12 Apr 2006drilling progress report● Neutral

Lightning-1 is drilling out from the 641-metre casing shoe to continue toward 2,007 metres. Targets are unchanged: the Murta and deeper Permian gas and oil. No results yet.

Value this in the calculator →Discuss in chat

11 Apr 2006drilling progress report● Neutral

Lightning-1 is cementing 9 5/8 inch casing at 641 metres. Targets remain the Murta at 1,307 metres and Permian Patchawarra at 1,927-1,967 metres, with total depth planned at 2,007 metres. No results yet.

Value this in the calculator →Discuss in chat

10 Apr 2006drilling spud● NeutralMajor

Lightning-1 began drilling on 7 April in PEL 115, testing a potential 23 million barrels of Murta oil in place plus deeper Permian targets of up to 130 bcf gas or 18 million barrels. Planned total depth is 2,007 metres in 14 days.

Value this in the calculator →Discuss in chat

7 Apr 2006investor presentation● Neutral

Victoria presented 'A Major Player in the Cooper Basin' to the SA Chamber of Mines. The visible text repeats known facts, including gross Mirage output of 430 barrels a day in March and a planned 1,000 in July. No new results.

Discuss in chat

3 Apr 2006drilling progress report▲ Good

Mirage-4 is being completed, to be perforated 1,320-1,338 metres. The first Mirage phase of three wells all found Murta hydrocarbons; production testing is due by mid-June. The rig moves to Lightning-1, which also targets deeper gas and oil.

Value this in the calculator →Discuss in chat

31 Mar 2006drilling progress report▼ Bad

Sun Resources says Eagle North-1 operations were halted after continuing mechanical problems and hole deterioration, and a new sidetrack was started at 4,028 metres. A conservative curve, liner and roughly 320-metre lateral are now planned, then a test. No oil result yet.

Value this in the calculator →Discuss in chat

31 Mar 2006drilling progress report● Neutral

Mirage-4 finished drilling at 1,447 metres and is preparing to run wireline logs. The Murta is still interpreted as 20 metres above the lowest known oil, pending logs. The up to 1,000 barrels a day by mid-2006 target is repeated.

Value this in the calculator →Discuss in chat

31 Mar 2006drilling progress report● Neutral

Victoria, as operator, said Eagle North-1 horizontal drilling restarted as a new sidetrack from 4,028 metres using a conservative medium radius curve. A 4.5 inch liner and then a 320-metre horizontal bore were planned, with up to 1,000 barrels a day anticipated if successful. No result yet.

Value this in the calculator →Discuss in chat

30 Mar 2006investor presentation● Neutral

Victoria attached a presentation on its 20 years of US exploration and production, for a conference on 31 March. It is background on US history and markets; the visible text shows no new results or figures.

Discuss in chat

30 Mar 2006well test result● Neutral

Mirage-4 reached total depth of 1,447 metres. Drill stem test 1 over the Murta recovered only 3 barrels of oil-cut mud, a small recovery. The well will be logged and completed for production testing, so its real rate is still unknown.

Discuss in chat

29 Mar 2006drilling progress report● Neutral

Drill stem test 1 is under way in the Mirage-4 Murta over 1,319-1,337 metres. The company repeats that the well came in high with oil shows and the up to 1,000 barrels a day target. No result yet.

Value this in the calculator →Discuss in chat

28 Mar 2006drilling progress report● Neutral

Mirage-4 is pulling out to run drill stem test 1 over the Murta from 1,319 to 1,337 metres, after oil shows continued for a further 9 metres. No test result yet; logs still to confirm the high interpretation.

Value this in the calculator →Discuss in chat

27 Mar 2006drilling progress report▲ Good

Mirage-4 has oil shows in the Murta sands, drilled to 1,337 metres, and is interpreted as the highest Murta intersection in the field, 20 metres above the lowest known oil. A drill stem test follows; wireline logs must confirm the interpretation.

Value this in the calculator →Discuss in chat

24 Mar 2006drilling progress report● Neutral

Mirage-4 is drilling ahead below 648 metres after testing the blow-out preventers. The production target is now stated as up to 1,000 barrels a day by mid-2006, back up from 800, and now tied to success at the follow-on Lightning and Jindivik wells.

Value this in the calculator →Discuss in chat

23 Mar 2006drilling progress report● Neutral

Mirage-4 ran and cemented 9 5/8 inch casing to 648 metres and is installing blow-out preventers. Target remains up to 800 barrels a day by mid-2006 from the current 400. No results yet.

Value this in the calculator →Discuss in chat

22 Mar 2006drilling progress report● Neutral

Impress's release repeats that Mirage-4 is preparing to run casing to 650 metres, with Victoria's target of up to 800 barrels a day by mid-2006. Impress's chairman says Lightning and Jindivik could allow up to 1,000 barrels a day. No results yet.

Value this in the calculator →Discuss in chat

21 Mar 2006drilling progress report▼ Bad

Sun Resources says Eagle North-1 horizontal drilling was delayed by mud motor, tool and mud circulation problems, still at 4,131 metres a week on. The plan is now a roughly 300-metre lateral, then a test. No oil result yet.

Value this in the calculator →Discuss in chat

21 Mar 2006drilling progress report▼ Bad

Victoria confirms Eagle North-1 horizontal drilling is delayed by mud motor, tool and circulation problems, still at 4,131 metres. It now plans a lateral of about 300 metres, then a test; up to 1,000 barrels a day is still anticipated if successful.

Value this in the calculator →Discuss in chat

21 Mar 2006drilling progress report● Neutral

Mirage-4 drilled to 650 metres and is preparing to run casing. The production target is now stated as up to 800 barrels a day by mid-2006, lowered from the earlier 1,000 target. No results yet.

Value this in the calculator →Discuss in chat

20 Mar 2006drilling spud● Neutral

Drilling started on Mirage-4 on 19 March, targeting the Murta at 1,325 metres. It is the next Mirage development well after Mirage-3, with Victoria (40%) still targeting 1,000 barrels a day by mid-2006.

Value this in the calculator →Discuss in chat

16 Mar 2006production update▲ Good

Victoria confirms Donga-3 is producing 40-70 barrels a day of oil from 100-120 barrels of fluid, with a one-month production test under way. It says Victoria's total net oil production is now about 420 barrels a day.

Discuss in chat

16 Mar 2006half year report▲ Good

Half-year to 31 December 2005 shows a profit of $538,319 against a $3.9m loss a year earlier. Cash was $5.43m and net assets $20.4m. The report notes the 115 million shares issued at 3 cents raised $3.45m.

Discuss in chat

15 Mar 2006investor presentation● Neutral

Victoria presented a Cooper Basin update at an industry forum, repeating known facts: 13 permits, up to 9 wells in 2006, and Mirage and Ventura output. It adds a June exploration program and Banff-1 in Queensland in May. No new results.

Discuss in chat

15 Mar 2006production update▲ Good

Oilex reports Donga-3 on pump since 11 March, with total fluid stabilising around 100-120 barrels a day, of which 40-70 is light oil. Victoria holds 15% of ATP 805P. This lists Bow and Oilex at 42.5% each, consistent with the earlier Bow release.

Discuss in chat

13 Mar 2006drilling progress report● Neutral

Sun Resources says Eagle North-1 horizontal drilling resumed after rig mechanical problems and is at 4,131 metres, still building the curve toward the Gatchell target. A drill stem test follows once the lateral is drilled. No flow result yet.

Value this in the calculator →Discuss in chat

13 Mar 2006drilling progress report▲ Good

Mirage-3 is being completed as a Murta oil producer after 7 inch casing was run to 1,653 metres, to be perforated at 1,320-1,330.5 metres. Victoria (40%) still targets 1,000 barrels a day by mid-2006. No production rate yet.

Value this in the calculator →Discuss in chat

10 Mar 2006drilling progress report● Neutral

Mirage-3 reached total depth of 1,661 metres and is pulling out to run logs. It repeats the earlier Murta test of about 324 barrels a day. No new results.

Value this in the calculator →Discuss in chat

9 Mar 2006drilling progress report● Neutral

Mirage-3 is drilling ahead at 1,566 metres toward the deeper Birkhead and Hutton targets, repeating the earlier 324 barrels-a-day Murta test. Total depth is planned at 1,668 metres. No new results.

Value this in the calculator →Discuss in chat

8 Mar 2006well test result▲ Good

Mirage-3's first test of the Murta flowed 27 barrels of clean oil in two hours, equal to about 324 barrels a day. Similar to producing Mirage-1, it extends the Mirage oil pool north; Victoria holds 40%.