Each one in plain English, with the numbers worked through for a shareholder.
26 May 2017capital raising announcement● Neutral
Prospectus lodged for the 1-for-4 rights issue at A$0.09 to raise about A$4,846,875. Offer opens 6 June and closes 16 June, with new shares trading from 26 June. This is the formal document for the raising already announced the same day.
Winchester took a 25% interest in Oden A#2, operated by Clear Fork, about 2 miles from White Hat 21#5. It reached 6,730 feet on 13 May with oil and gas shows in Strawn and Ellenburger. Winchester also earned 25% of 400 surrounding acres. Not yet tested.
Gross oil output across the eight CEGX-operated White Hat wells rose to 507 bopd (554 boepd with gas) from 393 bopd in the March quarter, up over 29%. Gains came from the 20#2 Strawn completion and chemical treatments clearing scaling in four wells.
March 2017 quarter: gross output fell to 28,633 barrels from 37,876, which the company attributes to down-hole scaling and downtime. Revenue was US$572,086 at US$49.64 a barrel. Notes the 20#2 Strawn result, the 21#5 drop and the 1 March operatorship change. Acreage unchanged at 19,110.
White Hat 20#2, a poor Ellenburger well in 2016, is pumping 200 bopd from a Strawn Formation sand after a US$110,000 completion shared 50:50 with CEGX. Rate is unstable, but if sustained it is a new shallower oil play across the 19,110 net acres.
Audited annual report for the year to 31 December 2016 lodged, reported in US dollars. It shows 19,110 net acres and 2016 gross oil production of 126,224 barrels (63,112 net), with quarterly output rising to 37,876 barrels in December. Financial statements were not in the extract.
Appendix 4G corporate governance checklist lodged with the annual report for the year ended 31 December 2016. It points to the governance statement on pages 55 to 61 of the annual report. Administrative, no new operating or financial information.
White Hat 21#5 went on production 5 March 2017, averaging 87 bopd in week one and hitting 150 bopd on 9 March, then fell to 25-40 bopd. CEGX is investigating mechanical causes, including chemical plugging, and plans chemical treatment. Winchester holds 50%.
Winchester notes a magazine article about it in Resource Global Network, titled 'Australian Junior taking on the Permian Heavyweights', and links to it. Promotional only, with no new operating or financial information.
Winchester granted 5,000,000 unlisted options to three senior consultants (Idstein 3.5m, Gard 1m, Hasanov 0.5m) at A$0.12, expiring 31 January 2022, for nil consideration. Stated purpose is incentive for the extra workload of operating White Hat since 1 March 2017.
The CEGX arrangement on White Hat ended on 1 March 2017. Winchester now holds 75% and operates new wells outside the drilled 40-acre units, covering 7,058 acres; CEGX keeps 25% and operates the eight existing wells. CEGX may drill one more 50:50 well.
Presentation for shareholder meetings in Perth, Sydney and Melbourne, mostly repeating known facts. Cash is A$3.1m, gross output 410 barrels a day, with no debt. It aims for a well every three months funded from cash flow once Winchester operates, possibly using short multi-lateral wells.
December 2016 quarter: gross output 37,876 barrels, revenue US$708,900 at US$49.23 a barrel. 38#1 is making water, 38#2 30-40 barrels a day, and 21#5 spudded. Acreage is unchanged at 19,110. Winchester takes 75% interest and operatorship on 1 March 2017.
Setback: the fracture stimulation on 38#1 broke into a deeper water zone, and it pumps only water at 300-400 barrels a day with no oil. 38#2 settled at 30-40 barrels a day. Winchester plans changed drilling and completion designs when it takes over as operator on 1 March.
White Hat 21#5 spudded on 27 December, the eighth vertical well on the lease. Winchester holds 50% of the US$893,000 budget. It is 1,669 feet east of 21#4, now making 230 barrels a day, with depth of about 7,100 feet expected within 14 days.
Share registry Automic is moving its Perth office to 267 St Georges Terrace from 9 December 2016. Other contact details are unchanged. Administrative notice with no bearing on the company's operations.
Wells 38#1 and 38#2 both found Ellenburger pay similar to the existing wells. 38#2 tested up to 103 barrels a day from its upper interval and awaits pumping. 38#1 kept clogging during tests and will be fracture stimulated. Gross output is about 475 barrels a day.
September 2016 quarter: gross output rose to 35,428 barrels (about 385 a day) from 26,159. Cash fell to about A$4.13m from A$5.5m in August. Net acreage rose to 19,110, and 38#1 and 38#2 were drilled. Winchester becomes operator on 1 March 2017.
Winchester agreed to join CEGX in seven further vertical wells at 50%, all within the high-graded 5,000 acres, to be done by 1 March 2017 when operatorship reverts to Winchester. The seismic model still needs more wells to confirm it. Gross output is 445 barrels a day.
White Hat 38#2 spudded, becoming the seventh vertical well on the White Hat lease. Winchester holds 50%, with a US$893,000 budget shared equally. It is 1,470 feet east of 38#1, with proposed depth of about 7,100 feet targeting the Ellenburger.
White Hat 38#1 reached 7,070 feet on 19 September. After logs and cuttings, the partners cased it to test the Ellenburger, with perforation and acid testing due in a few days. No flow results yet.
Half-year report to 30 June 2016 lodged, in US dollars. Five White Hat wells are producing, 38#1 is drilling, and the 7 days to 7 September averaged 438 barrels a day gross. Cumulative White Hat output exceeds 105,000 barrels. Text is truncated, so financial figures were not seen.
Patterson 1R, the 25% interest well from the Clear Fork seismic deal, is to be plugged and abandoned. Two tests flowed 3 barrels a day and logs showed a depleted Ellenburger. Winchester's share of cost is about US$87,500, below the US$150,000 budget.
CEGX is spudding a sixth White Hat vertical well, 38#1, with Winchester taking a 50% interest. It sits 1,200 feet north-east of the successful 21#4 well, targets the Ellenburger at about 7,000 feet, and is budgeted at US$893,000, shared equally.
Presentation for investor meetings in Sydney, Melbourne and Perth, repeating known facts. Gross output is 462 barrels a day from five wells; cash is A$5.5m. It cites potential for 125 well locations and a 79% pre-tax return at US$45 oil.
White Hat 21#4 averaged 189 barrels of oil a day over its first 11 days at a 95% oil cut. The managing director says it appears as productive as 21#1. Gross output from five wells now exceeds 460 barrels a day.
The Patterson 1R well, in which Winchester holds 25%, spudded on 22 August 2016 and was drilling at 2,800 feet on 24 August. The Ellenburger target is expected at about 6,600 feet.
Winchester will take a 25% interest in the Clear Fork Patterson 1R well on its White Hat lease, operated by Clear Fork with 75%. Winchester's share of the US$600,000 cost is US$150,000. The arrangement arose from Winchester buying seismic data from Clear Fork.
White Hat 21#4 went on production on 28 July 2016, making 145 barrels of oil on 31 July with rates rising. Cost was on budget at US$975,000, so US$487,500 for Winchester's 50%. Logs show about 47 feet of upper pay and 11 feet of deeper pay.
June 2016 quarter: gross output about 287 barrels a day from three wells; White Hat 21#1 has made 62,949 barrels with no decline yet. Cash was about A$6.08m, down from A$6.84m. Net acreage rose to 18,058. White Hat 21#4 is being equipped after good swab tests.