penalty for delay. This resolves the challenge in the company's favour, though the parties have 2 months to appeal.

    regulatory community update

    851m shA$2.6m
  2. 22 Aug

    The Conseil d'Etat refused to admit the Minister's appeal against the December 2015 suspension ruling, saying no argument was presented to justify admission. The suspension stands, which the company says strengthens its legal rights over St Griede; no renewal has yet been granted.

    regulatory community update

    851m shA$2.6m

2015846m shares · A$2.5m market cap

  1. 30 Dec

    A French tribunal judge suspended the Ministers' refusal to renew St Griede on 29 Dec 2015, finding an error in law and no public-order risk from the permit itself. Ministers have 2 months to reconsider and 2 weeks to appeal. This is a first win in the challenge.

    regulatory community update

    846m shA$2.5m
  2. 12 Oct

    Directors were told verbally in Paris that France will not renew the St Griede licence, apparently over local political and public-order concerns. This ends hope of the renewal pending since 2013. The company is seeking advice; Tartas is recommended for grant.

    regulatory community update

    745m shA$2.2m

2014745m shares · A$8.2m market cap

  1. 12 Dec

    The DOE approved the two-year technical moratorium on SC 44, running 28 January 2015 to 28 January 2017. This resolves the application and gives security of tenure to prove commerciality and win a 25-year production term. It may also help the farm-out search.

    regulatory community update

    745m shA$8.2m
  2. 31 July

    June quarter report: the Malolos-1 test sustained 33 bopd and briefly about 200 bopd, with perforations repeatedly blocked by fines. Sufficient data gathered for a DOE application lodged in July. The rights issue was withdrawn on 12 June due to low acceptances, with the share price below the 3 cent issue price.

    quarterly activities report

    724m shA$13.8m
  3. 8 July

    Both Malolos sandstones were tested separately and are oil-bearing. The lower one made over 100 bopd with more water, and fines limit rates. Malolos-1 is suspended while the company applies to the DOE for more time. Seismic is planned and a farminee is sought.

    well test result

    724m shA$10.1m
  4. 2 Apr

    Launches a 1-for-4 non-renounceable rights issue at 3 cents to raise about $5.1m, with a free $0.04 option (expiring 15 September 2015) per share. Not underwritten. Funds go to Philippines appraisal, French exploration and working capital. Shares would reach about 927m.

    capital raising announcement

    724m shA$24.7m
  5. 20 Mar

    The Philippine energy department gave written approval to start the Malolos-1 extended oil production test, with initial production likely in April. This clears the approval awaited since January. A 25-year production period depends on proving commerciality.

    regulatory community update

    724m shA$20.3m
  6. 29 Jan

    Independent assessment lifts the Malolos contingent resource (2C) to 20.4 MMbbl oil in place from 12 MMbbl (1C 6.8, 3C 68.1). It also adds a new unrisked prospective resource of 104 MMbbl (14-601) in SC44 leads. Farm-out talks continue; no deal yet.

    resource reserve update

    724m shA$14.5m
  7. 3 Jan

    The Philippine energy department formally recognised Malolos-1 as an oil discovery and extended SC44 for 12 months from 28 January 2014 to prove commerciality. This resolves the October application. Longer testing is planned for February, costing US$0.5-1m, subject to equipment.

    regulatory community update

    724m shA$14.5m

2013710m shares · A$15.6m market cap

  1. 23 Oct

    Company applied to the Philippine energy department to declare Malolos-1 an oil discovery, citing indicative test rates of 100-200 barrels a day. If approved, that gives 12 more months to test. Extended testing is estimated at US$500,000-$1m; farm-out of SC44 is still being discussed.

    regulatory community update

    710m shA$15.6m
  2. 11 Sept

    Placement raised $1,625,460 from 73.88m shares at 2.2 cents, a 20.8% discount to the 15-day average. That is below the 3 cent plan price. Funds go to Malolos-1 flow testing, St Griede and working capital. Company says it is talking to potential farm-in partners.

    capital raising announcement

    587m shA$17.6m
  3. 5 July

    Malolos-1 testing is complete. Both gas zones were tight or water-bearing and will not be pursued. The 4-42 million barrel (12 million best) oil resource stands, and oil is 39°API. Months of production testing are planned from H2 2013. Cash was about $1.7m and shares on issue 647m.

    well test result

    587m shA$18.8m
  4. 28 June

    The Share Purchase Plan and shortfall raised $1,203,600 from 40.12 million shares at 3 cents. A shortfall of 59.88 million shares ($1.8m) is to be placed in coming weeks. Funds go mainly to the Malolos-1 workover.

    capital raising announcement

    587m shA$18.8m
  5. 20 June

    First Malolos oil contingent resource: 12 million barrels best estimate of oil in place, ranging from 4 million to 42 million. It covers the two lower sandstones, and no seismic exists to confirm the trap. It follows the earlier dry wells.

    resource reserve update

    587m shA$15.9m
  6. 18 June

    The upper Malolos-1 sandstone gave 30 barrels of clean oil with no water in 2.5 hours of swabbing before equipment broke off in the hole. Management concludes both oil sandstones can produce. Gas zone testing is next.

    well test result

    587m shA$15.9m
  7. 17 June

    The upper Malolos-1 oil sandstone was perforated, with guns coming out covered in oil. The lower sandstone flowed oil to within 22 m of surface plus unmeasured gas. Management says it is capable of oil production, but a development decision awaits further testing.

    flow test result

    587m shA$15.9m
  8. 8 May

    Share Purchase Plan offered to existing holders at 3 cents a share, up to A$3m (100m shares), with $1,200-$15,000 per holder. The price is a 14.3% discount to the five-day average. Funds go to finishing Malolos-1, St Griede seismic preparation and working capital.

    capital raising announcement

    587m shA$21.1m
  9. 22 Feb

    Half-year accounts report a working capital deficit of $467,084 and a material uncertainty about going concern. Drilling costs on Jacob-1, Gumamela-1 and Ilang-1 were written off. A $1.25m facility from a company controlled by MD Morton was drawn by $1.2m in January 2013. No Jacob-1 discovery is expected.

    half year report

    587m shA$22.9m
  10. 24 Jan

    Ilang-1 (5 million barrels) is deferred because Jacob-1 and Gumamela-1 raise a high risk that the target sandstones are absent. Rig-1 repairs are done, and swapping in Rig-2 at Malolos-1 is being considered. The company is also reviewing offers to hire out its rigs.

    drilling scheduled

    587m shA$41.7m
  11. 8 Jan

    Gumamela-1 was plugged and abandoned at 1,051.6 m, with no significant porosity in the limestone or the sediments below it. It is the second dry result in a row. The Ilang-1 drill decision is now under review, and Rig-2 is on standby.

    drilling result

    587m shA$41.7m

2012587m shares · A$38.8m market cap

  1. 17 Dec

    Gumamela-1, the second of the three SC44 wildcats (15 million barrels recoverable potential), spudded on 16 December 2012 and was at 57.6 m. Drilling is planned to 1,000-1,300 m over about 25 days, following the disappointing Jacob-1.

    drilling spud

    587m shA$38.8m
  2. 26 Nov

    Jacob-1 was stopped at 664.5 m with no reservoir limestone and no hydrocarbon shows, and mud kept being lost in fractures from 519.1 m. Wireline logging follows. The 50 million barrel prospect looks unsuccessful, though the fluid in the fractures is unknown.

    drilling result

    584m shA$52.5m
  3. 24 Oct

    Jacob-1, the first of three back-to-back SC44 wildcats and the largest prospect at up to 50 million barrels, started drilling at 1930 hours EDST on 23 October. It was at 32 m the next day. This follows several months of delays.

    drilling spud

    582m shA$47.2m
  4. 31 Aug

    Raised $2.03m by placing 31.26m shares at $0.065, a 5.8% discount to the 10-day average price. It covers the shortfall after about 34.2m $0.05 options lapsed unexercised on 15 June, which would have raised about $1.71m. Funds go to SC44, St Griede and working capital.

    capital raising announcement

    544m shA$43.5m
  5. 30 Apr

    Company bought an 800 HP drilling rig (in Taiwan) and a Philippines workover rig after citing extensive delays and cost overruns with contractors. Jacob-1 has DOE approval and drilling is targeted for July. Farmout talks continue but are said not to affect timing.

    asset acquisition disposition

    456m shA$21.4m
  6. 23 Mar

    Adds a $700,000 placement of 17.5m shares at $0.04, on top of the $3.1m (77.5m shares at $0.04) committed on 14 March from directors and investors. Funds go to SC44 drilling; shares on issue rise to about 473.6m.

    capital raising announcement

    456m shA$19.1m

2011345m shares · A$19.0m market cap

  1. 15 Nov

    Over 20 barrels of oil plus gas flowed to surface from Malolos-1, but junk left in the well in 1960 blocks the 2,173 m main oil target, and a milling attempt failed. Testing that oil zone is delayed to 2012, using the drilling rig.

    well test result

    345m shA$19.0m
  2. 30 Sept

    29.2m of the 33.2m options were exercised at $0.0496, raising about $1.45m; 4m lapsed. Another 1.39m shares were issued to settle seismic invoices and exercise other options. Shares on issue rise to 375.7m.

    security holder rights change

    345m shA$16.9m
  3. 31 Aug

    Gas2Grid agreed to buy Flow Energy's 50% of the St Griede licence in France for $900,000 cash, taking it to 100%. A new seismic survey is planned for first half 2012 and one well by Q1 2013.

    asset acquisition disposition

    345m shA$19.0m
  4. 6 Apr

    Malolos-1 Phase 2 workover to start within the week, now adding nitrogen stimulation of shallow gas zones. The Philippines DOE granted an 18-month extension to drill the three outstanding SC44 wells, now planned for second half 2011, easing the licence deadline.

    drilling scheduled

    327m shA$24.5m

2010312m shares · A$10.9m market cap

  1. 7 Dec

    Substantial shareholder Darren Reeder joins the board as a non-executive director. He holds 14.96%, is Singapore-based and runs an oil field services business in south Asia, with Philippines workover experience.

    director officer appointment

    312m shA$10.9m
  2. 18 Nov

    The rights issue closed under-subscribed: acceptances for 49.5m of 76.9m shares. The remaining 27.4m shortfall shares go to the underwriter Budside, controlled by MD Morton, so the raising is still completed in full.

    capital raising announcement

    235m shA$5.1m
  3. 5 Oct

    Gas2Grid offers a 1-for-3 non-renounceable rights issue of about 78.35m shares at $0.025 to raise about $1.959m, each with a free $0.05 option expiring 15 June 2012. Fully underwritten by Budside, controlled by MD Dennis Morton. Funds go to exploration and working capital.

    capital raising announcement

    235m shA$6.8m
  4. 30 Apr

    Malolos-1 Phase 1 workover is complete: natural gas is confirmed and several gas-bearing sandstones are identified, including a 23 m gas column, but there was no sustained flow. The well is suspended. Phase 2 slips to Q3 2010, dependent on equipment, funding and approvals. 37 km of seismic acquired so far.

    well test result

    183m shA$6.8m
  5. 25 Mar

    Gas2Grid places 52m shares at $0.025 to raise $1.3m, with a free 52m options (exercise $0.05, expiring 30 Sept 2011) subject to shareholder approval. Half the shares need approval. Funds cover working capital, costs of the cancelled Orion schemes, and Cebu and France exploration.

    capital raising announcement

    183m shA$4.9m
  6. 11 Mar

    The Orion merger agreement is terminated and the merger will not proceed. Orion's expert said it would revise its opinion after updated asset valuations, and the 31 March 2010 end date could not be met. No break fees are payable. The companies say they may work together later.

    material agreement termination

    183m shA$4.9m
  7. 24 Feb

    Gas2Grid shareholders approved the Orion share scheme with 92.62% of votes cast, and optionholders approved the option scheme unanimously. Completion still needs the Orion shareholder meeting on 26 February and Federal Court approval.

    business combination

    183m shA$7.9m
  8. 18 Feb

    Octanex, holding 7.1% of Orion and 3.4% of Gas2Grid, announces a conditional bid for Orion at 1 Octanex share per 6 Orion shares (about 7.25c) and opposes the Gas2Grid merger. It cites Gas2Grid's $969,000 cash at 31 December 2009. This threatens the merger.

    business combination

    183m shA$7.9m
  9. 25 Jan

    Independent experts received letters from a lawyer for undisclosed shareholders of both companies challenging their reports. The Orion and Gas2Grid meetings will be opened then adjourned to 23 and 24 February 2010, delaying the merger vote.

    business combination

    183m shA$6.4m

2009177m shares · A$10.6m market cap

  1. 5 Nov

    Gas2Grid signs a Merger Implementation Agreement with Orion: schemes of arrangement give 1 Orion share per 2.25 Gas2Grid shares, and 1 Orion option per 2.25 options. Unanimously recommended by non-conflicted directors absent a superior offer. Meetings are likely January 2010, subject to due diligence and court approval.

    business combination

    177m shA$10.6m
  2. 15 Oct

    Orion Petroleum and Gas2Grid jointly confirmed preliminary negotiations on a possible change in control, discussed on the basis of 1 Orion share for every 2.25 Gas2Grid shares. Structure and pricing were not settled, and Russell Langusch, formerly a Gas2Grid director, was Orion's listed contact.

    business combination

    177m shA$10.6m
  3. 7 July

    Placement of 21.3m shares at 5 cents raised $1,065,750 from qualified investors, using up the remaining 15% placement capacity. Funds go to the Cebu workovers and seismic, the St Griede gravity survey, EP 453 and new ventures.

    capital raising announcement

    156m shA$10.3m
  4. 29 Apr

    March quarter: the company will withdraw from the NZ PEP 38260 permit, following the dry Kate-1. The Cebu workover completion has slipped to end of Q3 2009. Directors did not place the rights issue shortfall, and salaries and fees are being minimised to preserve cash.

    quarterly activities report

    116m shA$4.0m
  5. 21 Apr

    The Philippine DOE approved the SC44 variation. Workovers on both Cebu wells are due by end June 2009 and 100 km of seismic by December 2009, then one new well by June 2010 and two by December 2010. This resolves the overdue end-2008 well commitment.

    regulatory community update

    116m shA$4.0m
  6. 30 Jan

    December quarter: the rights issue closed with only a 33.4% take-up, 38.6m shares and almost $1.3m raised, against a $3.45m maximum. The Cebu workover target is end of Q1 2009, and the company has asked the Philippine DOE to combine its overdue SC44 commitments.

    quarterly activities report

    116m shA$4.2m

2008116m shares · A$4.5m market cap

  1. 7 Nov

    Prospectus for a 1-for-1 non-renounceable rights issue, with one new share and one new option per share held, closing 8 December 2008. Issue price and amount are not shown in the excerpt. Follows cash falling to $0.4m by September.

    capital raising announcement

    116m shA$4.5m
  2. 7 Nov

    Notice of the 1-for-1 non-renounceable rights issue: about 115.5m new shares at $0.03 to raise about $3.465m, each with a free $0.08 option expiring 30 Nov 2010. Not underwritten; funds go to exploration, issue costs and working capital. Gives the price and size missing earlier.

    capital raising announcement

    116m shA$4.5m
  3. 25 June

    The St Griede exploration permit in France's Aquitaine Basin is awarded, covering 1,238 sq km, split 50/50 with Gippsland Offshore Petroleum. Five-year term, total work commitment $3.7m. This resolves the long-pending French application.

    regulatory community update

    116m shA$6.2m
  4. 19 May

    Kate-1 was drilled to 1,112 m with no significant hydrocarbon indications and was plugged and abandoned. It found about 70 m of high-porosity sandstone and shale showing fluorescence. The company says wider permit prospectivity is not eliminated.

    drilling result

    116m shA$12.1m
  5. 12 May

    Kate-1 began drilling on 8 May 2008 in New Zealand's onshore Canterbury Basin, with surface casing set at 133.5 m and the well at 140 m. The main target is expected within about five days. This is the long-awaited earning well, targeting up to 25 million barrels.

    drilling spud

    116m shA$12.1m
  6. 28 Mar

    Agrees to acquire 100% of EP 453 in the onshore Canning Basin for 6 million new shares plus 3% royalties, subject to Ministerial approval. Vendor Dennis Morton, ex-Eastern Star Gas MD, becomes Managing Director from 31 March 2008; Dr King reverts to non-executive. Adds a fourth asset and a new leader.

    asset acquisition disposition

    116m shA$8.2m
  7. 31 Jan

    December quarter: cash $2.71m. Agrees to buy a further 15% of onshore PEP 38260 for $600,000, lifting its interest to 55% after Kate-1. Land access and rig secured, with spud expected early April 2008. Cebu microbial survey found seepage anomalies; France award still pending.

    quarterly activities report

    110m shA$8.0m

200759.5m shares · A$3.7m market cap

  1. 12 June

    Farms into New Zealand's PEP 38260 (Canterbury Basin), earning 40% of the onshore area by funding the first $1.2m of the Kate-1 well. Also raises up to $3m at 6c a share, 12% below recent VWAP, including a $1.232m share purchase plan. This is the new venture foreshadowed in April.

    farm in farm out agreement

    59.5m shA$3.7m

200633.7m shares · A$3.9m market cap

  1. 22 May

    Flow-back test of the 2,750-2,780 ft interval gave about 5.2 barrels of fluid initially, then only water from swabbing and no hydrocarbons. The company says this does not fit the core and earlier drill stem test results. A third test failing to flow undermines the main remaining hope for the well.

    well test result

    33.7m shA$3.9m
  2. 4 May

    Placed 5,000,000 shares at 10 cents to raise $500,000 of working capital through Montagu Corporate clients. Flow-back test equipment is expected on site in Cebu on 16 May.

    capital raising announcement

    33.7m shA$3.9m
  3. 6 Mar

    Gundi Royle steps down as Managing Director, returning to the UK to run new ventures; Dr David King takes over local management and Philippines operations. A testing unit is contracted for the 2,750-2,800 ft test from mid to late April, and a European licence application is planned.

    director officer appointment

    33.7m shA$4.9m
  4. 31 Jan

    Final report: Nuevo Malolos-1 showed hydrocarbons over more than 2,900 ft and excellent core porosity, but two tests failed to flow hydrocarbons to surface. Upper Maingit (2,750-2,800 ft) will be tested later without a rig; further appraisal and lead work planned.

    drilling result

  5. 30 Jan

    Test of the 6,223-6,243 ft Toledo interval produced no hydrocarbons to surface; only about 2 barrels of oil came back on reverse circulation. The company says the challenge is now finding reservoir engineering solutions to move the hydrocarbons, with other zones still to test.

    well test result

  6. 24 Jan

    Logs confirm significant hydrocarbons across about 3,981 ft of sands with no water, and core shows high porosity and permeability. The well will be cased to total depth and a Toledo sand perforated and tested.

    drilling result