Stockle - the stock oracle

Senex Energy Limited

ASX:SXY
A$4.60Latest close held · delayed
No price history held for this listing yet.
Market cap
—
Shares on issue
0
In-ground value
A$897m
Risked multiple
—
Story beats
408 since 2006
Last event
4 Apr 2022

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

13 Mar 2007drilling result▲ Good

Origin, the operator, reports the top of the Dongara Sandstone at 2,489 m, about 10 m updip of the previous highest well. Early logs suggest the full 31 m reservoir is likely oil-saturated. Confirms Victoria's release; Victoria holds 5%.

Value this in the calculator →Discuss in chat

9 Mar 2007half year report▼ Bad

Half-year to 31 Dec 2006: net loss $971,672 versus a $538,319 profit a year earlier. Cash was $4.99m plus $4.32m of held-for-trading investments. Shares were consolidated 1-for-10 in December, and 47.9m bonus options (25c, expiring Jan 2010) were issued on 1 Feb 2007.

Discuss in chat

8 Mar 2007drilling result● Neutral

Magellan's weekly report confirms Telowie-1 was plugged and abandoned at 1,384 m, with only minor Murta oil shows and a trace of oil on test. Rig released 4 March, ending the two-well PEL 94 program. Victoria holds 15%; the rest covers Magellan-only wells.

Value this in the calculator →Discuss in chat

7 Mar 2007drilling progress report● Neutral

Beach's weekly report shows Telowie-1 plugged and abandoned at 1,384 m, repeating the earlier dry-hole result. Other wells listed are not Victoria's. Victoria holds 15% of Telowie-1.

Value this in the calculator →Discuss in chat

7 Mar 2007flow test result● Neutral

Re-issue of the Margarita status report: El Viejito #1 flowed up to 210 mscfd and stabilised at 175 mscfd on a choked test; Dos Dedos #1 has 3.5 m of gas pay; Milagro #1 test due 7 March. Little new beyond the 6 March report. Victoria holds 20%.

Discuss in chat

7 Mar 2007drilling progress report● Neutral

Jingemia-11 is drilling ahead at 1,149 m toward a planned 2,614 m, about 20 days in total. Routine update with no result yet; Victoria holds 5%.

Value this in the calculator →Discuss in chat

6 Mar 2007drilling result▼ BadMajor

Telowie-1 was plugged and abandoned at 1,384 m after a Murta test recovered only 0.5 litres of oil, so it is not commercial. Focus in PEL 94 shifts to the Dunoon Horst, with drilling likely in the next few months. Victoria held 15%.

Value this in the calculator →Discuss in chat

6 Mar 2007flow test result▲ GoodMajor

El Viejito #1 flowed gas at up to 210 mscfd and stabilised at 175 mscfd on a choked test. Dos Dedos #1 found 3.5 m of gas pay in 3 zones. Gas contracts are being sought; Victoria holds 20%.

Discuss in chat

6 Mar 2007drilling result▼ BadMajor

Victoria confirms Gamma-1 reached 1,517 m with only minor oil shows and was plugged and abandoned. Nora-1 is delayed for review and a Watson 3D survey in April; two Barta wells are planned for the second half of 2007. Victoria is carried and keeps 25%.

Value this in the calculator →Discuss in chat

5 Mar 2007drilling result▼ BadMajor

Gamma-1 reached 1,517 m, found no significant oil shows in the primary targets, and was plugged and abandoned. It is the second dry Wompi well after Marracoonda-2. Nora-1 is delayed pending a Watson 3D seismic survey planned for April.

Value this in the calculator →Discuss in chat

1 Mar 2007drilling spud● Neutral

Origin announces Jingemia 11 commenced drilling and was at 195 m, targeting the Dongara Sandstone, planned to about 2,614 m. Its start time differs from Victoria's release (28 Feb versus 27 Feb). Victoria holds 5%.

Value this in the calculator →Discuss in chat

1 Mar 2007drilling spud▲ Good

Origin began drilling the Jingemia-11 development well on 27 Feb, planned to about 2,614 m. Victoria's managing director says success could lift field output to about 5,000 bopd. Victoria holds 5%. Follows Jingemia-8, stabilised at about 3,200 bopd.

Value this in the calculator →Discuss in chat

1 Mar 2007other● Neutral

ARC Energy cover note forwarding Origin's Jingemia 11 start announcement. It adds no new information.

Discuss in chat

1 Mar 2007drilling progress report● Neutral

Gamma-1 remains at 1,181 m while the rig's gearbox is repaired before drilling ahead. Routine update with no new result; Victoria is fully carried and keeps 25%.

Value this in the calculator →Discuss in chat

28 Feb 2007drilling progress report● Neutral

Victoria repeats Sun's update: a coiled tubing unit is at El Viejito #1 with flow test results expected in 4-5 days, a workover rig is due at Milagro, and the Dos Dedos rig has arrived. Victoria holds 20%.

Value this in the calculator →Discuss in chat

28 Feb 2007other● Neutral

Beach Petroleum weekly drilling report, a third-party document. It shows Telowie-1 drilling ahead at 1,306 m, with Victoria (VPE) at 15%. Nothing new.

Discuss in chat

28 Feb 2007drilling progress report● Neutral

Gamma-1 is at 1,181 m and drilling ahead toward the primary Namur and Hutton targets, planned to 1,504 m. Routine update with no new result; Victoria is fully carried and keeps 25%.

Value this in the calculator →Discuss in chat

27 Feb 2007drilling progress report● Neutral

Telowie-1 in PEL 94 is drilling ahead at 958 m toward a planned 1,367 m, with 6.6 mmbbl potential if oil is present. Routine update with no result yet; Victoria holds 15%.

Value this in the calculator →Discuss in chat

27 Feb 2007drilling result▼ Bad

Gamma-1's first drill stem test over 1,114-1,131 m recovered only a little formation water. Drilling will continue to the primary Namur and Hutton targets. Victoria is fully carried on the well and retains 25%.

Value this in the calculator →Discuss in chat

27 Feb 2007drilling progress report● Neutral

Sun Resources says a coiled tubing unit is on site at El Viejito #1 for a flow test, results expected in 4-5 days. Milagro #1 testing rig due 28 Feb; Dos Dedos #1 rig has arrived. Victoria holds 20%. Duplicates Victoria's own 28 Feb release.

Value this in the calculator →Discuss in chat

27 Feb 2007drilling result▼ Bad

Bow reports the Murta test at Gamma-1 recovered a little water with a faint oil odour. Preliminary results suggest the reservoir is tight and unlikely to hold commercial hydrocarbons. Drilling continues to the primary targets; Victoria is carried.

Value this in the calculator →Discuss in chat