Black Mountain Energy listed in 2021 to appraise its Valhalla gas project in WA, met repeated delays, sold a Permian stake at a profit, and delisted in March 2024.

2021-2022: Listing and the Valhalla plan

Black Mountain Energy was admitted to the ASX on 21 December 2021, with trading starting on 23 December. Its initial public offering raised $11 million by selling 55 million shares at $0.20, and 200 million existing shares were held in escrow (locked up) for 24 months. The company's asset was Project Valhalla, a gas exploration permit called EP 371 in the Canning Basin, Western Australia, held through subsidiaries. It was estimated to hold 11.8 trillion cubic feet of prospective gas and 1.5 trillion cubic feet of contingent gas. BM Canning LLC was the largest shareholder, and the prospectus described the company as highly speculative.

In April 2022 the state regulator approved the environmental plan for a 130 km 2D seismic survey (a way of imaging rock layers), and surveys found no threatened plants or Greater Bilby sightings. A blending study found Valhalla gas suitable for blending into existing WA pipelines and for LNG conversion, though no sale deal followed. In June a US firm, Highwire, gave a non-binding letter of intent to buy well-test gas to power cryptocurrency mining servers.

The second half of 2022 went badly. Michael Laurent was appointed chief operating officer, replacing Samantha Richardson. The seismic work stalled awaiting a final approval, then BME could not find a replacement crew before the wet season, pushing the survey to early 2023. In December, answering an ASX query, BME confirmed that its gas export exemption was conditional on agreeing a Domestic Gas Commitment Agreement with the State, a condition it had not previously disclosed.

2023: Delays, a Permian detour and a sale

In January 2023 BME paid a $39,960 ASIC penalty, without admitting fault, over alleged misleading carbon and emissions statements. Later that month it agreed to buy the Half Moon Prospect in New Mexico, eight producing wells making about 77 barrels of oil equivalent a day, for US$2 million cash. It was the company's first producing asset.

Valhalla slipped again. State environmental feedback called for extra baseline studies, and floods limited access. In April the regulator approved an 18-month suspension and extension of the work program, moving seismic and drilling to the 2024 and 2025 dry seasons.

To fund this, BME launched a 2-for-3 entitlement offer in February at $0.025 a share, a 37.5% discount to the prior close, seeking up to about $4.25 million. Rhett Bennett and BM Canning committed at least $2.1 million. Take-up was roughly 65%, and with the shortfall placement the offer and placement raised $3.155 million before costs. Shares on issue stood at 383,224,186 at the end of 2023.

In June BME joined an appraisal well at Half Moon operated by Manzano Energy, taking an 11.7% share at about US$1.44 million of a US$12.3 million cost. It booked first contingent resources at Half Moon, and by early July the well had reached its planned depth with a long lateral section in the target formation, with no flow results reported. Then in August BME agreed to sell the Half Moon acreage and its interest in that well to Tap Rock Resources for US$6.87 million, keeping the eight producing wells. The sale settled on 13 October, bringing in US$6.58 million (about A$10.4 million) before tax, with proceeds earmarked for Valhalla.

2023-2024: Leaving the ASX

On 28 December 2023 BME applied to be removed from the ASX. The board pointed to a market value of about $8.81 million against roughly $7.5 million in cash, weak fundraising support beyond Rhett Bennett's entities, and low trading liquidity. Shareholders passed the required special resolution at a meeting on 12 February 2024.

BME began 2024 with about A$7.7 million in cash. It said it remained committed to Valhalla approvals, with 130 km of new 2D seismic planned beyond 2024. On 15 March 2024 it was removed from the ASX Official List at its own request, so its shares can now be sold only off-market. At that date Valhalla still awaited environmental review feedback and a referral under federal environmental law, and the Domestic Gas Commitment Agreement remained open. The retained eight Morrow wells in the Permian were shut in until gas prices rise.

Written from the 26 story beats below (2021 to 15 Mar 2024), which come from the company's own announcements and filings.

Beat by beat

The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.

shares on issue market cap (log scale)

2024383m shares · A$2.3m market cap

  1. 15 Mar

    BME was removed from the ASX Official List at close of trading on 15 March 2024, at its own request after shareholders voted for it. Completes the delisting begun in December; shares can now be traded only off-market.

    registration revoked

    383m shA$2.3m
  2. 11 Mar

    BME confirmed it will leave the ASX on 15 March 2024 and began the year with about A$7.7m cash. It stays committed to Valhalla approvals; 130 km of new 2D seismic is planned beyond 2024. After delisting, shares can only be sold off-market.

    other

    383m shA$2.3m

2023383m shares · A$8.4m market cap

  1. 28 Dec

    BME applied to remove itself from the ASX, with ASX approval conditional on a shareholder special resolution and at least one month to sell. The board cites a ~$8.81m market cap against ~$7.5m cash, weak fundraising support beyond Rhett Bennett's entities, and low liquidity.

    other

    383m shA$8.4m
  2. 16 Oct

    The Half Moon sale settled on 13 October 2023, with BME receiving US$6.58m (about A$10.4m) before tax after adjustments, below the US$6.87m headline price. Completes the sale announced in August; proceeds are earmarked for Valhalla.

    asset acquisition disposition

    183m shA$4.0m
  3. 24 Aug

    BME agreed to sell its Half Moon acreage and its MIA 64 FEE 2H well interest to Tap Rock Resources for US$6.87m (about A$10.7m), against the US$2m purchase price in January. It keeps the eight producing wells. Subject to 30-day due diligence; funds go to Valhalla.

    asset acquisition disposition

    183m shA$4.4m
  4. 4 July

    The MIA 64 FEE 2H well reached 16,845 feet ahead of schedule, with 10,139 feet of lateral in the 3rd Bone Spring. The company expects the whole lateral to be oil productive, with strong gas shows. Fracture stimulation is due at the end of July; no flow results yet.

    drilling result

    183m shA$3.5m
  5. 15 June

    BME booked its first Half Moon contingent resources: net 2C of 1.564m barrels of oil equivalent (1C 561,000; 3C 3.366m). It sees up to 20 horizontal wells at an average 14.1% interest. Conversion to reserves depends on the first well's performance.

    resource reserve update

    183m shA$3.5m
  6. 13 June

    The MIA 64 FEE 2H well, BME's first Permian well, has started drilling with the Scandrill rig. Drilling should take about 25 days, then fracture stimulation and testing. BME holds 11.7%; first production still expected in about 90 days.

    drilling spud

    183m shA$3.5m
  7. 1 June

    Manzano's proposal was accepted: BME will join the MIA 64 FEE 2H Half Moon appraisal well with an 11.7% interest, about US$1.44m of the US$12.3m cost. Drilling starts in June, first production expected in about 90 days. Resolves the pending participation decision.

    drilling scheduled

    183m shA$3.5m
  8. 25 May

    Manzano Energy proposed a US$12.3m gross horizontal appraisal well on the 3rd Bone Spring at Half Moon, with drilling possibly from June 2023. BME's ~11.7% share would cost about US$1.44m. BME is still considering the proposal and has not yet decided.

    drilling scheduled

    183m shA$3.8m
  9. 28 Apr

    March quarter: the regulator approved an 18-month suspend and extend of the EP 371 work program on 6 April 2023, so seismic and drilling move to the 2024 and 2025 dry seasons. The entitlement offer and shortfall raised $3.155m before costs. Further floods limit access.

    quarterly activities report

    183m shA$3.8m
  10. 17 Mar

    The entitlement offer closed with applications for about $2.75m of the $4.25m sought, roughly 65% take-up, at $0.025. About $1.5m of shortfall (59.97m shares) can be placed over 3 months by Foster and CPS. Funds go to Half Moon and working capital.

    capital raising announcement

    150m shA$3.6m
  11. 20 Feb

    BME launched a 2-for-3 renounceable entitlement offer at $0.025 per share to raise up to about $4.25m, a 37.5% discount to the $0.04 close. Rhett Bennett and BM Canning LLC committed at least $2.1m. Funds go to Half Moon costs, Valhalla commercialisation and working capital.

    capital raising announcement

  12. 17 Feb

    Valhalla faces more delay: EPA feedback on the draft Environmental Review Document calls for extra baseline studies, likely extending approval time. January floods at Fitzroy Crossing limit access, so seismic may slip and BME will apply to suspend and extend permit obligations. Half Moon production is confirmed.

    regulatory community update

  13. 25 Jan

    BME is buying Earthstone Energy's 100% interest in the Half Moon Prospect, eight producing vertical wells in New Mexico's Permian Basin, for US$2m cash. Net production is about 77 boepd. It is BME's first producing asset, alongside the undeveloped Valhalla project in WA.

    asset acquisition disposition

  14. 5 Jan

    BME paid a $39,960 ASIC penalty, without admitting fault, over alleged misleading carbon and emissions statements in three announcements (Dec 2021, May 2022, Sept 2022 presentations). Payment means no proceedings will be brought over that conduct.

    listing compliance notice

2022

  1. 5 Dec

    Replying to an ASX query, BME confirmed the WA gas export exemption is material but is conditional on agreeing a Domestic Gas Commitment Agreement with the State, a condition it had not disclosed. It says the condition is not material and that it complies with Listing Rule 3.1.

    listing compliance notice

  2. 18 Oct

    BME could not secure a replacement seismic crew before the Canning Basin wet season, so the Odin 2D seismic at Valhalla is now likely early Q2 2023. Expenses on the program are $1.3m this year. It is analysing a work program change to drill an appraisal well in 2023.

    drilling progress report

  3. 15 Sept

    The Valhalla seismic acquisition is delayed pending final regulatory approval of the geophysical survey; the contractor has demobilised. Completion in Q3 2022 is uncertain. The company is considering a vertical appraisal well in 2023, a change from the earlier 2024 timing.

    drilling progress report

  4. 5 Sept

    Michael Laurent, currently COO of Armour Energy, will replace Samantha Richardson as COO by 28 November 2022 at the latest. Richardson was to move to non-executive director from 1 October. Laurent will lead the Valhalla strategy and new business opportunities.

    director officer appointment

  5. 22 June

    BME received a non-binding letter of intent from US firm Highwire to buy up to 5TJ/day of Valhalla well-test gas, otherwise flared, to power cryptocurrency mining servers. No binding deal; terms, due diligence and approvals still needed. A new, non-core revenue idea for a pre-production explorer.

    material agreement

  6. 28 Apr

    A gas blending study by Australian Gas Infrastructure Group found Valhalla gas suitable for blending into existing WA pipelines (Dampier Bunbury Pipeline) and for LNG conversion. The study is qualitative; no offtake deal or pipeline agreement is announced.

    material agreement

  7. 1 Apr

    The WA mines regulator (DMIRS) approved the environmental plan for the 130km 2D seismic survey at Valhalla (EP 371), resolving the open approval thread. Surveys found no threatened flora or ecological communities and no Greater Bilby sightings; heritage survey found no impact.

    regulatory community update

2021

  1. 23 Dec

    BME began ASX trading on 23 December 2021 after its $11m IPO (55m shares at $0.20), with an indicative market value of $51m. EP371 is estimated to hold 11.8 TCF prospective and 1.5 TCF contingent gas; a September 2021 gas export exemption was granted.

    other

  2. 21 Dec

    Replacement prospectus for the IPO of 55 million shares at $0.20 to raise $11 million, offer closing 27 November 2021. It holds Valhalla (EP 371) via subsidiaries, with BM Canning LLC as largest shareholder; risks are flagged as highly speculative.

    other

  3. 21 Dec

    Black Mountain Energy was admitted to the ASX on 21 December 2021, with trading starting 23 December. Its IPO raised $11 million at $0.20 per share (55 million shares). 200 million existing shares are escrowed for 24 months.

    other