Stockle - the stock oracle

Bass Oil Limited

ASX:BASOASX:BAS
A$0.001Latest close held · delayed

Past year: ▲ 82%(3.30c – 6.50c AUD)

Market cap
—
Shares on issue
0
In-ground value
A$2.09bn
Risked multiple
under review
Story beats
168 since 2006
Last event
3 Sept 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

5 Apr 2006drilling progress report● Neutral

Pritchard-1 reached 1333m. The top of the Pebble Point Formation was hit at 1311m as predicted, but no significant shows were reported; drilling continues deeper.

Value this in the calculator →Discuss in chat

28 Mar 2006drilling spud● NeutralMajor

Pritchard-1 spudded at 1900 hours on 27 March 2006 and reached 239m by the next morning, drilling ahead. This starts the first well in Bass Strait Oil's new Otway Basin farm-in.

Value this in the calculator →Discuss in chat

28 Mar 2006drilling spud● Neutral

Bass Strait Oil confirms Pritchard-1 began drilling and was at 239m. It earns the right to a 25% interest in PEP 151 by contributing to the well, plus a right to 15% of adjacent PEP 150.

Value this in the calculator →Discuss in chat

24 Mar 2006drilling scheduled● Neutral

Operator says Pritchard-1 rig-up is ahead of schedule, with spud expected 26 March 2006 and first casing point of 850m by 30 March. Repeats the 50/25/25 interest split.

Value this in the calculator →Discuss in chat

20 Mar 2006drilling scheduled● Neutral

Operator Essential Petroleum says preparations for Pritchard-1 are complete and the rig is mobilising, with spud expected early next week. If interests are taken up, PEP 151 would be split 50% Essential, 25% Bass Strait Oil, 25% Inland Oil.

Value this in the calculator →Discuss in chat

20 Mar 2006drilling scheduled● Neutral

The drilling rig for Pritchard-1 is due to be released from its current well, with drilling now expected to start next week. A further short timing slip for the PEP 151 well.

Value this in the calculator →Discuss in chat

1 Mar 2006drilling scheduled● Neutral

Pritchard-1 in PEP 151 is now expected to start drilling around 20 March 2006, depending on rig availability. Target depth is about 1300 metres, and Bass Strait Oil can earn 25% by contributing to the well.

Value this in the calculator →Discuss in chat

9 Feb 2006farm in farm out agreement● Neutral

Operator Essential Petroleum says Inland Oil Resources will also earn 25% of PEP 151 by funding Pritchard-1, alongside Bass Strait Oil's 25%. Pritchard-1 targets 4 million barrels at the Pebble Point level, with a deeper 10 million barrel target.

Value this in the calculator →Discuss in chat