Each one in plain English, with the numbers worked through for a shareholder.
20 Oct 2025investor presentation● Neutral
Managing Director's Barrenjoey East Coast Gas Day presentation repeating known positions: Mahalo East 52 PJ and Mahalo North 43 PJ of 2P reserves, with upstream and pipeline FEED progressing before FID. No new results evident. Text is truncated.
Non-executive director Gillian Swaby, on the board since April 2004 and Audit Committee chair since 2009, will retire at the 14 November 2025 AGM rather than seek re-election. Board change of a long-serving director; successor not named in this announcement.
Managing Director's Bell Potter Gas Roundtable presentation restating known positions: Mahalo East 52 PJ and Mahalo North 43 PJ of 2P reserves, four pilots, and upstream and pipeline FEED progressing before FID. No new results evident. Text is truncated.
FY2025 annual report: loss after tax $2.47m (FY24 $7.17m), cash $13.3m at 30 June 2025. Mahalo Hub gross 2P+2C is 676 PJ. Highlights are Mahalo East reserves, the Jemena pipeline FEED, the amended CleanCo agreement and the PURE loan extension. Text is truncated.
Annual Corporate Governance Statement dated 18 September 2025, saying practices substantially follow ASX recommendations except where explained. Administrative disclosure with no new operational or financial substance. Text is truncated.
Appendix 4G key to corporate governance disclosures for FY ended 30 June 2025, confirming the governance statement is current as at 18 September 2025 and on the company website. Administrative filing with no new operational or financial substance. Text is truncated.
CFO Phil Hicks, in the role since July 2021, resigned to pursue an external opportunity. He stays until 30 September 2025 and the company has begun a search for a replacement.
Mahalo East received its first independent reserves certification: 51.8 PJ of 2P and 118.5 PJ of 3P, as at 30 June 2025. This converts earlier contingent resources (2P is 67% above prior 2C) and lifts Comet Ridge's net reserves to nearly 250 PJ 2P and 530 PJ 3P.
The two remaining conditions in the CleanCo gas sales agreement were pushed back to 31 March 2026, to align with the expected Mahalo FID. Supply now starts in 2027 at a lower rate over the first nine months, with a minimum of 21 PJ still to be delivered over seven years.
The $9.5m PURE loan, due September 2025, was extended to 30 June 2027 at an unchanged 12% interest, with no fee. Two co-investors took $3.5m of it. 55m new warrants at $0.16 are issued and about 39.4m old Tranche 1 warrants cancelled.
Managing Director's Queensland Energy Conference presentation repeating known positions: large Mahalo 2P and 2C base, a fourth pilot (Mahalo East) flaring gas ahead of expectations, and both FEEDs under way before FID. No new results evident. Text is truncated.
The Mahalo JV (Comet Ridge 57.14%, Santos 42.86%) engaged Jemena to run FEED on the 10-inch pipeline to the Queensland Gas Pipeline and GLNG pipeline. Jemena is funding the FEED and may build, own and operate it after FID. Resolves the pending Pipeline FEED approval.
Half-year to 31 December 2024: comprehensive loss $1.203m versus $5.745m a year earlier, the smaller loss mainly from non-cash fair-value movements on financial liabilities. Cash was $19.256m after the $12.028m December placement. Restates known Mahalo progress; no new results.
Mahalo East pilot has produced gas continuously for over two weeks, with first gas after only five and a half weeks of dewatering, ahead of expectations. Final core gas content is higher than pre-drilling estimates. Testing continues toward an initial 2P/3P reserves booking.
The Mahalo East pilot production test started up in mid-January 2025, after the October-November drilling. Water and gas will flow along the ME2 lateral into the ME1 vertical well. Core gas desorption is almost complete, with strong volumes seen. No gas rates reported yet.
12 Dec 2024capital raising announcement● NeutralMajor
Comet Ridge raised about $12m through a placement at $0.14 per share, a 9.7% discount to the last close. Funds are intended for its share of Mahalo JV FEED, Mahalo East production testing, Mahalo North approvals and corporate costs. This follows the $15m raised at $0.17 in February 2024.
Santos, as operator, approved the Mahalo JV Project (Comet Ridge 57.14%) to start FEED, a step towards a final investment decision; this resolves the pending approval from the quarterly. Mahalo East production equipment is being installed, and Mahalo North EPBC data is due soon.
Managing Director's AGM presentation repeating the Mahalo Gas Hub position: net 2P+2C of 406 PJ, 3P+3C of 827 PJ, with Mahalo East in pilot testing. No new results evident. Text is truncated.
Mahalo East drilling finished: the ME2 lateral intercepted ME1 and drilled 1,338 m in the Aries coal seam, and core gas desorption is strong. Production testing is expected early in the new year, aiming for a first Mahalo East reserves booking.
Re-release of the 31 October RBC Energy Forum presentation, now including the Listing Rule 5.42 reserves and resources disclosure. Same figures (406 PJ net 2P+2C); no new substance. Text is truncated.
RBC Energy Forum presentation by the Managing Director repeating known positions: net 2P+2C of 406 PJ and 3P+3C of 827 PJ at the Mahalo Gas Hub, with Mahalo East pilot testing noted. No new results evident. Text is truncated.
Mahalo East 1 reached 362 m, intersecting 7.2 m of net coal with higher-than-expected permeability in the lower two seams. The Mahalo East 2 lateral well spudded 20 October, targeting the Aries Seam. Gas flow rates from the lateral are not yet reported.
Mahalo East 1 vertical well spudded in ATP 2061, the first fieldwork under the $5m Queensland grant. It targets up to 400 m, will be cored, and will serve as the intercept for the Mahalo East 2 lateral well to be drilled next.
FY2024 annual report: underlying loss after tax $7.17m (2023: $6.57m), cash $16.8m at 30 June 2024. Reports 580 PJ 2P+2C, the $15m placement and the CleanCo gas agreement, with Mahalo North approvals progressing. Text is truncated.
Appendix 4G, a standard form keying the company's corporate governance disclosures to ASX recommendations for the year to 30 June 2024. Administrative, no new substance.
Annual corporate governance statement dated 23 September 2024, saying practices substantially follow ASX recommendations except as explained. States there were no new board appointments in the last 12 months. Administrative; text is truncated.
Santos completed the select phase for upstream Mahalo JV components, but an independent assurance step must finish before a FEED decision; Comet Ridge says it is concerned about the time taken. Mahalo East drilling is planned for October; Mahalo North FEED is at least 80% complete.
Queensland awarded the Environmental Authority for Mahalo North (PLA 1128), the first development approval for its 100% assets, after about two years' work. Petroleum Lease 1128 is expected next; federal EPBC approval, referred October 2023, is still outstanding.
22 July 2024asset acquisition disposition▲ GoodMajor
The Mahalo Far East Extension block, where Comet Ridge was preferred tenderer in June, was formally awarded as ATP 2072: 66 km2, 100% Comet Ridge as operator, six-year initial term, no domestic supply obligation. This resolves the June approval caveat.
Managing Director's Gold Coast Investment Showcase presentation pitches the Mahalo Gas Hub, east coast gas market pressure, the $12/GJ price cap extended to June 2025 with small-producer exemption, and the May 2024 Future Gas Strategy. No new results evident. Text is truncated.