Stockle - the stock oracle

Senex Energy Limited

ASX:SXY
A$4.60Latest close held · delayed
No price history held for this listing yet.
Market cap
—
Shares on issue
0
In-ground value
A$897m
Risked multiple
—
Story beats
408 since 2006
Last event
4 Apr 2022

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

30 Jan 2006drilling progress report● Neutral

FAR relays that the Eagle North-1 sidetrack reached 11,285 feet (3,459 metres), with the crew changing bit. Its Schwing A-1 Louisiana well is at 10,984 feet and expected to reach total depth this week. Nothing new for Victoria.

Value this in the calculator →Discuss in chat

30 Jan 2006drilling progress report● Neutral

Victoria reports the Eagle North-1 sidetrack drilled to 3,459 metres, and the crew is changing bit and assembly to drill on toward 4,145 metres. Total depth of 4,206 metres is now planned at 20 days from start. No oil result yet.

Value this in the calculator →Discuss in chat

27 Jan 2006drilling progress report▼ Bad

Victoria reports the stuck drill pipe recovered except 20 metres, with a cement plug being set before sidetracking from about 3,500 metres. Drilling is expected to resume over the weekend. Planned time to total depth is now 17 days.

Value this in the calculator →Discuss in chat

27 Jan 2006drilling progress report▼ Bad

Sun Resources reports Eagle North-1 still at 3,625 metres while a cement plug is set for the sidetrack. Target depth is now expected late the following week, with a further 24-hour pause for crop spraying. A further slip from earlier timing.

Value this in the calculator →Discuss in chat

27 Jan 2006director officer appointment● Neutral

Victoria signed a three-year employment agreement with Managing Director John Kopcheff, backdated to 1 January 2006, paying $330,000 a year including superannuation. If terminated, he gets one month's notice and a payment for the remaining term.

Discuss in chat

25 Jan 2006drilling progress report▼ Bad

Victoria confirms Eagle North-1 pipe stuck at 3,625 metres. It will leave pipe in the hole, set cement and sidetrack from about 3,500 metres, with drilling to resume in roughly 48 hours. The Managing Director calls the delay disappointing; the 20% near-free carry is unchanged.

Value this in the calculator →Discuss in chat

25 Jan 2006drilling progress report▼ Bad

Sun Resources reports Eagle North-1 pipe stuck at 3,625 metres. The pipe is being backed off and a cement plug set to sidetrack around it. Drilling is expected to resume in about 48 hours, so the 25 January total depth timing slips.

Value this in the calculator →Discuss in chat

24 Jan 2006drilling progress report● Neutral

Victoria Petroleum reports Eagle North-1 drilling ahead at 3,540 metres on 24 January, toward a 4,145 metre target and 4,206 metre total depth. No oil result yet.

Value this in the calculator →Discuss in chat

24 Jan 2006drilling progress report● Neutral

Partner FAR reports Eagle North-1 drilling ahead at 11,614 feet (3,540 metres) and Schwing A-1 in Louisiana at 9,935 feet during rig repairs. Repeats earlier figures; nothing new for Victoria Petroleum.

Value this in the calculator →Discuss in chat

24 Jan 2006production update▲ GoodMajor

Gross oil output from the Mirage and Ventura fields in PEL 115 (Victoria operator, 40%) reached a new high of 480 barrels a day. Victoria's total net production is now 455 barrels a day. Interpretation suggests up to 20 million barrels in place; the Mirage-2 well is planned to start about 29 January. Mirage-2 targets 1,000 barrels a day by mid-2006.

Discuss in chat

24 Jan 2006drilling progress report● Neutral

Sun Resources relays that Eagle North-1 was at 3,540 metres on 23 January, with target and total depth expected about 25 January. Restates the 13.5 to 34 million barrel Eagle range. No new result.

Value this in the calculator →Discuss in chat

23 Jan 2006drilling progress report● Neutral

Sun Resources reports Eagle North-1 at 3,386 metres on 22 January, finishing a wiper trip before drilling on. Total depth is now expected around 25 January. No oil result yet.

Value this in the calculator →Discuss in chat

20 Jan 2006drilling progress report● Neutral

Sun Resources reports Eagle North-1 at 2,732 metres, with total depth now expected about 24 January rather than 26 January because of good progress. No oil result yet.

Value this in the calculator →Discuss in chat

20 Jan 2006drilling progress report● Neutral

Victoria Petroleum reports Eagle North-1 drilling ahead at 2,732 metres on 20 January, still aiming for 4,145 metres and a total depth of 4,206 metres. No oil result yet.

Value this in the calculator →Discuss in chat

19 Jan 2006production update● Neutral

Victoria confirms Oilex's rig will convert Rookwood West-1 to a water-injection well in early February, then extended-test Donga-3. It says current net oil production is about 400 barrels a day, and the Surat work would add modest, incremental volumes. Largely repeats the 18 January rig news.

Discuss in chat

19 Jan 2006drilling progress report● Neutral

Victoria Petroleum reports Eagle North-1 drilling ahead at 2,134 metres on 18 January toward a 4,145 metre target. No new result; the Managing Director repeats that success would bring significant cash flow.

Value this in the calculator →Discuss in chat

19 Jan 2006drilling progress report● Neutral

Sun Resources reports Eagle North-1 drilling ahead at 2,134 metres on 18 January, with total depth still expected around 26 January. No oil result yet.

Value this in the calculator →Discuss in chat

18 Jan 2006drilling progress report● Neutral

Sun Resources repeats the operator's report of Eagle North-1 at 1,444 metres on 17 January, with total depth expected around 26 January. It restates the Eagle resource range of 13.5 to 34 million barrels. No new result.

Value this in the calculator →Discuss in chat

18 Jan 2006contract award● Neutral

Operator Oilex has contracted a workover rig from early February for the Rookwood West 1 well, to be converted for water injection, and for an extended test of Donga-3. Victoria Petroleum holds 29.69% of ATP 608P and 15% of ATP 805P.

Discuss in chat

18 Jan 2006drilling progress report● Neutral

Partner FAR reports Eagle North-1 approaching 5,000 feet, with surface casing at 2,995 feet. It also reports its Schwing A-1 Louisiana well at 8,755 feet. Nothing new for Victoria Petroleum.

Value this in the calculator →Discuss in chat

18 Jan 2006joint venture update● Neutral

Operator Bow Energy says the Ensign No. 44 rig is contracted to complete Donga-3 for an extended production test in February 2006. If the flow rate is viable, a full Donga field plan will be considered. Victoria holds 15% of ATP 805P. This repeats the 18 January rig news. Note: it names Bow as operator with Oilex at 42.5%, which differs from earlier context.

Discuss in chat

18 Jan 2006drilling progress report● Neutral

Victoria Petroleum, as operator, reports Eagle North-1 drilling ahead at 1,444 metres on 17 January, heading for a target near 4,145 metres and total depth of 4,206 metres. No oil result yet; Victoria keeps its 20% near-free carry.

Value this in the calculator →Discuss in chat

17 Jan 2006drilling progress report● Neutral

Sun Resources reports casing finished at 913 metres and the blowout preventer being tested before drilling resumes. Target depth is expected in about 10 more days. Routine progress, with no new result.

Value this in the calculator →Discuss in chat

17 Jan 2006drilling progress report● Neutral

Victoria Petroleum reports the Eagle North-1 blowout preventer being tested at 913 metres. Drilling is due to resume within 12 hours, heading to a target near 4,145 metres and total depth of 4,206 metres. No new result.

Value this in the calculator →Discuss in chat

16 Jan 2006drilling progress report● Neutral

Victoria Petroleum, as operator, reports 10¾-inch casing run at 913 metres and the wellhead being welded on 15 January. Drilling is expected to resume within 48 hours toward 4,206 metres. No new result.

Value this in the calculator →Discuss in chat

16 Jan 2006drilling progress report● Neutral

Sun Resources reports Eagle North-1 reached its first casing point at 913 metres on 15 January. Casing is being run, with drilling to resume in about 48 hours toward 4,200 metres. Routine progress, with no oil result yet.

Value this in the calculator →Discuss in chat

13 Jan 2006drilling progress report● Neutral

Partner FAR (15% in Eagle) confirms Eagle North-1 is drilling at 828 feet and repeats the plan to reach 4,206 metres. It also reports its Louisiana Schwing A-1 well. Nothing new for Victoria Petroleum.

Value this in the calculator →Discuss in chat

13 Jan 2006drilling spud● Neutral

Partner Sun Resources confirms Eagle North-1 spudded 11 January California time and was drilling at 252 metres on 12 January. Target depth is 4,200 metres. This duplicates Victoria Petroleum's own spud announcement, with no new result.

Value this in the calculator →Discuss in chat

13 Jan 2006drilling spud▲ GoodMajor

Victoria Petroleum, as operator, confirms Eagle North-1 has spudded and was at 252 metres on 12 January. It targets 4,206 metres within 14 days. This starts the first appraisal of the Eagle Oil Pool since the 2001 well, where Victoria holds 20% with a near-free carry.

Value this in the calculator →Discuss in chat