Stockle - the stock oracle

Carbon Minerals Ltd

ASX:CRM
A$0.310Latest close held · delayed

Past year: ▲ 0%(25.0c – 36.0c AUD)

Market cap
A$5.8m
Shares on issue
18.8m
In-ground value
A$2.07bn
Risked multiple
under review
Story beats
33 since 2006
Last event
14 Feb 2024

History

Carbon Minerals found coal seam gas in New South Wales' Gunnedah Basin, ended up with a 35% stake as Santos took 65%, waited years on field work, and was delisted from the ASX in 2024.

2006-2008: Drilling the Gunnedah Basin

In early 2006 Carbon Minerals was exploring for coal seam methane gas in the Gunnedah Basin, New South Wales, after more than six months waiting for a rig. Longlea #1 was spudded (started) on 24 February in PEL 12, and its gas proved high quality, with the Breeza seam 98% methane. The company suggested the Benelabri area could hold 500-750 BCF of gas in place, though it called this unproven and based on older coal data. The trial field had a setback when Georges Island #2 lost its casing and tools, but a redrill, Georges Island #2A, reached 353 m and completed the program.

To pay for more exploration, the company called 10 cents on each of its 18,803,493 partly paid shares, raising $1.88 million. In August 2006 it sought partners for the Maules Creek Sub-Basin and the Bando Trough. In June 2007 Santos answered with a farm-in: it could earn 25% of PELs 1 and 12 by spending at least $10 million, then a further 40% by spending at least $30 million, and became operator. In 2008 shareholders were asked to cancel the uncalled capital so the partly paid shares became fully paid ordinary shares. Kahlua #1, drilled that year, found over 30 m of coal and gas pointing to the same biogenic gas type as Georges Island.

2008-2011: Santos earns in

Santos drilled Stoney Creek #1 in October 2008, but missed the December 2008 spending deadline for phase 1, and was given 12 more months. Results were mixed: Slacksmith #1 reached 1,410 m, the deepest well in the basin, but its Late Permian coals were under-saturated, and Kerawah #1 found tight coal with high carbon dioxide. Phase 1 ended in December 2009 with Santos holding 25%.

In April 2010 the company gave its first contingent resource estimates for its 75% share of PEL 1, with a mid-case 2C figure of 183 PJ. Santos elected in June 2010 to start phase 2, a pilot program requiring at least $30 million of spending to earn a further 40%. Four Kahlua pilot wells confirmed thick, permeable coals, though Cana #1 in March 2011 found very low gas in the Late Permian coal, marking the edge of the best gas area.

In September 2011 an agreement resolved the earlier dispute-ridden farm-in. Santos took a further 40% for $15 million cash, leaving Carbon Minerals with 35% and Santos 65%, with the company's share of a new work program capped at $13 million.

2013-2019: Loss of a chairman and a long hold

Executive Chairman Paul Lincoln Smith, chairman since the company formed in 1980, died on 3 March 2013. His son Marcus Lincoln Smith, already a director, was elected Executive Chairman on 15 March. In the same period new NSW controls, including a 2 km exclusion zone and a licence requirement, delayed Kahlua remediation and core drilling. PEL 12 was renewed to September 2016.

In January 2014 the company and Santos restructured their arrangements: Santos would do the paused field work when reasonable, and the $13 million cap continued, with no restart date. The 2015 annual report showed field work on hold apart from maintenance, PEL 1 renewal pending, and a loss of $7.24 million, mostly a $7.142 million write-down of asset book value. Cash was $4.99 million. The record is quiet for 2017 to 2019.

2020-2024: Restart and delisting

In March 2020 a $9.865 million work program was approved, including reactivating the Kahlua pilot with a six-month production test, and the company's 35% share was $3.453 million from cash. It also arranged an unsecured loan facility of up to $1.25 million from Palmarc Investments, a company associated with the Lincoln Smith directors. The facility was undrawn by September 2023.

In February 2022 the ASX suspended trading, saying the company's level of operations did not warrant quotation. In April 2022 NSW renewed PEL 1 and PEL 12 for six years to April 2028. The regulator approved the Kahlua pilot review in March 2023, and Bando seismic data was acquired in early 2023, with analysed results still awaited in October.

Because the shares had been suspended for two continuous years, and the shareholder spread requirement was not met, the ASX declined an extension and removed the company from its Official List on 14 February 2024. It continued as an unlisted public company. At 31 December 2023 cash was $1,072,412, down from $2,609,727 at 30 June 2023, with no debt drawn. The Lincoln Smith family controlled about 80% of roughly 18.8 million shares, and Santos's right of first refusal on a change of control now applied. A private share trading platform was being investigated.

Written from the 33 story beats below (2006 to 14 Feb 2024), which come from the company's own announcements and filings.

Beat by beat

The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.

shares on issue market cap (log scale)

202418.8m shares

  1. 14 Feb

    ASX removed CRM from the Official List from the start of trading on 14 February 2024 under Listing Rule 17.12, after two continuous years of suspension. Shares were suspended since 14 Feb 2022.

    registration revoked

    18.8m sh
  2. 12 Feb

    ASX declined the six-month extension request on 9 Feb, so CRM will be delisted on 14 February 2024 and continue as an unlisted public company. The Santos right-of-first-refusal clause on change of control now applies; the Lincoln Smith family has no present intention to sell. A private share trading platform is being investigated.

    listing compliance notice

    18.8m sh
  3. 9 Feb

    CRM cannot confirm compliance with all ASX Listing Rules, because the shareholder spread requirement is not met. It will ask ASX to extend the suspension beyond its two-year mark (14 Feb 2024) to avoid delisting. If refused, it will be delisted.

    listing compliance notice

    18.8m sh

202318.8m shares

  1. 14 Sept

    Half-year to 30 June 2023: loss $109,224; cash $2,609,727; loan facility undrawn. ASX warned on 25 August 2023 that entities suspended for 2 continuous years are removed from the list; CRM suspended since 14 February 2022, so the deadline is February 2024 (inference).

    half year report

    18.8m sh
  2. 28 Apr

    March 2023 quarter: Bando seismic data acquisition completed, with initial data suggesting good reflectors; processing due in Q2. Regulator approved the Kahlua pilot reactivation review on 15 March 2023. Spend jumped to $519,781; cash $2,695,616.

    quarterly activities report

    18.8m sh

202218.8m shares

  1. 28 Apr

    NSW renews PEL 1 and PEL 12 for six years from 12 April 2022 to 12 April 2028, ending the long wait since the 2015 and 2016 expiries. Year 1 work includes reactivating the Kahlua pilot and geological studies.

    regulatory community update

    18.8m sh
  2. 9 Feb

    ASX will suspend trading after close on 14 February 2022, saying CRM's level of operations does not warrant continued quotation (Listing Rule 12.1). The suspension lasts until greater exploration activity is shown. The company blames Covid border closures and NSW legal challenges, and stays listed.

    listing compliance notice

    18.8m sh

202018.8m shares · A$4.8m market cap

  1. 25 Mar

    Unsecured loan facility of up to $1.25M for up to 5 years from Palmarc Investments, a company associated with the Lincoln Smith directors. Each draw is repayable within 12 months at the bank bill rate, and repayment may be made in shares, subject to shareholder approval.

    debt financing

    18.8m shA$4.8m
  2. 19 Mar

    Approved 2020 NSW work program and budget of $9.865M, ending the long hold on field work if approvals come. This includes reactivating the Kahlua pilot ($6.775M) with a 6-month production test. CRM's 35% share is $3.453M from cash; it assumes licence renewal by end Q2 2020.

    drilling scheduled

    18.8m shA$4.8m

201618.8m shares

  1. 24 Mar

    2015 annual report: field work stayed on hold apart from maintenance, and PEL 1 renewal is pending. Loss was $7.24M, mainly a $7.142M write-down of asset book value (versus $31,311 loss in 2014). Cash $4.99M; 2016 budgeted share of spend $341,250.

    annual report

    18.8m sh

201418.8m shares

  1. 20 Jan

    ACM and Santos restructured their PEL 1 and 12 arrangements: Santos will do the paused field work when reasonable, minimum government commitments will be met by the parties, and ACM's $13M cost cap continues. This pushes the earlier timetable out with no restart date.

    joint venture update

    18.8m sh

201318.8m shares · A$20.1m market cap

  1. 30 Apr

    March 2013 quarter: PEL 12 renewal approved to 26 Sept 2016. New NSW controls, including a 2 km exclusion zone and licence requirement, delayed Kahlua remediation and core drilling, which did not happen. Marcus Lincoln Smith is Chairman and CEO; technical adviser Mal Bunny retired. Spend $4.2M.

    quarterly activities report

    18.8m shA$20.1m
  2. 15 Mar

    Marcus Lincoln Smith, already an executive director, was elected Executive Chairman after his father's death on 3 March 2013. This resolves the leadership gap.

    director officer appointment

    18.8m shA$20.7m
  3. 5 Mar

    Executive Chairman Paul Lincoln Smith, chairman since the company formed in 1980, died suddenly on 3 March 2013. A leadership change is now needed for the company.

    director officer appointment

    18.8m shA$20.5m

201118.8m shares · A$31.0m market cap

  1. 26 Sept

    Agreement with Santos transfers a further 40% of PELs 1 and 12 for $15M cash, taking the split to ACM 35%, Santos 65%. A new work program runs to 30 June 2013, with ACM's share capped at $13M. This resolves the earlier dispute-ridden farm-in; Kahlua pumping began 1 Sept.

    farm in farm out agreement

    18.8m shA$31.0m
  2. 25 Mar

    Cana #1 corehole in PEL 1 reached 961 m. Late Permian Hoskissons coal had very low gas, marking the biogenic fairway's southeastern edge. Early Permian coal had 12.24 m net with 90-99% methane, encouraging. The company says half the mapped areas at half the gas would give over 2,000 PJ.

    drilling result

    18.8m shA$56.4m
  3. 31 Jan

    December 2010 quarter: four Kahlua pilot wells were drilled, confirming thick, highly permeable Late Permian coals (Hoskissons and Melvilles). The report states gas in place of about 3 PJ per sq km at Kahlua. Cana corehole is delayed to February 2011, and the PALA 5 application was withdrawn at Santos's request.

    quarterly activities report

    18.8m shA$56.4m

201018.8m shares · A$63.9m market cap

  1. 9 June

    Santos elected, effective 8 June 2010, to proceed with phase 2 pilot work, giving it the right to earn a further 40% of the Gunnedah tenements. It must spend at least $30M within 24 months on two multi-well pilots and more drilling.

    farm in farm out agreement

    18.8m shA$63.9m
  2. 30 Apr

    March 2010 quarter: first contingent resource estimates for the 75% ACM share of PEL 1: 1C 16.4 PJ, 2C 183 PJ, 3C 4,093.9 PJ. Agreement in principle reached with Santos on the two-year phase 2 pilot program, five extra wells, all in PEL 1. No drilling.

    quarterly activities report

    18.8m shA$60.2m
  3. 29 Jan

    Phase 1 of the Santos farm-in ended 14 December 2009, and Santos has now acquired a 25% interest in PELs 1 and 12. Kerawah #1 (947.7 m) found tight coal and high carbon dioxide. Longlea #1 pump test gave permeability of 10-200 millidarcies.

    farm in farm out completion

    18.8m shA$60.2m

200918.8m shares · A$56.4m market cap

  1. 29 May

    Slacksmith #1 reached 1,410 m, the deepest well in the Gunnedah Basin, with over 90 m of coal. Late Permian coals are under-saturated. Lake Goran #1 stopped at 945.7 m after heavy igneous intrusions, though gas quality was excellent.

    drilling result

    18.8m shA$56.4m
  2. 7 Jan

    Santos missed the 14 December 2008 end of phase 1 (minimum $10M), so a Deed of Amendment of 8 December gives 12 more months, to 14 December 2009, for six PEL 1 and five PEL 12 coreholes plus seismic. Stoney Creek #1 finished at 678.65 m, gas somewhat under-saturated.

    farm in farm out agreement

    18.8m shA$29.1m

200818.8m shares · A$45.1m market cap

  1. 24 Oct

    Santos spudded Stoney Creek #1 on 23 October 2008 in the Maules Creek Sub-Basin, NE PEL 1. It is the first dedicated seam gas well in that Early Permian sub-basin, to be cored to basement at about 740 m.

    drilling spud

    18.8m shA$45.1m
  2. 12 Sept

    Kahlua #1, spudded 26 July, reached basement at 660.65 m on 1 September. It found over 30 m of coal, with the Hoskissons Seam at 8.53 m. Gas content of 3-5 m3/t and permeability above 100 milliDarcies point to biogenic gas like Georges Island. Half-year profit was $97,406.

    drilling result

    18.8m sh
  3. 8 Aug

    ASX circular: if shareholders approve on 15 August 2008, the uncalled share capital is cancelled and the partly paid shares (CRMCB) become fully paid ordinary shares (CRM). Normal trading is due 1 September 2008.

    security holder rights change

  4. 30 Jan

    December 2007 quarter: PEL 12 renewed for four years with a $5 million work commitment over years 1-2, which Santos's farm-in program is expected to meet. BHP Billiton agreed access and compensation terms for coal drilling on Glasserton. PEL 454 ground work still undated.

    quarterly activities report

2007

  1. 18 June

    Santos signed a farm-in on PELs 1 and 12: it earns 25% by spending at least $10 million over 18 months, then a further 40% by spending at least $30 million over 24 months. Santos becomes operator. This follows the August 2006 call for partners.

    farm in farm out agreement

2006

  1. 7 Aug

    The company is seeking joint venture partners for two areas, the Maules Creek Sub-Basin in PEL 1 and the Bando Trough in PEL 12, so it can concentrate on Georges Island and Longlea. It is a call for interest, not a deal.

    joint venture update

  2. 1 May

    The company will call 10 cents on each of 18,803,493 partly paid shares to raise $1.88 million for further Gunnedah Basin methane exploration. Payment is due by 2 June 2006.

    capital raising announcement

  3. 27 Apr

    The Georges Island #2A redrill reached 353m with casing correctly set across both seams. The original GI#2 hole was plugged, which completes the drilling program. Drill-stem tests on all four wells await equipment.

    drilling result

  4. 29 Mar

    Longlea #1 gas from the Breeza (98% methane) and Hoskissons (80% methane) seams is high quality with no detectable CO2. The company suggests the Benelabri area could hold 500-750 BCF gas-in-place, an unproven estimate based on older coal data.

    resource reserve update

  5. 27 Mar

    Georges Island #2 hit its targets, but the casing string parted during cementing and drill tools became stuck. The company says a complete redrill now appears necessary, a setback to the trial field.

    drilling result

  6. 27 Feb

    Drilling began on Longlea #1 in PEL 12 (spudded 24 February) after a wait of more than six months for a rig. Target is the Hoskissons Seam at about 450m; the rig then moves to follow up the Georges Island #1 discovery.

    drilling spud