Stockle - the stock oracle

Blue Energy Limited

ASX:BULASX:BLU
A$0.054Latest close held · delayed

Past year: ▲ 79900%(0.35c – 4.00 AUD)

Market cap
—
Shares on issue
0
In-ground value
A$1.92bn
Risked multiple
4.11×
Story beats
141 since 2006
Last event
31 July 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

29 Sept 2006annual report● Neutral

Full financial report for the year to 30 June 2006, repeating the preliminary figures (loss $1.36m). Lists directors Martino (chair), Doherty (MD) and Meagher. Doherty's associates hold about 70.3 million shares. No new substance beyond the 13 September preliminary report.

Discuss in chat

13 Sept 2006annual report▼ Bad

Preliminary results for the year to 30 June 2006: loss of $1.36m against a $363k profit the prior year, revenue down 89% to $88k. Cash was $173k at year end; convertible notes of $3.65m outstanding. Reflects the shift from investment company to explorer.

Discuss in chat

6 Sept 2006investor presentation● Neutral

EIV restates its 'Three Pillar' strategy with an investor presentation: Cooper Basin gas, Queensland CBM, and conventional exploration including PNG. It repeats known facts such as Rossco-1's 4.2 MMcf/d flow and the Magellan farm-in; no new results.

Discuss in chat

28 Aug 2006material agreement▲ GoodMajor

EIV won an option to earn up to 70% of PNG licence PPL 248 by funding two exploration wells; the Banam Anticline has a potential 10 Tcf of gas at POS 50. EIV issues 4 million shares to SEGA if exercised, by 26 November 2006.

Discuss in chat

4 July 2006farm in farm out agreement● Neutral

Magellan confirms the Burrum Syncline farmout to EIV's Eureka: Eureka funds 100% of a two-stage program for a 90% interest, subject to government consents. Magellan operates and can back in for up to 50% on development. Repeats EIV's 3 July announcement.

Value this in the calculator →Discuss in chat

3 July 2006farm in farm out agreement▲ GoodMajor

EIV subsidiary Eureka agreed to fund a two-stage coal bed methane program at Magellan's Burrum Syncline (Maryborough Basin) to earn 90%. Stage 1 is two core wells, due by 31 December 2006; Magellan may back in for up to 50% if developed.

Value this in the calculator →Discuss in chat

28 June 2006well test result▲ GoodMajor

Rossco-1 flowed gas at about 4.2 million cubic feet a day with 100-150 barrels a day of condensate from the 27-9 sandstone. Two deeper zones tested flowed nothing. It partly resolves the January cased-hole testing; EIV holds 37.5% if commercial.

Discuss in chat

27 June 2006drilling result▲ GoodMajor

Paprika-1 will be cased and suspended as a potential gas/condensate producer, based on log interpretation of several net pay zones and hydrocarbon indications in a test. One test was a mis-run; no flow rate reported. Cased-hole testing follows in coming months.

Value this in the calculator →Discuss in chat

23 June 2006drilling progress report● Neutral

Paprika-1 wireline logging continues and has recognised possible hydrocarbon zones in the Patchawarra. A drill-stem test is expected over the weekend. No result yet.

Value this in the calculator →Discuss in chat

22 June 2006drilling progress report● Neutral

Paprika-1 reached total depth of 2919 m, with hydrocarbon shows continuing through the Tirrawarra and Merrimelia. Wireline logging will evaluate them over several days; result pending.

Value this in the calculator →Discuss in chat

21 June 2006drilling progress report● Neutral

Paprika-1 at 2858 m: possible hydrocarbon-bearing zones penetrated in the Patchawarra, to be evaluated after logging. Early sign only, not a result.

Value this in the calculator →Discuss in chat

13 June 2006drilling progress report● Neutral

Paprika-1 began drilling on 11 June 2006 and is running surface casing at 1005 m. Funded by EIV's Kompliment and Enterprise Energy's subsidiary. No result yet.

Value this in the calculator →Discuss in chat

13 June 2006drilling spud▲ Good

EIV confirms Paprika-1 spudded 11 June and is at 1005 m; EIV earns 37.5% on a commercial discovery. Funding it also satisfies a pre-condition for earning 50% of the Spinel Block. Rossco-1 production testing has begun.

Value this in the calculator →Discuss in chat

9 June 2006drilling scheduled● Neutral

Paprika-1 will spud this weekend, targeting 9-70 BCF (P50 30 BCF); EIV fully funds it for 37.5% on a commercial discovery. Cased-hole testing of Rossco-1 also starts, with up to three zones over about two weeks.

Value this in the calculator →Discuss in chat

6 June 2006drilling progress report● Neutral

Cadenza-1 final report: cased and suspended, rig released after 18.5 days, and moving to Paprika-1. Cased-hole testing to follow in about three months. No new result.

Value this in the calculator →Discuss in chat

5 June 2006drilling progress report● Neutral

Cadenza-1 is being cased and suspended as a potential gas producer. The second test was aborted by a packer failure, so further cased-hole testing is deferred about three months. The 1.5 MMcf/d first-test flow stands.

Value this in the calculator →Discuss in chat

2 June 2006drilling result▲ GoodMajor

EIV confirms the Cadenza-1 gas discovery (about 1.5 MMcf/d), its fourth discovery after Nutmeg, Paranta-1 and Rossco-1. Everdue earns 50% of any production licence; Paprika-1 is expected to spud within 10 days.

Value this in the calculator →Discuss in chat

2 June 2006flow test result▲ GoodMajor

Great Artesian reports Cadenza-1 a new field gas discovery: gas flowed to surface at about 1.5 million cubic feet a day from 2691-2694 m in the first test. It resolves the pending log evaluation; the well, funded by EIV's Everdue, will be cased and suspended.

Discuss in chat

1 June 2006farm in farm out agreement▲ Good

EIV announces its expanded PEL 106 position: a 37.5% interest in Paprika-1 and the right to earn 50% of the 360 sq km Spinel Block. Repeats the 1 June farm-in with Great Artesian and adds Rossco-1 testing and Cadenza-1 logging updates.

Value this in the calculator →Discuss in chat

1 June 2006farm in farm out agreement▲ GoodMajor

EIV subsidiary Kompliment signed two farm-ins with Great Artesian in PEL 106: Paprika-1 well (37.5% interest, 30 BCF best estimate) and the Spinel Block 3D seismic and wells (up to 50%). Committed spend is $7.1–7.4m, up to $13–14m if all options exercised.

Value this in the calculator →Discuss in chat

1 June 2006drilling progress report▲ Good

Cadenza-1 is at 2993 m total depth. Preliminary log analysis confirms a number of gas-bearing zones, and drill-stem tests are planned for 2 June. Early positive sign, no flow result yet.

Value this in the calculator →Discuss in chat

31 May 2006drilling progress report● Neutral

Cadenza-1 reached total depth of 2993 m in the Merrimelia Formation on 30 May. Wireline logs are being run to evaluate the hydrocarbon shows; result pending.

Value this in the calculator →Discuss in chat

30 May 2006drilling progress report▲ Good

Cadenza-1 at 2963 m: further hydrocarbon shows in the lower Patchawarra and Tirrawarra. Drilling deeper to total depth before logging; shows are not yet confirmed.

Value this in the calculator →Discuss in chat

29 May 2006drilling progress report▲ Good

Cadenza-1 at 2905 m: a number of possible hydrocarbon-bearing zones have been penetrated in the Patchawarra, to be evaluated after wireline logging. Early encouraging sign, not yet a result.

Value this in the calculator →Discuss in chat