1 Aug 2006drilling result▲ Good
Weekly report: Callawonga-1 reached 1,936 m with about 8 m net oil pay; most likely recoverable 1.5 million barrels (range 1.0-2.1). 3-D seismic planned Nov-Dec. Kiana-1 flowing 500 bopd; Tipton West 25 wells completed.
Beach says it has expressed some interest in Delhi Petroleum assets and the FIELDS loan notes and is evaluating its position, but has made no offer. An expression of interest does not mean an offer will follow.
Great Artesian reports Kiana oil production resumed after pump installation, the upper Patchawarra zone free-flowing about 400 barrels a day with no water. Total about 800 a day expected once the lower zone is added. Beach operates with 40%.
Cooper reports Callawonga-1 at 1,713 m. Oil shows persist to 1,351 m, possibly a 10 m oil column pending logs. The Hutton was entered at 1,638 m with no shows. Beach 75%.
Beach secures an unsecured A$100 million corporate facility from Commonwealth Bank, against current debt of A$1 million. It can fund Basker-Manta start-up, new opportunities and possible faster gas/condensate development. Beach says the 69-well program is funded from cashflow.
Cooper repeats the Callawonga-1 discovery: the Namur test flowed 2,400 barrels of oil a day, no water. Drilling continues to deeper targets. Beach 75% operator.
Beach announces a new oil field discovery at Callawonga-1, about 7 km from Christies facilities. The Namur test flowed 2,400 barrels a day with no water. Beach holds 75% and is operator.
Cooper reports Callawonga-1 at 1,346 m with oil shows in good sands at the top of the Namur. An open-hole production test over 1,342-1,346 m is next. Beach 75%.
Weekly report: Callawonga-1 oil shows in Namur, test pending. Kenmore-37 found about 4-5 m net oil pay, to come online mid-August. Kenmore-38 next. Tipton West still 22 wells completed.
Weekly report: Callawonga-1 still delayed by wet weather. Kenmore-37 spudded 15 July and was drilling at 860 m. Revenue-1 cased and suspended, with testing in August. Tipton West has 22 of 75 planned wells completed.
13 July 2006security holder rights change● Neutral
Beach reports 2,062,096 of its 2005 bonus options expired unexercised on 30 June 2006. Issued capital is 535,635,169 shares and 45,436,681 $1.00 options expiring 30 September 2006.
Cooper says Callawonga-1 in PEL 92 will spud 14 July, targeting the Namur and Hutton sandstones to 1931 m. P50 prospect recoverable is 1 million barrels in Namur and 0.7 million in Hutton; 32% chance of success. Beach 75% operator.
Weekly report confirms Boomer-1 (1,775 m) found no commercial hydrocarbons and was abandoned. Kenmore-36 was inconclusive and cased for testing. Kiana-1 nears restart; Middleton-1 and Udacha-1 completed for gas, with August production tests. Revenue-1 casing run; Basker-3 flowed 7,105 bopd.
Stuart reports Revenue-1 found a new oil pool in the McKinlay Formation, with about 2 m of oil pay on logs. Hole conditions prevent testing, so the well will be cased. Murta and Birkhead shows to be tested later. Beach 33.3%.
Cooper reported that Boomer-1 in PEL 92 reached 1,775 m, was logged and cored, and was being plugged and abandoned, ending the well. The Century 3 rig was to move to Callawonga on 13 July; Beach held 75% and Cooper 25%.
Anzon reports Basker-3 retested at 7,105 barrels a day after a faulty valve was bypassed, up from last week's 3,552. This is in line with other Basker wells. The Basker-2 gas leak cause was found. Beach holds 50%.
Weekly report: Boomer-1 drilling at 1,486 m after a Murta test with minor recovery. Kenmore-36 a test tool failed to set. Revenue-1 at 1,373 m with oil shows. Basker-3 flowed 3,552 bopd; Basker-2 suspended. Tipton West drilling continues.
Beach reports the Boomer-1 Murta test (1150-1165 m) had no flow to surface, recovering about 0.9 barrels of oil/water emulsion and 2 barrels of mud. Drilling continues toward the Namur target. Beach 75%.
Cooper reports Boomer-1 at 1,229 m. A Murta test (1,150-1,165 m) on oil shows gave no flow to surface and only a small oil recovery. No Namur shows yet. Beach 75%.
Beach announces a drilling program of 69 exploration and appraisal wells in 2006-07, up from 19, costing over A$100m. It targets production above 5 million boe in 2007-08 versus 1.4 million this year. Basker-Manta full field due October at about 12,500 bopd net.