Each one in plain English, with the numbers worked through for a shareholder.
2 Nov 2007capital raising announcement● Neutral
Lakes Oil and Victoria announce Greenearth's prospectus for a $15m IPO (up to $20m with oversubscriptions, $10m minimum), with $8m priority for Lakes and Victoria shareholders at 12 November 2007. Closes 14 December. Repeats the Victoria announcement.
Victoria confirms drilling began at Taringa South-1, the first Don Juan coal seam gas well, as planned from October. Flow testing and further pilot wells could lead to reserve certification early in 2008. Victoria holds 45%. Repeats the operator's report.
Operator Bow reports drilling started at Taringa South-1, the first of three Don Juan coal seam gas wells (two firm), 250-450 m deep. Wells will be suspended for flow testing, with reserve certification possible from early 2008. Victoria holds 45%.
Corporate presentation for the Mining 2007 conference. It repeats known facts: share price 13c, market cap $28m, cash and investments $7.1m with no debt, and a 14-well Cooper Basin program. No new information (text partly truncated).
2007 annual report. The supplied text is truncated, so no financial statements are available. The managing director's letter estimates calendar 2007 net revenue of $5m (against $6.9m in 2006) and $7m in 2008, with Growler starting at up to 300 bopd in December.
Fall River (15% partner) repeats that West Florence-1 started oil production on pump at 32 bopd plus 101 barrels of water from the Codell. A second well targeting the Pierre Shale is planned. Repeats the operator's update.
Partner Adelaide Energy (15%) repeats that West Florence-1 began producing 32 bopd with 101 barrels of water, with a higher oil rate expected as water handling is added. Repeats the operator's update.
West Florence-1 in Colorado began oil production on pump at 32 bopd and 101 barrels of water from the Codell, following the October pump plan. A Pierre Shale well and a 3D seismic survey are planned. Victoria holds 25%.
Greenearth Energy, the geothermal company 16.33% owned by Victoria, signed a non-binding agreement with RMIT to plan geothermal technology work and seek grants. Greenearth plans to list in December 2007, with an entitlement for Victoria shareholders.
Formal farm-in agreement signed with Santos and Avery for ATP 752P, firming up the August letter of intent. Seven wells plus at least 300 sq km of 3D seismic (about $18.5m) fully carried; Victoria keeps 15%. Santos operates, first wells from Q1 2008.
Cover letter to shareholders with an October 2007 status report: 14 Cooper Basin wells planned over 12 months, Growler production in December, and coal seam gas drilling at Don Juan from October. Also offers electronic annual reports. Largely repeats known plans.
Partner Adelaide Energy repeats that West Florence-1 will go on pump in coming days and a further well is planned, likely air-drilled to the Pierre formation only. Repeats the operator's update.
Impress confirms Ascender-1 reached 2,093 m with no hydrocarbon indications over the primary targets, and the well is being plugged. Its CEO points to Gannet, Warhawk and a Growler extended production test by year end. Repeats the operator's dry result.
Ascender-1 was dry: logs and cores found no hydrocarbons in the Birkhead sand at 1,726 m, and it will be plugged at 2,093 m. Victoria (40%) now focuses on starting Growler at about 300 bopd in December 2007, then Gannet and Warhawk in 1H 2008.
Swabbing at West Florence-1 finished, recovering oil and water from four zones between 5,400 and 5,700 ft; a pump goes in during October 2007 to produce from the Codell. A further well is planned. Victoria holds 25%.
Ascender-1 at 1,919 m showed no oil in the primary Birkhead sandstone; the managing director called results 'not encouraging', to be confirmed by logs and cores. Gannet and Warhawk are still planned for first half 2008.
Annual financial report for the year to 30 June 2007. The supplied text is truncated after the directors' report introduction, so no financial figures are available here; the board is unchanged (Pett, Kopcheff, Hoops, Wrixon).
Victoria Petroleum, as operator, reports Ascender-1 began drilling 20 September 2007 in PEL 111, at 160 m by morning. Targets are Birkhead (P50 recoverable 2.6 mmbbl), Hutton and Namur. Duplicates the earlier Impress spud notice; Victoria holds 40%.
Impress reports Ascender-1 spudded 20 September in PEL 111 on Ensign Rig 20, to 2,100 m, about 16 days. It is the first PEL 111 well and the next step along the Jurassic oil fairway north of Growler. Birkhead P50 recoverable is 2.6 mmbbl.
Further Flour Bluff workover success: D-13 raised to 1.86 mmcfd gas equivalent, Smith #1 added 0.31 mmcfd, with about 2.5 mmcfd added in total. D-24 fracture stimulation is now set for December 2007.
Lakes Oil and Victoria, each holding 33% of Greenearth Energy, announced Simon Molesworth AM QC as non-executive chairman of Greenearth. Greenearth is working toward an IPO later in the year, consistent with the earlier capital raising plan.
Lancer-1 was plugged and abandoned; a Permian oil show was seen but judged non-commercial. Another dry result for Victoria's 40% PEL 115 program. The rig moves 220 km to Ascender-1 in PEL 111, starting in about ten days.
Lancer-1 reached total depth of 2,170 m and was preparing wireline logs. No hydrocarbon shows were observed while drilling; sidewall cores will give the final answer.
Lancer-1 was at 2,165 m with no hydrocarbon shows seen in any target while drilling. Sidewall cores at total depth will give the final evaluation. Early sign is unfavourable.