Stockle - the stock oracle

Bass Oil Limited

ASX:BASOASX:BAS
A$0.001Latest close held · delayed

Past year: ▲ 82%(3.30c – 6.50c AUD)

Market cap
—
Shares on issue
0
In-ground value
A$2.09bn
Risked multiple
under review
Story beats
168 since 2006
Last event
3 Sept 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

3 Sept 2026drilling result▲ GoodMajor

Logs and mud logs show a third oil zone, the M sand, in Bunian 6. It has not been seen before in the Bunian field but is the main producing zone in the neighbouring Tangai field. It will be tested when the well starts; reserve impact is yet to be quantified.

Value this in the calculator →Discuss in chat

26 Aug 2026drilling result▲ GoodMajor

Bunian 6 reached 1,807.9 m and logs show oil pay in the TRM3 and K1 sandstones, in line with pre-drill expectations. It will be completed as a producer and come online in early September, targeting field output rising from 250 to 750 bopd. Well flow rates are not yet tested.

Value this in the calculator →Discuss in chat

21 Aug 2026drilling progress report● Neutral

A replacement top drive got Bunian 6 drilling again, reaching 1,573 m of a planned ~1,820 m. Logging and completion are now expected by end of August, with production shortly after. No result yet.

Value this in the calculator →Discuss in chat

20 Aug 2026production update● Neutral

July sales were A$405,527 as rain stopped Cooper trucking, though output held at 221 bopd. Trucking restarted in August (1,548 barrels at A$125.04). Vanessa engineering continues with a pipeline survey due September; Kiwi 3D reinterpretation is encouraging.

Discuss in chat

14 Aug 2026drilling progress report▼ Bad

Bunian 6 casing was cemented and the wellhead and blowout preventers tested, but the rig stopped at 1,257 m to repair the top drive hydraulics. Drilling of the final section is yet to restart. Online still stated as late August, which now looks tight (inference).

Value this in the calculator →Discuss in chat

7 Aug 2026drilling progress report● Neutral

Bunian 6 was drilled to 1,257 m, the intermediate casing depth, and the rig was running the 9-5/8 in casing. Next: cement it and drill the production hole to about 1,820 m. Online still stated as late August. No result yet.

Value this in the calculator →Discuss in chat

31 July 2026drilling progress report● Neutral

Bunian 6 drilling resumed after the mud pump fix and reached 1,144 m. Intermediate casing point is now about 1,300 m, then the production section to about 1,820 m. Online still expected late August.

Value this in the calculator →Discuss in chat

28 July 2026quarterly activities report▲ Good

June quarter oil sales were A$2.67m at an average A$143.49 per barrel, up 132% on March, helped by selling stored Cooper oil. Cash was A$3.18m, debt free. Vanessa completed; Bunian 6 now expected online late August.

Discuss in chat

24 July 2026drilling progress report● Neutral

A replacement mud pump was installed at Bunian 6 and was being tested at 1,012 m before drilling resumes. Plan is to finish this section to about 1,440 m, then set casing. Online still late August.

Value this in the calculator →Discuss in chat

17 July 2026drilling progress report▼ Bad

Bunian 6 drilling is suspended at 1,012 m awaiting replacement mud pumps, with restart expected around 24 July. The online date moves from early July to late August, a delay to the extra production Bass is targeting.

Value this in the calculator →Discuss in chat

17 July 2026production update● Neutral

June sales revenue was A$561,477, with group output averaging 225 bopd. Cooper sales were cut by rain closing roads. Bunian 6 is now due online late August, later than the early July previously given. Vanessa completed mid-June.

Discuss in chat

10 July 2026drilling progress report▼ Bad

Bunian 6 reached 1,012 m, only 117 m of progress in the week, and the rig stopped for mud pump repairs. The report still says online early July, though the drilling has not reached the casing point.

Value this in the calculator →Discuss in chat

3 July 2026drilling progress report● Neutral

Bunian 6 was drilled from 403 m to 895 m this week, heading for about 1,400 m before intermediate casing. Total depth is still about 1,820 m. The report still says online in early July, which looks unlikely given the depth so far (inference).

Value this in the calculator →Discuss in chat

26 June 2026drilling progress report● Neutral

Bunian 6 surface casing cementing was completed and the blowout preventer installed and tested after some rig repair downtime. Drilling the next section from 403 m continues. Online date still stated as early July. No result yet.

Value this in the calculator →Discuss in chat

24 June 2026other● Neutral

Bass released the top 20 holder and distribution schedule for the new quoted BASOD options (A$0.0945, expiring 23 June 2028 per the announcement). 31,746,033 options were issued; PAC Partners holds the largest parcel, 2,817,444 (8.87%). Completes the 29 May prospectus offer.

Discuss in chat

19 June 2026drilling progress report● Neutral

Bunian 6 was drilled to 403 m and surface casing was run and cemented. Target depth is still about 1,820 m, with production expected to rise from 250 to 750 bopd, online early July. No result yet.

Value this in the calculator →Discuss in chat

17 June 2026asset acquisition disposition▲ GoodMajor

Bass completed the acquisition of 100% of the Vanessa gas field (PPL 268 and PRL 135) after South Australian regulator approval, the last step pending since the earlier transfer paperwork. First gas sales are expected by end 2026 after recommissioning.

Discuss in chat

15 June 2026production update● Neutral

May output averaged 219 bopd; sales revenue A$735,630. Bunian 6 began drilling 5 June. The Vanessa transfer is still with the regulator for finalising, and the Kiwi grant deed was signed in May. Dundinna seismic reprocessing is almost complete.

Discuss in chat

12 June 2026drilling progress report● Neutral

Bunian 6 was drilling ahead at 193 m on 12 June, heading to a surface casing depth of 410 m. Target depth remains ~1,820 m, with production still expected to rise from 250 to 750 bopd in early July. No new result yet.

Value this in the calculator →Discuss in chat

9 June 2026drilling spud▲ GoodMajor

Drilling of Bunian 6 in Indonesia began 5 June, about a month later than the 'early May' timing previously given. It targets ~1,820 m over about 30 days, aiming to lift field output from 250 to 750 bopd, online early July. Bass (55%) rates success at 80%; cost recoverable.

Value this in the calculator →Discuss in chat

2 June 2026other● Neutral

Bass launched an online Investor Centre for shareholders to access announcements and engage with the team. Administrative; no operational or financial news.

Discuss in chat

29 May 2026other● Neutral

Target market determination for the placement options offered under the 29 May prospectus (A$0.0945 exercise, expiring 9 June 2028). It is a compliance document; it adds no new business information.

Discuss in chat

29 May 2026capital raising announcement● Neutral

Bass lodged a prospectus offering the free options attached to the March A$3m placement: one A$0.0945 option per two shares, plus 7,936,508 options to lead manager PAC Partners. Offer closes 5 June, with options due to be issued 9 June. Completes the March placement terms.

Discuss in chat

27 May 2026material agreement▲ GoodMajor

Bass signed the Deed for the A$3.5m South Australian Government grant for the Kiwi gas pipeline, with 25% advanced on signing. This resolves the earlier condition on signing a grant agreement. Final investment decision is targeted for late 2026; balance funding still being pursued.

Discuss in chat

18 May 2026production update▲ Good

April sales revenue was A$1,345,276, up 245% on March, from selling stored Cooper oil at A$168.64 per barrel plus Indonesian sales at US$111.45. Production averaged 209 bopd. Bunian 6 rig on location, spud expected by month end; Vanessa transfer still awaiting approval.

Discuss in chat

14 May 2026investor presentation● Neutral

May 2026 AGM presentation. Visible text is only the disclaimer, so no new facts can be drawn; it presumably repeats known Vanessa, Kiwi and Indonesian news.

Discuss in chat

28 Apr 2026quarterly activities report● Neutral

March quarter sales were A$1.14m on 19,519 barrels (217 bopd), hit by rain-halted Cooper trucking. Cash rose to A$3.46m after the A$3m placement; debt free. Vanessa bond lodged, transfer pending; Bunian 6 to spud in May.

Discuss in chat

21 Apr 2026production update● Neutral

March output averaged 194 bopd; sales revenue A$389,313 as heavy rain blocked Cooper Basin trucking. Trucking resumed early April with 2,197 barrels sold at A$186.38 (A$450,944). Vanessa bond has been lodged with the regulator, transfer paperwork being finalised.

Discuss in chat

16 Apr 2026drilling scheduled▲ GoodMajor

The rig is mobilising for Bunian 6 in Indonesia, with drilling due to start in early May and the well online in mid June. Bass (55%) rates success at 80%, targeting about 1,820 m, lifting field output from 250 to 750 bopd. Costs are recoverable against existing production.

Value this in the calculator →Discuss in chat

31 Mar 2026director officer appointment● Neutral

Non-executive director Mark Lindh resigned after 12 years on the board, to focus on other business interests. He said he remains an enthusiastic shareholder. The board now has Chairman Hector Gordon, MD Tino Guglielmo and Laura Reed.

Discuss in chat