Stockle - the stock oracle

Beach Energy Ltd

ASX:BPT
A$0.835Close 7 Oct 2026 · delayed

Past year: ▼ 33%(83.5c – 1.29 AUD)

Market cap
A$1.90bn
Shares on issue
2.28bn
In-ground value
A$2.78bn
Risked multiple
0.52×
Story beats
539 since 2006
Last event
6 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

6 Sept 2006asset acquisition disposition● Neutral

Westpac, as manager of the FIELDS notes, says Beach's Delhi acquisition triggers redemption at A$100 per note plus a A$3.26 special payment. Holders may redeem, take Beach or Delhi Holdings shares, or retain. A A$300m letter of credit backs redemption until 28 February 2007.

Discuss in chat

1 Sept 2006other▲ Good

S&P announces Beach Petroleum will be added to the S&P/ASX 200 index, effective close of trade 15 September 2006. This is an index change, not a company operating event.

Discuss in chat

31 Aug 2006drilling scheduled● Neutral

Cooper Energy says Snowden-1 in PEL 92 (Beach 75% operator, Cooper 25%) will spud 1 September to 1,906 m. It estimates P50 undiscovered oil of 0.8 mmbbl in the Namur and 0.4 mmbbl in the Birkhead/Hutton, with a 25% chance of success.

Value this in the calculator →Discuss in chat

30 Aug 2006drilling result● Neutral

Sunshine Gas reports its UK Wellington 1 well found no hydrocarbons and will be abandoned. It says the Champagne Creek 2 Deep well, part of the Beach farm-in, will be drilled in September. This is not a Beach well.

Value this in the calculator →Discuss in chat

29 Aug 2006drilling progress report● Neutral

Weekly report: Tennyson-1 plugged and abandoned after DST-2 gave only 0.03 mmcfd. Kenmore-40 spudded 26 August. Revenue-1's Birkhead flowed 1,100 bopd, with first oil expected mid-September. Tipton West has 43 of 75 wells done.

Value this in the calculator →Discuss in chat

28 Aug 2006well test result▲ GoodMajor

Stuart Petroleum reports Revenue-1 (Beach 33.3%) flowed about 1,100 bopd from the Birkhead Formation, a zone with only weak shows while drilling. The well will be completed as a three-zone producer, with first oil from mid-September. This follows the earlier McKinlay oil find.

Discuss in chat

25 Aug 2006drilling result▼ BadMajor

Tennyson-1's second test flowed only about 37,000 cubic feet a day of gas, which was judged uneconomic, so the well is being plugged and abandoned. It is a dry hole for Beach, which was funding it to earn 50%. Great Artesian says Middleton-1 and Udacha-1 tests start later this month; a Cooper Basin oil drilling program from mid-October is also outlined.

Value this in the calculator →Discuss in chat

23 Aug 2006security holder rights change● Neutral

Letter to option holders about expiry of the options on 30 September 2006. Only the address block is readable, so no terms or figures are available. These are the A$1.00 options already known to expire on that date.

Discuss in chat

23 Aug 2006drilling progress report● Neutral

Great Artesian report: Tennyson-1 logs show a possible gas-bearing sand at 2,695-2,706 m in the Patchawarra. A second test (DST-2) is expected on 24 August. No result yet.

Value this in the calculator →Discuss in chat

22 Aug 2006drilling progress report● Neutral

Great Artesian report: Tennyson-1 reached its planned total depth of 2,860 m on 21 August and wireline logs are being run. Zones with elevated gas readings will be assessed. No result yet.

Value this in the calculator →Discuss in chat

22 Aug 2006drilling progress report● Neutral

Weekly report: Tennyson-1 reached 2,860 m; DST 1 recovered only gas-cut mud, and a second test is set for 24 August. Kenmore-39 found 3 m of oil pay and flowed 2,400 bopd in a clean-up. Kenmore-35 is producing 180 bopd; Tipton West has 39 of 75 wells done.

Value this in the calculator →Discuss in chat

21 Aug 2006drilling progress report▼ Bad

Great Artesian report: Tennyson-1's first test (DST-1) at about 2,722-2,724 m produced no gas to surface, only gas-cut muddy water and 6 barrels of fluid. Drilling continues to total depth, with other gassy zones to be logged.

Value this in the calculator →Discuss in chat

18 Aug 2006drilling progress report▲ Good

Tennyson-1 at 2,724 m in the Patchawarra hit a sand with elevated gas readings and fluorescence. A drill stem test (DST #1) will be run over the weekend. Result pending.

Value this in the calculator →Discuss in chat

17 Aug 2006resource reserve update▲ GoodMajor

Independent audit lifts Basker-Manta proved-plus-probable oil reserves 33% to 39.2 million barrels; with gas and condensate contingent resources, total is 118 mmboe, up 240% from 49.3. Capital cost now A$330m; oil production of 25,000 bopd expected mid-October.

Value this in the calculator →Discuss in chat

17 Aug 2006drilling progress report● Neutral

Great Artesian daily report: Tennyson-1 at 2,575 m in the Patchawarra, drilling ahead to total depth while evaluating all reservoirs. No result yet.

Value this in the calculator →Discuss in chat

15 Aug 2006drilling progress report● Neutral

Weekly report: Tennyson-1 at 2,289 m; Kenmore-39 spudded 11 August, at 1,118 m. Sellicks-2 connected, stabilised at 250 bopd, expected to exceed 500 bopd after artificial lift by end August. Tipton West 35 of 75 wells done.

Value this in the calculator →Discuss in chat

11 Aug 2006farm in farm out agreement▲ GoodMajor

Anzon, Beach's 50% Basker-Manta partner, agrees to earn 15% of New Zealand permit PEP 38259 by funding part of the Cutter-1 well. Beach is listed with 20%, though the announcement does not say when it acquired this. Ocean Patriot will drill around October; subject to documentation.

Value this in the calculator →Discuss in chat

8 Aug 2006drilling result● Neutral

Weekly report: Callawonga-1 completed in the Namur and flowed 2,640 bopd on a 2-hour clean-up; rig released. Kenmore-38 had no net pay and was plugged and abandoned (dry). Kenmore-39 due to spud ~10 August; Tipton West has 31 of 75 wells completed.

Value this in the calculator →Discuss in chat

7 Aug 2006drilling spud● Neutral

Tennyson-1 spudded 6 August in PEL 106, Beach operating and funding it fully to earn 50% under the May 2006 farm-in. Targets Patchawarra, likely gas/condensate; in-place estimate 2-15 bcf; planned depth 2,840 m. First of three wells plus 3-D seismic.

Value this in the calculator →Discuss in chat

2 Aug 2006resource reserve update▲ GoodMajor

Cooper reports Callawonga-1 cased as a future Namur oil producer, with P50 recoverable of 1.6 million barrels (100% basis), range 1.1-2.3. Production expected mid-4Q2006. Snowden-1 and Somerton-1 follow. Beach 75% operator.

Value this in the calculator →Discuss in chat

2 Aug 2006resource reserve update▲ Good

Cooper Energy, Beach's 25% partner in Callawonga, put its own P50 estimate for Callawonga-1 at 1.6 million barrels (0.4 million its share), lifting its discovered reserves 50% to about 1.2 million barrels. It expected production in the final quarter of 2006 and Snowden-1 to spud in about three weeks.

Value this in the calculator →Discuss in chat

1 Aug 2006other● Neutral

Westpac, responsible entity of the Australian Onshore Energy Fund, confirms Beach's expression of interest is the unsolicited offer it told Santos about. It regards the offer as incomplete.

Discuss in chat

1 Aug 2006other▲ Good

Great Artesian expects A$3-4m revenue in the first half and says Beach resumed Kiana production. Udacha-1 and Middleton-1 will be production tested this month; Tennyson-1 spuds this month. Beach holds 19.9% of Great Artesian.

Discuss in chat