Each one in plain English, with the numbers worked through for a shareholder.
17 Feb 2010investor presentation● Neutral
Presentation for investors on the Moselle Permit acquisition, repeating known details. It shows cash of about A$6.75m, share price $0.041 and market cap about $7.7m. No new substantive information beyond the 8 February announcement is evident in the readable text.
8 Feb 2010asset acquisition disposition▲ GoodMajor
Elixir agreed to buy East Paris Petroleum Development, holder of the 5,360 km2 Moselle Permit in onshore France, for cash and advisory payments totalling US$1m plus an overriding royalty. Completion needs no French ministerial objection. It is the company's first onshore Western Europe entry, targeting conventional and shale gas.
December quarter cash was A$6.7m. High Island gas fell 66% to 0.66 MMscf/d as compressor limits shut in Well A2 from 5 November. Pompano rose to 5.8 MMscf/d after the Well #1 workover. Tiger marketing is still to start; new opportunities are under consideration.
24 Dec 2009material agreement termination▼ BadMajor
The Leopard licence (Block 211/18b, Elixir 56% operator) was relinquished on 21 December 2009 after no farmout partner was found to share drilling costs. This resolves the drill-or-drop thread negatively. Elixir will pursue the 26th UK licensing round and keeps Mulle and Tiger.
AGM presentation largely repeats known facts: cash A$8.1m at June 2009 (about A$7.1m mid-November), debt free, 188.9m shares, share price $0.057. High Island is producing about 0.5 MMscf/d gas and 200 bbl/d condensate (100% project), constrained by facilities.
September quarter cash fell to A$6.95m. The Pompano Well #1 workover succeeded, and High Island uptime was 87% after a 10-day HIOS fire shut-in. Marketing of the Tiger block (211/12b) is set to begin.
Julie Foster, a UK chartered accountant who is secretary of two other ASX companies, became Company Secretary. David Lim resigned effective 23 October 2009. Administrative only.
The 2009 annual report repeats known results. The chairman calls the year disappointing, with focus shifting to survival, cash of about A$8m at balance date, and the exit from Sierra Leone. Several North Sea blocks were relinquished and farmouts remain hard.
The Pompano Well #1 workover was completed and the well is flowing about 3.3 MMscf/d of gas, with water declining to about 325 bbl/d. Rates are being held back during clean-up. This resolves the Well #1 workover thread, with the result so far encouraging.
Full-year accounts show a net loss of A$28.6m (2008: A$6.4m), including A$18.4m of impairments. Gulf of Mexico revenue was A$5.6m (2008: A$9.1m). The company is debt free, and the Sierra Leone sale is confirmed with a 2.5% royalty noted.
Sand has been cleaned out of both Well #1 strings, the 6700 sand was treated with a chemical gravel pack, and water isolation on the B sands was done. Fluid removal is under way, then B sand re-perforation. About a week remains.
The Pompano Well #1 workover began on 20 September, with the liftboat on location and sand bridges confirmed. Coiled tubing is being rigged up, with cement isolation of the water zone to follow. About two more weeks are expected.
Preparations are advanced for the Pompano Well #1 workover, expected to start mid-September and take about 14 days. It will clear sand bridges and try to isolate water in the B sand. This progresses the long-pending repair of the well.
High Island resumed production six days after the fire, at pre-shut-in rates of about 2.2 MMscf/d of gas and 370 bbl/d of condensate (100% project). This resolves the shut-in.
High Island production was temporarily shut in after a fire at a third-party compression facility on the HIOS export pipeline. No restart timing was given, and bypass work is under way. This is a new interruption after the earlier hurricane shut-in.
June quarter sales receipts were A$0.7m and cash A$8.1m (about A$7.9m at report date), debt free. High Island ran at 93% uptime. The Pompano Well #1 workover slipped again to late August or early September after the partner's sale was dropped. Leopard farmout talks continue.
30 July 2009security holder rights change● Neutral
250,000 unlisted employee options (25c exercise price, expiry 31 March 2011) lapsed under the Employee Share Plan rules. Administrative, with no cash or share impact stated.
Non-executive director Trevor Benson resigned effective 29 June 2009 after taking a job at a financial advisory house that bars its executives from holding public company directorships. He held no Elixir securities. The board is now four members.
6 May 2009asset acquisition disposition● NeutralMajor
Elixir sold its UK subsidiary, whose only asset was the 15% Sierra Leone SL-4 interest, to Prontinal for about US$255,000 cash plus a royalty capped at US$5m. Prontinal indemnifies Elixir, which says its involvement in the TGS arbitration is now ended. This resolves the SL-4 dispute thread.
March quarter sales receipts were A$1.4m and cash A$8.9m (A$8.6m at 30 April), with no debt. The Pompano Well #1 workover was deferred to the June quarter. Sierra Leone SL-4 options are under review as the agreement expires in August 2009. Tiger studies conclude July.
The UK regulator waived the drill-or-drop decision date on the Leopard licence (Block 211/18b). A well must now be spudded by 21 December 2009 or the licence is relinquished. This buys time for the ongoing farmout search for the roughly 350 million barrel prospect.
Company Secretary Alex Neuling resigned effective 9 April 2009. Managing Director Andrew Ross fills the role in the interim, and a replacement starts 28 April. Administrative only.
Half-year to December 2008 shows a loss of A$21.5m, including A$24.7m of non-cash and other items such as a A$12.9m Gulf of Mexico impairment and expensed Well #3 costs. EBITDAX was A$3.1m; cash is about A$9.8m and the company is debt free.
Seismic contractor TGS has started arbitration over about US$9.3m for the Block SL-4 survey, naming Elixir's UK subsidiary and Prontinal. Elixir says Prontinal is responsible and will defend vigorously. A BVI hearing on winding up Prontinal is set for mid-March.
Elixir will cancel its AIM listing on 31 March 2009, citing costs and a low trading volume on AIM against an Australian-focused shareholder base. UK holders' shares move automatically to the ASX register; ASX remains the primary listing.
December quarter receipts were only A$1.9m because of the High Island shut-in. Elixir repaid its A$3m convertible notes in January and is debt free, with cash of A$9.0m. High Island is back at pre-shut-in rates. Leopard farmout is hoped within months.
High Island wells restarted after the pipeline repair, ending the shut-in since Hurricane Ike. At Pompano, Well #1's upper 6700 Sand resumed at about 1 MMscf/d as sand bridges cleared, with a workover still planned for the water problem.
The UK regulator extended the Leopard licence (Block 211/18b) by four months to 21 April 2009, giving more time to farm out the unfunded part of the well. Management says the nearby Cladhan discovery de-risks Leopard, whose mean prospective resource is about 350 million barrels.
Elixir's UK subsidiary forfeited partner Prontinal's whole interest in Sierra Leone Block SL-4 after negotiations failed. Prontinal will contest this. The seismic contractor has served a statutory demand of about US$2.58m, which Elixir is seeking to set aside.