31 July 2013investor presentation● Neutral
Capital raising presentation supporting the A$9m placement. It says Mahalo's lower productivity points to ineffective completion practices, with a work-over planned, and Mira's high productivity is confirmed. Initial 2P reserves are targeted for 1Q 2014. No new results.
31 July 2013capital raising announcement● NeutralMajor
Comet Ridge raised A$9m through a placement of 50 million shares at A$0.18, a 21.7% discount to the last close, lifting cash to about A$13m. Funds go to the Mahalo work-overs and operations. The first 2P reserves target slips to the first quarter of 2014.
What it means for a shareholder
50.0m new shares at A$0.180 to raise about A$9.0m. That's 11% dilution: every existing holder's slice gets 11% smaller. If you held A$1,000 of shares (5,556 at the issue price), your slice goes from 0.00136% to 0.00121% of the company. To keep it you'd need 681 more shares - about A$123 at the issue price.
June quarter: both Mahalo and Mira pilots started dewatering, but Mahalo productivity is lower than in 2012 and Mira 3 is off-line. Gunn 2 test completed; the Petrel Gunnedah purchase completed, giving 22.5%-60% CSG interests. Largely repeats earlier announcements.
Cash fell to A$4.7m at 30 June 2013 from A$6.5m, with A$1.8m net outflow. Planned spending next quarter is A$2.5m. No debt shown. Year-to-date financing raised A$8.9m. 406,498,746 shares on issue.
Managing Director's Noosa conference presentation largely repeats known facts: Mahalo pilot producing modest gas from two wells, stimulation planned, Mira on-line from June. Updates resources table with Gunnedah now 474 PJ 3C. Share price A$0.24, market cap A$97.6m.
Pressure surveys confirm Mahalo pilot wells are less productive than when drilled in 2012, so a work-over rig is required; two wells still flow gas. Mira's high productivity is confirmed, but Mira 3 is off-line with a pump failure needing a work-over. Santos will operate the work.
Mira pilot, the second Mahalo pilot, is on-line with three of four wells pumping water; gas is expected only after months of dewatering. At Mahalo, two wells flow gas but productivity is below 2012 tests, so remedial stimulation may be needed. Reserves booking later in 2013 'remains on track'.
Non-executive director Chris Pieters becomes Commercial Director for an initial four months, as a consultant at A$2,000 per day. The MD says it reflects the focus on converting the large resource base to reserves.
27 May 2013asset acquisition disposition▲ GoodMajor
Petrel Energy announced completion of the sale of its PEL 6, 427 and 428 interests to Comet Ridge's subsidiary; ministerial approval came 10 May 2013. This resolves the Gunnedah purchase (A$750k, signed June 2012) that had awaited NSW consent, lifting COI to 22.5%, 50% and 60% CSG interests.
Managing Director's presentation at the Hong Kong and Singapore Spotlight on ASX conferences repeats known facts: first Mahalo pilot operating, second due within weeks, first 2P reserves targeted 2013. Market cap A$85.4m at A$0.21, cash A$6.5m. No new results.
Cash fell to A$6.5m at 31 March 2013 from A$9.6m, with A$3.1m operating outflow. Next-quarter spending is estimated at A$1.8m. PEP 50279 was cut by 3,660 sq km (76.2%) on renewal. Shares on issue rose to 406,498,746 via performance rights.
March quarter: Mahalo pilot started with one well flowing gas, Mira nearing start-up, and three step-out holes drilled. Gunn 2 extended test stabilised at about 400 barrels of water a day, the pump limit. Mahalo permit renewal awaited after relinquishing about 8% of the area.
The Mahalo field pilot came on-line late the previous week, with one of four wells immediately flowing gas. This is the first gas from the pilot after nine months of work; rates will be tracked as wells stabilise. Mira is expected on-line within weeks.
Mahalo field pilot construction is nearly complete, with production expected to start mid-April; Mira follows in May. The aim remains reserves certification later in 2013. Lowesby West 1 will be drilled late April, after the operator drills a non-Mahalo well.
Humboldt Creek 2 reached 483 m and intersected 9.4 m of net coal in the southern part of the block, about 24 km from Mira. The rig prepares to move to Lowesby West 1, the last well in the programme.
Humboldt Creek 2 spudded 15 March, third step-out core hole, about 24 km south-southeast of Mira, targeting about 500 m. The MD says about four weeks of drilling time have been lost to weather since December.
Turkey's Nest 1 reached 410 m and intersected 9.6 m of net coal, thicker than Scrubber Gully 2's 7.2 m. Rain delayed drilling; the rig will move to Humboldt Creek 2 once roads dry.
Turkey's Nest 1 spudded 17 February, the second Mahalo step-out core hole, about 5 km southwest of the Mahalo pilot wells, targeting about 420 m. It is meant to extend the area available for reserves booking.
Scrubber Gully 2, first of four Mahalo step-out core holes, hit 7.2 m of net coal at 523 m. It is to be plugged and abandoned. Rig moves to Turkey's Nest 1, extending the area available for reserves booking.
Cash fell to A$9.6m at 31 December 2012 from A$13.5m, with net operating and investing outflow of A$3.9m. Planned spending next quarter is A$4.2m. No debt shown; 402,148,746 shares on issue.
December quarter: Mira's four pilot wells each hit about 8.5-9 m of coal, Mahalo pilot facilities are under construction, and Gunn 2 test is under way. COI earned 20% of the Lake Galilee farm-in area. Initial Mahalo reserves booking is targeted for first half 2013.
Notice of a BRR Media audio interview with the MD on 24 January, giving an update on Galilee Basin operations. No new information in the announcement itself.
Scrubber Gully 2 spudded 24 January, the first of four step-out core holes about 5.2 km southeast of Mira, targeting around 500 m. Stanwell's funding now explicitly covers step-out drilling.
Mira 2 reached 320 m with about 9.1 m of net coal, completing the four-well Mira pilot programme. The Mahalo JV will run two pilot schemes (Mahalo and Mira) aimed at early reserves certification. Four step-out core holes follow, starting with Scrubber Gully 2.
The Gunn 2 Extended Production Test began 11 January in the Galilee Basin, flowing over 120 barrels of water a day from one four-metre coal interval with minimal pressure drop. It is the company's first test on a completed Galilee well; the test will run for months before pilot design is finalised.
Mira 2 spudded 14 January, the fourth and final Mira pilot well, central to the other three and to be cored through the reservoir. Four step-out core holes follow to extend the area available for booking reserves.
Mira 5 reached 320 m with 8.7 m of coal in four intervals, productive and consistent with the earlier Mira wells. It is cased and suspended as a pilot well. The rig moves to Mira 2, the final cored pilot well.
Mira 5 spudded 8 January, the third of four Mira pilot wells, about 500 m east of Mira 4, targeting roughly 310 m. Third well of the eight-well Mahalo programme.
Mira 4 reached 310 m with 8.7 m of coal in four intervals, consistent with Mira 3. It is cased and suspended as a future pilot well. The rig moves to Mira 5.
Mira 4 spudded 3 January, the second of four Mira pilot wells, about 500 m southwest of Mira 3, targeting roughly 310 m. Second well of the eight-well Mahalo programme.