Stockle - the stock oracle

88 Energy Limited

ASX:88EOASX:88E
A$0.009Latest close held · delayed

Past year: ▼ 2%(1.80c – 3.60c AUD)

Market cap
—
Shares on issue
0
In-ground value
A$42.10bn
Risked multiple
under review
Story beats
237 since 2006
Last event
31 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

13 May 2025admin correction● Neutral

Updated Appendix 3A.3 confirming the completed consolidation, with final post-consolidation figures adjusted for fractional rounding (1,157,350,417 shares). Administrative update with no new news.

Discuss in chat

13 May 2025security holder rights change● Neutral

The 1-for-25 consolidation is complete: shares fall from about 28.93bn to about 1.157bn. Listed options now exercise at A$0.1875 and warrants at £0.0975. Completes the process approved on 6 May.

Discuss in chat

6 May 2025security holder rights change● Neutral

Shareholders approved the 1-for-25 share consolidation on 6 May 2025, as proposed in April. Post-consolidation trading starts on a deferred settlement basis on 8 May.

Discuss in chat

4 Apr 2025security holder rights change● NeutralMajor

Proposes a 25-for-1 share consolidation, cutting about 28.9bn shares to about 1.157bn, subject to shareholder approval at the 6 May 2025 AGM. Options and warrants are adjusted too; listed option exercise price goes from A$0.0075 to A$0.1875.

Discuss in chat

31 Mar 2025joint venture update▲ Good

Burgundy paid the final US$2.2m (A$3.4m) of the overdue Hickory-1 flow test cash call, on top of US$1m in February, settling the balance. Cash is now over A$10m. The Phoenix horizontal well is planned for mid-2026, and the carry still depends on Burgundy raising capital in 2025.

Discuss in chat

11 Mar 2025annual report● Neutral

Appendix 4G and corporate governance statement for 2024, lodged with the annual report. Administrative filing with no company news.

Discuss in chat

11 Mar 2025annual report● Neutral

2024 annual report. The chairman says the share price has not reflected technical successes such as the Hickory-1 flow test, Leonis resource and ten Namibian closures. The visible text shows no new financial figures.

Discuss in chat

18 Feb 2025investor presentation● Neutral

February 2025 investor presentation; the visible text is only the disclaimer and cover, with no new figures or news.

Discuss in chat

17 Feb 2025farm in farm out agreement▲ GoodMajor

Binding terms agreed for Burgundy to fund up to US$39m of Phoenix costs for up to 50% more interest. Phase 1 (US$29m) carries the 2025/26 horizontal well and cuts 88E from ~75% to 35%. This resolves the Burgundy carry talks, but depends on Burgundy raising capital in 2025.

Value this in the calculator →Discuss in chat

30 Jan 2025resource reserve update▲ GoodMajor

Maiden internal prospective resource for the Canning prospect at Leonis: 283 MMbbl net mean (unrisked). Combined with the Upper Schrader Bluff prospect, Leonis totals 664 MMbbl net mean. Tiri-1 targets both zones, scheduled H1 2026, depending on finding a farm-out partner.

Value this in the calculator →Discuss in chat

31 Dec 2024joint venture update● Neutral

Burgundy paid US$1m of its US$4m overdue cash call; the deadline for the remaining US$3m moved to 15 February 2025 with a US$100,000 extension fee. Burgundy still wants to carry 88E's 2025/26 costs for extra interest; terms are under review.

Discuss in chat

12 Dec 2024asset acquisition disposition▲ GoodMajor

88E was declared highest bidder on four lease blocks (about 10,203 acres) next to Project Leonis, taking it to 14 leases and about 35,634 acres, targeting a new Canning prospect. Formal award is expected 1H 2025; a well is planned for 1H 2026.

Discuss in chat

10 Dec 2024drilling result▲ Good

Monitor's first interpretation of the PEL 93 seismic confirms 10 structural closures, some up to about 100 km2. 88E must validate this independently; a prospective resource estimate is targeted for 1H 2025. Further seismic is possible, including over a new lead 11.

Value this in the calculator →Discuss in chat

31 Oct 2024drilling result▲ Good

Processing of the 203 line-km of PEL 93 seismic is finished, showing good data quality and significant structures not yet interpreted in-house. Interpretation with partner Monitor starts soon; a maiden prospective resource is now aimed for Q1 2025 (earlier guidance said H1 2025).

Value this in the calculator →Discuss in chat

10 Oct 2024investor presentation● Neutral

October 2024 presentation repeating the September Phoenix resource upgrade (378 MMBOE gross 2C) and farm-out plans. Shows 28.9bn shares, share price A$0.002 and market cap about A$57.9m. Nothing new on operations.

Discuss in chat

18 Sept 2024resource reserve update▲ GoodMajor

Independent ERCE contingent resources for the SMD-B and SFS reservoirs add 128 MMBOE gross (81 net) to Phoenix, lifting 2C by over 50%. Combined with the BFF, Phoenix 2C is about 378 MMBOE gross (239 net). Formal farm-out to start Q4 2024.

Value this in the calculator →Discuss in chat

2 Sept 2024half year report● Neutral

Half-year report to 30 June 2024. The visible text recaps the Hickory-1 flow test results (peak ~70 and ~50 bopd) and the Texas production assets; the truncated text shows no new figures.

Discuss in chat

19 Aug 2024joint venture update● NeutralMajor

Partner Burgundy committed to pay US$0.35m soon, and 88E extended its standstill on the roughly US$3m flow-test cost to 31 Dec 2024, rather than taking half of Burgundy's interest. Burgundy is also in talks to carry 88E's 2025/26 horizontal well costs for more interest; no guarantee. Contingent resource due Q4.

Discuss in chat

26 July 2024other● Neutral

Amended securities trading policy adopted from 26 July 2024, replacing the July 2016 policy. Administrative notice with no company news.

Discuss in chat

24 July 2024drilling progress report▲ Good

PEL 93 seismic finished on time and within budget: 203 line-km acquired, which meets the licence commitment for the renewal period. Interpretation expected Q4 2024, leading to a certified prospective resource. Neighbour Recon Africa spudded Naingopo-1 on 7 July.

Value this in the calculator →Discuss in chat

8 July 2024drilling progress report● Neutral

2D seismic acquisition has begun on Namibia's PEL 93 (88E 20% WI), about 200 line-km by Polaris, due to finish in Q3 2024. Follows the May contract award. A neighbouring operator is about to spud the first of up to four wells.

Value this in the calculator →Discuss in chat

4 June 2024resource reserve update▲ GoodMajor

Maiden internal prospective resource for Project Leonis (100% WI): net mean 381 MMbbl of oil in the Upper Schrader Bluff, from the Tiri prospect. Permitting has begun for the Tiri-1 well; drilling depends on a farm-out partner, with no guarantee one is found.

Value this in the calculator →Discuss in chat

10 May 2024contract award▲ GoodMajor

The 200-line-km 2D seismic program on Namibia's PEL 93 was awarded to Polaris, already paid for under the Monitor farm-in. Acquisition starts mid-2024 and finishes Q3, with processing in Q4. A first well is possible as early as 2H 2025.

Discuss in chat

24 Apr 2024capital raising announcement● NeutralMajor

Raised A$9.9m before costs through a placement of 3.29bn shares at A$0.003, a 40% discount to the last close. Same size as the November 2023 raise, at a lower price. Funds the Hickory-1 costs, resource work and Namibia. Company says it is funded for 12 months.

What it means for a shareholder

3.29bn new shares at A$0.003 to raise about A$9.9m. That's 12% dilution: every existing holder's slice gets 12% smaller. If you held A$1,000 of shares (333,333 at the issue price), your slice goes from 0.00133% to 0.00117% of the company. To keep it you'd need 43,651 more shares - about A$131 at the issue price.

Create a free account to see this worked out for your own holding.

Discuss in chat

19 Apr 2024flow test result● Neutral

Clarifies the Hickory-1 results: Upper SFS had only ~10.5 hours of established flow (~19 bbl oil), and SMD-B flowed oil over ~16 hours (~4 bbl). The 70 and 50 bopd peaks were instantaneous rates. Plans are resource work, a farm-out and early production design.

Discuss in chat

17 Apr 2024investor presentation● Neutral

April 2024 investor presentation. The visible text is only the disclaimer; no new information is shown.

Discuss in chat

15 Apr 2024flow test result▲ GoodMajor

Hickory-1 SMD-B flowed light oil at a peak of ~50 bopd (~39 API) under nitrogen lift, a second oil flow after the Upper SFS. Contingent resource assessment for the SFS and SMD is expected in 2H 2024, with farm-out and/or early low-capital production under consideration.

Discuss in chat

2 Apr 2024flow test result▲ GoodMajor

Hickory-1 Upper SFS flowed light oil naturally, peaking at over 70 bopd (~40 API) from a 20ft interval. This is the first oil flowed to surface in 88E's Alaska projects. The company will seek a contingent resource for the Upper and Lower SFS. SMD-B test follows.

Discuss in chat

28 Mar 2024annual report● Neutral

2023 annual report. The chairman's letter restates known items: Hickory-1 flow test underway, the 250 MMBOE BFF contingent resource, Leonis certified resource due 1H24, and Yukon acreage divested. The visible text carries no new figures.

Discuss in chat

28 Mar 2024other● Neutral

Appendix 4G corporate governance checklist lodged with the annual report, confirming the governance statement is current at 31 December 2023. Administrative filing with no company news.

Discuss in chat