Stockle - the stock oracle

State GAS Ltd

ASX:GAS
A$0.009Close 7 Oct 2026 · delayed

Past year: ▼ 68%(0.90c – 3.10c AUD)

Market cap
A$4.9m
Shares on issue
547m
In-ground value
A$325m
Risked multiple
under review
Story beats
93 since 2017
Last event
13 July 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

27 May 2020security holder rights change● Neutral

1,875,000 unlisted options lapsed. Capital structure is now 146,357,014 ordinary shares plus unquoted options and performance rights. Administrative notice only.

Discuss in chat

16 Apr 2020other▼ BadMajor

Chairman's letter says the company is cutting board and management pay and supplier costs, and tightening focus on reserve-building. First gas is now delayed from 2021 to 2022, which the board attributes to recent events. Both wells are expected to be dewatering again by end of April.

Discuss in chat

1 Apr 2020drilling progress report● Neutral

Field access is restored after the wet season; the board will restart Nyanda-4 and Serocold-1 production tests, expected in April and running up to three months. A desktop study confirmed a viable pipeline route to the Queensland Gas Pipeline (~45km). Talks with potential pipeline partners are progressing.

Value this in the calculator →Discuss in chat

5 Mar 2020half year report● Neutral

Half-year to 31 December 2019: net loss $1,748,529 (prior year $1,054,672). Confirms Dome's 20% entitlement in PL 231 and the new conventional gas pool at Aldinga East-1A. Notes February rain blocked access. Text is truncated, so cash is not shown.

Discuss in chat

12 Feb 2020drilling progress report▼ Bad

Production tests at Nyanda-4 (227 mscf/d peak) and Serocold-1 (started 17 Jan) are stalled by pump problems and heavy rain blocking site access. Aldinga East-1A shows rising wellhead pressure, suggesting gas may be flowing. The company says it has identified fixes.

Value this in the calculator →Discuss in chat

13 Jan 2020production update▼ BadMajor

A flow audit found faulty metering equipment, so previously announced Nyanda-4 rates were overstated; the rate is 120 mscf/d on 13 January, about 2,000 mscf produced in total. This corrects the 156 and 436 mscf/d figures. NSAI engaged as reserve certifier.

Discuss in chat

8 Jan 2020drilling progress report● Neutral

Workover to complete Serocold-1 for production testing has started, with the test due after surface facilities are installed around the end of the following week. The company is cross-checking Nyanda-4 flow rates with a Critical Flow Prover over the break.

Value this in the calculator →Discuss in chat

30 Dec 2019production update▲ Good

Nyanda-4 gas production reported at 436 mscf/day, up from 156 mscf/day on 16 December, with fluid level at 648m. Serocold-1 production test due shortly. Later flow-meter problems found by audit (13 January) showed these rates were overstated.

Discuss in chat

19 Dec 2019capital raising announcement▲ GoodMajor

After the Nyanda-4 results, State Gas accepted a further $500,000 of subscriptions at the same $0.65 per share (about 0.77 million shares), taking the December raising to about $1.5 million. Funds are for additional testing and 2020 pilot planning.

What it means for a shareholder

770,000 new shares at about A$1.95 to raise about A$1.5m. That's 0.532% dilution: every existing holder's slice gets 0.532% smaller. If you held A$1,000 of shares (513 at the issue price), your slice goes from 0.000357% to 0.000355% of the company. To keep it you'd need 3 more shares - about A$6 at the issue price.

Create a free account to see this worked out for your own holding.

Discuss in chat

16 Dec 2019production update▲ GoodMajor

Nyanda-4 was producing 156 mscf/day after two weeks on test, with minimal water. Serocold-1 reached 1,200m with about 27m of net coal and promising permeability. Its production test is expected to start mid to late January.

Discuss in chat

11 Dec 2019capital raising announcement● NeutralMajor

State Gas raised about $1 million through an oversubscribed placement at $0.65 per share (about 1.5 million new shares), led by Morgans. Funds go to assessing the drilling campaign and planning the 2020 pilot program. The price is below June's $0.70 placement.

What it means for a shareholder

1.5m new shares at about A$0.6667 to raise about A$1.0m. That's 1.0% dilution: every existing holder's slice gets 1.0% smaller. If you held A$1,000 of shares (1,500 at the issue price), your slice goes from 0.00104% to 0.00103% of the company. To keep it you'd need 16 more shares - about A$11 at the issue price.

Create a free account to see this worked out for your own holding.

Discuss in chat

10 Dec 2019investor presentation● Neutral

Chairman Cottee's 'State of Play' presentation restates 100% ownership of PL 231, the 13.75 m3/t average at Nyanda-4 and the Target 2021 plan, with reserve certification and permitting both expected by November 2020. Largely repeats known facts.

Discuss in chat

9 Dec 2019admin correction● Neutral

Corrects one sentence in the morning's update: Nyanda-4 bottom hole pressure was reduced 'by' 377 psi, not 'to' 377 psi. Everything else is unchanged and the full text is reissued.

Discuss in chat

9 Dec 2019drilling progress report● Neutral

Serocold-1 spudded 6 December (269m); Nyanda-4 on production test since 4 December, with rising casing pressure suggesting gas desorption. Aldinga East-1A gas sample is 97.88% methane, but permeability testing was impaired by drilling brine absorbed during two months shut-in.

Value this in the calculator →Discuss in chat

3 Dec 2019drilling progress report● Neutral

Serocold-1 expected to spud that weekend with Silver City Drilling Rig 25, drilling and testing in about two weeks. Aldinga East-1A drill stem tests are under way and Nyanda-4 production testing is due to start that week; little gas expected in the first weeks.

Value this in the calculator →Discuss in chat

27 Nov 2019joint venture update▲ GoodMajor

Queensland Court of Appeal struck out Dome's appeal against the 16 September judgment, with indemnity costs to State Gas. This resolves the open thread: State Gas states its ownership of PL 231 is confirmed at 100%, with Dome's 20% transferring for $233,333.

Discuss in chat

27 Nov 2019drilling progress report▲ Good

Nyanda-4 workover finished: pump installed and coals under-reamed, with production test expected before Christmas and lasting 3-6 months. TDC Rig 4 now moves to Aldinga East-1A for drill stem tests. Serocold-1 still targeted before year end.

Value this in the calculator →Discuss in chat

13 Nov 2019drilling result▲ GoodMajor

Aldinga East-1A logging found 10-14m of net coal and a new conventional gas pool in about 9m of Cattle Creek sand, plus a further 9m of gas sand deeper (18m total to 802m). Well suspended for drill stem tests; Serocold-1 design under review.

Value this in the calculator →Discuss in chat

11 Nov 2019other● Neutral

ASX paused trading in State Gas shares pending a further announcement. No reason is given in the text.

Discuss in chat

7 Nov 2019drilling progress report▲ Good

Drilling at Aldinga East-1A was suspended at 882m for wireline logging and permeability testing. TDC Drilling's Rig 4 is mobilising to re-enter Nyanda-4 next week for production testing, with the aim of finishing before the wet season.

Value this in the calculator →Discuss in chat

4 Nov 2019resource reserve update● NeutralMajor

Final Nyanda-4 gas content is 13.75 m3/t average from 10 samples, replacing all prior figures including the 14.6 m3/t reported in July. The thickest seam is 16.94 m3/t. This is a small downward revision to the earlier average.

Value this in the calculator →Discuss in chat

23 Oct 2019drilling result▲ GoodMajor

Coring at Aldinga East-1A finished; the 563.5-649m interval had coal seams and a conventional sandstone reservoir, with gas bubbling from both. Gas then flowed vigorously from the well, so mud weight was raised. Company believes it comes from sandstone and may help project economics.

Value this in the calculator →Discuss in chat

22 Oct 2019investor presentation● Neutral

Morgans Cairns presentation repeating prior releases: 100% of PL 231, Aldinga East-1A spudded 4 October and coal hit at 560m. The text states it contains no new material.

Discuss in chat

18 Oct 2019drilling progress report▲ Good

Coring began at Aldinga East-1A after coal tops were hit at 560m, the shallow end of the 560-600m forecast. Gas was seen bubbling from the drilling mud, as at Nyanda-4. About 150m of core is planned before drilling to 1,200m.

Value this in the calculator →Discuss in chat

8 Oct 2019investor presentation● Neutral

QUPEX presentation by Cottee restating the PL 231 story and forward program, now stating State Gas holds 100%. Presentation repeats known facts; the gas content figures it shows were later replaced by the 4 November advice.

Discuss in chat

4 Oct 2019drilling spud▲ GoodMajor

Aldinga East-1A, the first well of the 2019 program, spudded on 4 October 2019 using Gas Field Services Rig 12, to a planned 1,200m in the northern part of PL 231. Serocold-1 follows. It is the first drilling since Nyanda-4 in 2018.

Value this in the calculator →Discuss in chat

24 Sept 2019annual report● Neutral

2019 Corporate Governance Statement against the ASX Principles (3rd Edition), approved by the board as at 24 September 2019. Administrative; no new operational or financial information in the text shown.

Discuss in chat

24 Sept 2019annual report● Neutral

Annual report for year to 30 June 2019, with Chairman Cottee's letter setting out the three-phase 'Target 2021' strategy. Phase 1 (seismic, drilling, production tests of 3-6 months, pipeline route work) is said to be fully funded. Text is truncated, so financials are not shown.

Discuss in chat

24 Sept 2019joint venture update▼ Bad

Dome, representing itself and absent from the hearing, has appealed the 16 September judgment. State Gas says legal advice is that the appeal is entirely without merit and it will defend it. Drilling is said to be unaffected.

Discuss in chat

24 Sept 2019annual report● Neutral

Appendix 4G governance checklist lodged with the annual report, pointing to the company's website governance statement. Administrative filing with no new substance.

Discuss in chat