25 Feb 2008drilling result● Neutral

Roma reports Paradise Downs-2 (PL 171, Victoria 20%) reached 504 m, was logged and plugged, with seven coal cores taken for gas testing. Netherland, Sewell engaged to advise on resource certification. No gas content results yet.

Value this in the calculator →Discuss in chat

22 Feb 2008asset acquisition disposition▲ GoodMajor

After the US operator's withdrawal, Victoria's West Florence interest rises to 41.67% in 12,000 acres and up to 29.17% in 13,000 acres, and it becomes operator. This is at little cost, and it plans to sell its US assets; buyers have expressed interest. A further well is planned for mid 2008.

Discuss in chat

22 Feb 2008asset acquisition disposition● Neutral

Adelaide Energy says the US operator and another minor participant withdrew from West Florence, Colorado, lifting its interest from 15% to 25% in 12,000 acres, and Victoria has taken over as operator. West Florence-1 is now making 5-10 bopd, down from 10-15 bopd.

Discuss in chat

19 Feb 2008production update● Neutral

Victoria, as Growler operator, reports the road due open 27 Feb and facility work resumed 12 Feb. It says flood preparations are in place and restates the 300 bopd test, 750 bopd development aim and Warhawk tie-in. No new result.

Discuss in chat

19 Feb 2008production update● Neutral

Impress's Growler update (PEL 104, Victoria operator 40%): road due open 27 Feb, facility work resumed 12 Feb. Flood peak still expected in about five weeks, possibly inundating the facility. Restates 300 bopd test rate and 7.7 mmbbl oil in place; repeats prior updates.

Discuss in chat

18 Feb 2008drilling progress report● Neutral

Paradise Downs-2, the second PL 171 core well (Victoria 20%), is coring ahead at 168 m toward a planned 400 m. Victoria now cites up to 22 further 2008 CSG wells, and Cooper oil drilling slipping to late March or early April.

Value this in the calculator →Discuss in chat

14 Feb 2008other● Neutral

Victoria's board advises shareholders to take no action on Odin's 15c small-holder offer without consulting a professional adviser. This is the board's first response to Odin's bid.

Discuss in chat

12 Feb 2008drilling result● Neutral

Roma reports Paradise Downs-1 reached 492 m with eleven coal cores taken for gas-content testing. The hole will be plugged after logging, and the rig moves to Paradise Downs-2. No gas results yet.

Value this in the calculator →Discuss in chat

12 Feb 2008production update▼ Bad

Victoria's Growler update: road works slowed by rain, no facility work last week due to access limits, and a flood peak may cut access and inundate the facility. Extended test expected at 300 bopd gross, with development toward 750 bopd if successful.

Discuss in chat

12 Feb 2008other● NeutralMajor

Odin Energy says it holds about 10% of Victoria, making it the largest shareholder, and offers 15c a share to holders under 10,000 shares, open to 12 March 2008. It wants to replace the non-executive directors and refocus on the Cooper Basin.

Discuss in chat

12 Feb 2008drilling result● Neutral

Paradise Downs-1 in PL 171 (Victoria 20%) finished coring at 492 m with eleven coal cores for gas testing. The rig moves to Paradise Downs-2. No gas content results are reported.

Value this in the calculator →Discuss in chat

12 Feb 2008production update● Neutral

Impress's Growler update repeats the road delays and facility stoppage from rain and flooding. It restates 300 bopd initial test rate and 7.7 mmbbl oil in place. Impress chairman is Eddie Smith, the shareholder seeking to remove Victoria's board (inference: same person).

Discuss in chat

8 Feb 2008capital raising announcement● Neutral

The Share Purchase Plan's second and final allotment issued 1,015,371 shares at 13c, about $132,000. Issued shares now total 278,383,275. This completes the SPP that closed 31 January 2008.

What it means for a shareholder

1.0m new shares at A$0.130 to raise about A$132,000. Shares on issue before the raise aren't in the record, so the dilution can't be worked out.

Create a free account to see this worked out for your own holding.

Discuss in chat

6 Feb 2008drilling spud● Neutral

Paradise Downs-1, the first of two core wells in PL 171 (Victoria 20%, Roma 80% operator), has started drilling. It is coring ahead to gain gas content data. Part of the 2008 CSG program that Victoria is funding from its placement and SPP.

Value this in the calculator →Discuss in chat

5 Feb 2008drilling progress report● Neutral

Roma reports the Paradise Downs-1 coal seam gas core well in PL 171 (Victoria 20%) is coring ahead at 126 m. Cores are for gas content testing.

Value this in the calculator →Discuss in chat

5 Feb 2008production update▼ Bad

Growler road works slowed by rain, and production facilities slipped to mid March. Cooper Creek floods may cut access and inundate the facility with up to a metre of water within about four weeks. Text gives initial test rate as 3000 bopd, apparently a typo for 300.

Discuss in chat

1 Feb 2008quarterly activities report● Neutral

December quarter: net production 16,222 boe (176 boe/day), net oil and gas cash flow $1.1m on gross sales of $1.6m. Plans repeated: 14 Cooper wells, up to 25 CSG wells in 2008. Growler test mid March; Warhawk-1 now mid 2008. PEL 115 partners have withdrawn.

Discuss in chat

1 Feb 2008other● Neutral

Barchester Pty Ltd and other shareholders have also asked directors to convene a general meeting under section 249D. Directors are seeking legal advice. This is a third requisition alongside Smith and Odin.

Discuss in chat

31 Jan 2008drilling spud▲ Good

Orallo North-2, the first of six core wells in the Don Juan CSG project (Victoria 45%), has started drilling, at 36 m. It will measure gas content for MHA certification toward the 200 PJ 2P target by end 2008.

Value this in the calculator →Discuss in chat

30 Jan 2008other▼ BadMajor

Odin Energy, via Glory Run, holding about 6.5% of Victoria, has requested a general meeting to remove directors Pett, Hoops and Wrixon and replace them with two Odin nominees. A second board challenge following the Smith letter.

Discuss in chat

30 Jan 2008other● Neutral

Glory Run, the Odin Energy subsidiary, has formally asked directors to call a general meeting under section 249D. Directors are taking legal advice. This continues the Odin challenge to the board.

Discuss in chat

30 Jan 2008investor presentation● NeutralMajor

Shareholder update: Growler road due late February and production facilities mid March 2008, then extended test at 300 bopd gross. Growler P50 oil in place now 7.7 mmbbl, recovery 1.6 mmbbl. PEL 115 partners Impress and Roma have withdrawn; Victoria seeks a farm-in for 25% free carry.

Discuss in chat

24 Jan 2008other▼ BadMajor

Victoria says shareholder Eddie Smith (3m shares) is soliciting support to requisition a general meeting to remove the four directors, including MD Kopcheff and chairman Pett, and appoint three of his nominees. The board will write to shareholders.

Discuss in chat

21 Jan 2008capital raising announcement▲ Good

Greenearth Energy closed its IPO with commitments meeting the $10m minimum, with allotment expected 24 January and ASX listing early February 2008. Victoria describes its holding as a seed investment.

Discuss in chat

17 Jan 2008investor presentation▲ Good

Shareholder status report restating plans: 18 Don Juan CSG wells from February 2008 targeting up to 200 bcf gross, 7 wells in other CSG permits, and 14 Cooper Basin wells. Growler oil field due on production February 2008. Mostly repeats known plans (text truncated).

Discuss in chat

15 Jan 2008drilling result▲ GoodMajor

Carnarvon-1, the third Don Juan CSG well, has about 13.5 m of coal and free gas flows from 74 m. MHA approved a certification program of six core holes and eight firm plus four contingent pilot wells, targeting 200 PJ of 2P reserves by end 2008.

Value this in the calculator →Discuss in chat

11 Jan 2008capital raising announcement● Neutral

The Share Purchase Plan closing date was extended again, to a final close of 31 January 2008. No amounts are given in this notice.

Discuss in chat

7 Jan 2008drilling result▼ BadMajor

Schoenfield #1 at El Fatso reached 13,371 ft; gas readings were elevated but there is not enough sand reservoir for commercial gas, so it is being plugged and abandoned. A dry hole for the 20% committed first well. Victoria turns to Margarita and West Florence.

Value this in the calculator →Discuss in chat

27 Dec 2007drilling progress report● Neutral

Schoenfield #1 (El Fatso, Victoria 20%) is drilling at 7,944 ft after setting casing at 7,379 ft as planned. The first target zone is expected near 11,000 ft, with TD about 13,740 ft.