History

Australis bought Encana's Tuscaloosa Marine Shale acreage in 2017, drilled it with debt and equity, wrote it down in 2020, then found a drilling partner and sold its producing wells in 2025.

2016-2017: Listing and the Encana purchase

Australis Oil & Gas was admitted to the ASX on 21 July 2016, after an IPO that raised $30 million by issuing 120 million shares at $0.25. It set out to develop the Tuscaloosa Marine Shale (TMS) in Louisiana and Mississippi, and also held licences in Portugal. In January 2017 independent estimates roughly doubled: the best-estimate TMS contingent resource (oil not yet cleared for production) rose 104% to 26.4 million barrels on about 19,000 net acres.

The company then made a much larger move. Shares were suspended at its own request in late February, and on 28 February 2017 it agreed to buy all of Encana's TMS assets for US$80m. The deal added 62,000 net core acres and about 1,900 barrels a day of production, lifting the core position to 81,000 net acres. It was funded by a A$100m placement of 434.78 million shares at A$0.23, completed in April. The price was adjusted to US$68.3m, mainly for net oil sales since November, and the purchase settled on 13 April 2017 with about US$22m of net cash left.

2018-2019: Drilling the first wells

Year-end 2017 estimates booked the company's first undeveloped reserves, with 46.6 million barrels in the 2P (proved plus probable) category. In March 2018 a placement of 115.28 million shares at A$0.34 raised about A$39.2m, and in June a three-year US$75m term facility was signed with Macquarie. A Nabors rig was contracted, and the first well of the program, Bergold 29H-2, started drilling on 29 September 2018. It hit unstable rock and a stuck drill assembly and was completed on about 2,000 feet of sideways section, while Stewart 30H-1 went well, producing 1,177 barrels a day over its first 30 days, 34% above the expected curve, at a cost of US$10.3m.

In February 2019 the company raised A$30.5m by placing about 87 million shares at A$0.35, with demand well above the shares available. Results were mixed. Williams 26H-2 also suffered equipment trouble and a shortened lateral, while Taylor 27H-1 averaged 1,105 barrels a day. By the end of 2019 a later review of the six initial wells found early output 9% above the expected curve, but only 57% of planned lateral length on average. Macquarie amended the facility in December, with debt at US$34m and cash at US$18m, and the company began seeking industry partners to fund development.

2020-2024: Writedown and the long partner search

In April 2020, after the oil price fall, Australis repaid US$10m to Macquarie, the undrawn US$40m was cancelled, leasing and capital spending stopped, and cash fell to about US$4m. First-half results showed a non-cash impairment of US$126.7m and a net loss of US$125.8m. The company also relinquished its Portuguese licences from 30 September 2020. Year-end 2020 estimates cut 2P reserves 66% to 21.0 million barrels because the assumed drilling plan shrank from 180 to 58 wells; the oil was reclassified rather than lost.

In March 2021 the company raised A$8.175m at A$0.05 a share, with a share purchase plan of up to A$2m, to restart leasing and fund partner talks. In the following years no undeveloped reserves were booked because no partner was secured. Acreage shrank from about 98,000 net acres in early 2022 to 61,400 by early 2024, and the resource estimate fell from 120 to 89 million barrels. Macquarie added a new Facility C in late 2023, and US$6m was drawn in March 2024, with part used to pay down Facility A and the rest as new cash. By January 2025 acreage was 48,000 net acres, the resource was 65 million barrels, and partner diligence continued.

2025-2026: A partner at last

On 27 November 2025 two deals ended the search. A US-listed partner can earn 80% of about 46,100 net undeveloped acres by funding a US$46.25m program of wells, with Australis's 20% carried. Separately, 90% of the producing well interests were sold to EQV, a deal that closed on 30 December 2025 at US$15.6m after adjustments. Macquarie was repaid in full and the facilities terminated. EQV took over operating the producing wells, and the sale cut producing reserves to 124 thousand barrels.

On 29 July 2026 the company reported that the first carry well, Willson 1H, a planned 10,000-foot lateral, had its permit approved on 15 July and that the partner had confirmed it would drill and complete it, targeted for Q4 2026 subject to rig availability. A permit for the second well, Mathieu 1H, was approved on 19 August. As of the latest report, cash was US$11.2m with no debt, after US$1.3m was paid to EQV.

Written from the 39 story beats below (2016 to 29 July 2026), which come from the company's own announcements and filings.

Beat by beat

The events that changed the company's story, in plain English, each written against everything known about the company at the time. The dot shows whether it was good, bad or neutral for shareholders.

shares on issue market cap (log scale)

20261.39bn shares · A$20.9m market cap

  1. 29 July

    June quarter 2026: Willson 1H permit approved on 15 July, and the partner has confirmed it will drill and complete the well, targeted for Q4 2026 subject to rig availability. This resolves the earlier uncommitted spud date. Cash fell to US$11.2m from US$13.6m, after US$1.3m paid to EQV; no debt.

    quarterly activities report

    1.39bn shA$20.9m
  2. 2 July

    Permit application lodged for Willson 1H, the first well in the US$46.25m carried program, with a hearing on 15 July 2026. Planned as a 10,000-foot lateral; Australis holds 88% of the unit for now. Partner has not confirmed a spud date, but Q4 2026 is preserved.

    regulatory community update

    1.39bn shA$20.9m
  3. 30 Jan

    December quarter 2025 and year-end reserves: 2P+2C resource trimmed to 62 MMbbl from 65, and producing reserves fall to 124 Mbbl (NPV10 US$2.4m) after the EQV sale. Cash US$14.2m, no debt. Sales 48,900 bbl.

    resource reserve update

    1.39bn shA$29.2m

20251.33bn shares · A$20.0m market cap

  1. 31 Dec

    The EQV sale closed on 30 December 2025: 90% of producing well interests transferred, final price US$15.6m after adjustments. Macquarie Facilities A and C repaid in full and terminated. EQV takes over operations; first drilling with the partner is being prepared.

    asset acquisition disposition

    1.33bn shA$20.0m
  2. 27 Nov

    Two deals end the long partner search. A US-listed partner can earn 80% of about 46,100 net undeveloped acres by funding about US$46m of wells, carrying Australis's 20%. Separately, 90% of producing well interests sold to EQV for US$16.9m, allowing full debt repayment and about US$12m pro forma cash.

    farm in farm out agreement

    1.33bn shA$13.3m
  3. 31 Jan

    Year-end 2024 Ryder Scott update: 2P+2C resource cut to 65 MMbbl from 89, PDP reserves 1,624 Mbbl with NPV10 US$38m (from US$47m). Acreage 48,000 net. December quarter EBITDA US$0.8m, cash US$6.2m, debt US$8.4m. Partner diligence continues.

    resource reserve update

    1.29bn shA$12.9m

20241.28bn shares · A$19.2m market cap

  1. 7 Mar

    Australis drew US$6m under Macquarie's Facility C, paying US$2m off Facility A (now US$6m) for US$4m of new liquidity. Facility A repayments are suspended to 30 September 2024, then US$0.5m a quarter, with maturity May 2026. This completes the December 2023 arrangement.

    debt financing

    1.28bn shA$19.2m
  2. 31 Jan

    Year-end 2023 Ryder Scott update: 2P+2C resource cut to 89 MMbbl from 120, PDP reserves 2,085 Mbbl with NPV10 US$47m (versus US$82m a year earlier). December quarter EBITDA was negative US$0.4m; cash US$3.8m, debt US$8m. Acreage 61,400 net.

    resource reserve update

    1.28bn shA$16.6m

20231.26bn shares · A$21.5m market cap

  1. 8 Dec

    Macquarie agreed a new Facility C, optional to draw by 7 March 2024, expected about US$6m, repaid over 24 months from oil swap hedges. Drawing would cut Facility A repayments to US$0.5m a quarter and extend its maturity to May 2026.

    debt financing

    1.26bn shA$21.5m
  2. 9 Feb

    Year-end 2022 Ryder Scott update: 2P developed reserves 3.14 MMbbl (down 15%); 2C contingent resource 117.06 MMbbl (down 21%), reflecting only reduced leased acreage. PDP NPV10 rose to US$82m on a higher oil price. No undeveloped reserves, as no partner is secured.

    resource reserve update

    1.26bn shA$49.2m

20221.24bn shares · A$61.9m market cap

  1. 7 Feb

    Year-end 2021 Ryder Scott update: 2P developed reserves 3.67 MMbbl (down 11%); 2C contingent resource 148.99 MMbbl (flat). No undeveloped reserves were booked because there is no development plan while the company seeks a partner. Acreage about 98,000 net; five marginal wells sold.

    resource reserve update

    1.24bn shA$61.9m

20211.01bn shares · A$57.5m market cap

  1. 1 Mar

    Australis raises A$8.175m in a placement at A$0.05 (12.3% discount): 150m shares now, plus 13.5m to directors subject to AGM approval. A share purchase plan of up to A$2m follows. Funds go to restarting TMS leasing and working capital, backing partner talks.

    capital raising announcement

    1.01bn shA$57.5m
  2. 5 Feb

    Year-end 2020 Ryder Scott update: 2P reserves fall 66% to 21.0 MMbbl and 1P 79% to 10.4 MMbbl, because the assumed five-year drilling plan shrinks from 180 to 58 wells. 2C rises 15% to 149.4 MMbbl; PDP is 3.7 MMbbl. Oil is reclassified, not lost.

    resource reserve update

    986m shA$55.2m

2020986m shares · A$26.6m market cap

  1. 26 Aug

    First half 2020: revenue US$13.6m and EBITDA US$4.3m, but a non-cash impairment of US$126.7m produced a net loss of US$125.8m. Borrowings US$23m. Australis also told Portugal it will relinquish its Lusitanian Basin licences from 30 September 2020, ending that asset.

    half year report

    986m shA$26.6m
  2. 6 Apr

    After the oil price fall, Australis repaid US$10m to Macquarie, cutting debt to US$23m, and the undrawn US$40m was cancelled, reversing the December 2019 funding extension. Covenants waived to end 2020; cash fell to about US$4m. Leasing and capex stopped, overheads cut a further 40%.

    debt financing

    986m shA$13.8m
  3. 11 Feb

    Ryder Scott year-end 2019 estimate: 1P up 53% to 48.6 MMbbl, 2P up 25% to 62.1 MMbbl, 3P 93.8 MMbbl, 2C up 20% to 129.5 MMbbl. Increase attributed to the 2019 drilling program and 5,000 added acres, updating the 2018 figures.

    resource reserve update

    986m shA$80.8m
  4. 31 Jan

    December quarter: sales 208,000 bbl, revenue US$12.6m (US$52.6m for 2019), cash US$16.1m, debt US$33m. Review of the six initial wells found IP30 9% above type curve but only 57% of planned lateral length on average; partnering talks with industry have started.

    quarterly activities report

    986m shA$80.8m

2019986m shares · A$123m market cap

  1. 23 Dec

    Macquarie facility amended: committed funding stays US$75m, Tranche 1 availability extended to April 2021 and maturity to November 2023, with covenants loosened and a 2% standby fee. Debt is US$34m, cash US$18m; G&A cut 20% and the company is seeking industry partners to fund development.

    debt financing

    986m shA$123m
  2. 4 Dec

    Quin 41-30 3H (2,476 ft lateral) hit IP30 of 414 bopd, above type curve when normalised. Saxby 03-10 2H (4,825 ft) made only 387 bopd, 80 bopd per 1,000 ft against 122 type curve, as 3 of 17 stages barely contributed. Wells 5 and 6 convert 2,800 net acres to HBP.

    well test result

    986m shA$123m
  3. 11 June

    Five of six initial wells are drilled; Stewart 30H-1 has made over 116,000 bbl in 150 days, above type curve. The Quin well will have a shorter lateral after third-party equipment failures. Macquarie lifted Tranche 1 to US$65m (US$20m drawn); a 1-3 month drilling break is being considered.

    drilling progress report

    985m shA$256m
  4. 29 Apr

    March quarter: Taylor 27H-1 averaged 1,105 bbl/d (IP24 1,282) and Williams 26H-2 386 bbl/d, both above type curve (Williams on a normalised basis). Sales volume 206,000 bbl, revenue US$12.4m, cash US$37m; preparing wells 7 to 10.

    quarterly activities report

    982m shA$241m
  5. 5 Apr

    Taylor 27H-1 (20 stages) and Williams 26H-2 (9 stages) began flowback on 2 April. Stewart 30H-1 made 86,500 bbl in 92 days, 35% above type curve. Acreage rises to 115,000 net acres, adding 9 MMbbl 2C (total 206 MMbbl).

    drilling progress report

    982m shA$241m
  6. 27 Feb

    Williams 26H-2 (well 4) hit a failed tool and stuck pipe, so it will be completed on about 3,000 ft of lateral, expected at roughly 40% of type curve. Taylor 27H-1 awaits frac; new drilling fluid is planned from well 5. Stewart 30H-1 still ahead of type curve.

    drilling progress report

    980m shA$314m
  7. 18 Feb

    The A$30.5m placement succeeded, with 87m shares at A$0.35 and demand well above the shares available. Tranche 1 (about 83.9m shares, A$29.4m) settles 27 February; Tranche 2 (about 3.1m shares to the chairman and a director) awaits April AGM approval.

    capital raising announcement

    896m shA$287m
  8. 15 Feb

    Seeks to raise up to A$30.5m via a placement of about 87m shares at A$0.35, a 12.5% discount to last close. Funds go to rig and services flexibility after well six, more core leases and working capital. About A$1.1m from the chairman and a director needs shareholder approval.

    capital raising announcement

    896m shA$287m
  9. 6 Feb

    Ryder Scott year-end 2018 update on 110,000 net acres: 2P reserves rise to 49.7 MMbbl (from 46.6) and 1P to 31.9 MMbbl. 2C contingent resource is 107.8 MMbbl, and PDP value is US$82.8m. This covers the added acreage.

    resource reserve update

    896m shA$287m
  10. 31 Jan

    December quarter: Stewart 30H-1 delivered an IP30 of 1,177 bbl/d, 34% above the type curve, at a provisional cost of US$10.3m (under budget). Cash is US$38m after drawing US$10m of the Macquarie facility. Continuing past six wells is a decision point around end of Q1 2019.

    quarterly activities report

    896m shA$287m

2018896m shares · A$354m market cap

  1. 28 Nov

    Bergold 29H-2 hit unstable formation and a stuck drill assembly; the company will complete it at about 2,000 ft of lateral rather than drill on. Stewart 30H-1 (19,424 ft) was ahead of plan; the rig moves to the Taylor/Williams pad, with frac starting in December.

    drilling progress report

    896m shA$354m
  2. 2 Oct

    The Nabors B14 rig started drilling the Bergold 29H-2 on 29 September 2018, the first well of the initial TMS program. Results for the first pair of wells are expected by late Q1 2019.

    drilling spud

    895m shA$421m
  3. 31 Aug

    Rig contract signed with Nabors for a minimum six wells, with permits for 8 new drilling units. Rig release expected by end-September 2018; a smaller rig began top-hole drilling on 20 August. Funded by US$43m cash plus the undrawn Macquarie facility.

    contract award

    895m shA$430m
  4. 5 June

    Signs a three-year senior secured US$75m term facility with Macquarie (LIBOR+6%), plus 30m options at A$0.49/A$0.51 issued to the lender. Answers the debt-financing thread; with over US$40m cash it funds the initial TMS drilling planned for second half 2018.

    debt financing

    832m shA$362m
  5. 22 Mar

    Placement of 115.28m shares at A$0.34 raises about A$39.2m, a 5.6% discount to the last close. Pro forma cash is about US$47m, to fund 4-10 initial TMS wells from second half 2018. This answers the open financing thread, with debt still being sought.

    capital raising announcement

    717m shA$272m
  6. 30 Jan

    Ryder Scott's year-end 2017 estimate books first undeveloped reserves: 1P 28.9, 2P 46.6 and 3P 60.2 MMbbl net, on a 126-well plan covering about 35% of acreage. 2C resource falls to 98.0 MMbbl from 107 as part moves to reserves. Producing reserves NPV10 is US$79.5m.

    resource reserve update

    714m shA$168m

2017714m shares · A$193m market cap

  1. 18 Apr

    Completion of the Encana TMS acquisition, settled 13 April 2017 for US$68.3m (US$80m less US$11.7m adjustments). Australis now holds 81,000 net core acres and about 1,700 bbl/d from 31 producing gross wells. Resolves the February deal.

    farm in farm out completion

    714m shA$193m
  2. 13 Apr

    Australis completed the A$100m placement of 434.78 million shares at $0.23 to fund the Encana TMS purchase. The price was adjusted down to US$68.3m, mainly for US$10.8m of net oil sales since November. Post-deal net cash is US$22m; March production about 1,700 bbl/d.

    capital raising announcement

    714m shA$193m
  3. 28 Feb

    Australis agreed to buy all of Encana's Tuscaloosa Marine Shale assets for US$80m (before adjustments), adding 62,000 net core acres and 1,900 bbl/d of production, taking its core position from 19,000 to 81,000 net acres. Funded by a conditional A$100m placement at $0.23.

    asset acquisition disposition

  4. 27 Feb

    At its own request, Australis shares were suspended from 27 February 2017 pending an announcement about a proposed material acquisition, following a trading halt on 23 February. The company expects to announce the deal by 28 February.

    listing compliance notice

  5. 25 Jan

    Independent estimates roughly doubled: TMS best-estimate net 2C contingent resource rose 104% to 26.4 million barrels (about 19,000 net acres), and Portugal rose 96% to 458.5 Bcf. Ryder Scott replaced the earlier engineer for the TMS assessment.

    resource reserve update

2016

  1. 21 July

    ASX admitted Australis Oil & Gas to the official list on 21 July 2016, with trading to start 25 July. The IPO raised $30 million by issuing 120 million shares at $0.25; 279,585,663 shares are quoted, with escrowed shares and options.