Stockle - the stock oracle

Senex Energy Limited

ASX:SXY
A$4.60Latest close held · delayed
No price history held for this listing yet.
Market cap
—
Shares on issue
0
In-ground value
A$897m
Risked multiple
—
Story beats
408 since 2006
Last event
4 Apr 2022

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

26 May 2008drilling result▼ Bad

Origin reports Freshwater Point 1 reached 1,817 m with the High Cliff Sandstone at about 1,647 m. No hydrocarbon shows were seen in the primary or secondary targets. Early sign of a dry hole for Victoria's 5%.

Value this in the calculator →Discuss in chat

22 May 2008drilling progress report● Neutral

Origin reports Freshwater Point 1 (Victoria 5%) drilling ahead at 1,158 m in the Kockatea Shale, after resuming on 21 May. Planned depth is 1,761 m. There is no result yet.

Value this in the calculator →Discuss in chat

15 May 2008drilling progress report● Neutral

Origin's Freshwater Point 1 update: surface casing is set at 412 m and the well will drill ahead. Victoria holds 5%. It carries no new result.

Value this in the calculator →Discuss in chat

12 May 2008drilling spud● Neutral

Origin's release on Freshwater Point 1, Perth Basin, spudded 11 May, with 12¼-inch hole to 414 m. Planned depth is 1,761 m in about 10 days. Victoria holds 5%. Re-release of the operator's announcement.

Value this in the calculator →Discuss in chat

12 May 2008drilling spud● Neutral

Freshwater Point 1 (EP 413, Victoria 5%) spudded on 11 May, targeting the High Cliff Sandstone. Victoria puts the mean prospect at 9 bcf gas or 6.1 million barrels of oil, with P10 of 19 bcf or 13 million barrels. It is a risky exploration well.

Value this in the calculator →Discuss in chat

9 May 2008drilling result▼ Bad

Victoria relays Bow's Donga-4 result in ATP 805P (Victoria 15%): the swab recovered 27.5 barrels, mostly completion fluid with no hydrocarbons. The well is suspended, and stimulation may be considered later. Duplicate of the Bow release.

Value this in the calculator →Discuss in chat

9 May 2008drilling result▼ Bad

Bow's Donga-4 swab test in ATP 805P recovered 27.5 barrels of mostly completion fluid and no hydrocarbons. The well is suspended. The reservoir appears tight or compartmentalised and unlikely to flow commercially without stimulation. Victoria holds 15%.

Value this in the calculator →Discuss in chat

6 May 2008drilling result▲ GoodMajor

Cuisinier-1 is an oil discovery: 6 m net pay in the Murta Formation, cased as a producer. Production is expected early Q3 2008 via Santos infrastructure. It is Victoria's first Queensland Cooper oil producer, and Hudson-1 is due in June.

Value this in the calculator →Discuss in chat

23 Apr 2008drilling spud● Neutral

Cuisinier-1 began drilling on 21 April, the first well of Santos's 7-well ATP 752P program, where Victoria is fully carried and keeps 15%. Planned depth is 2,513 m in 15 days, testing up to 2.1 million barrels unrisked.

Value this in the calculator →Discuss in chat

4 Apr 2008drilling progress report● Neutral

Don Juan CSG weekly: Orallo North-3 reached 320 m and will be cased as a production well. Orallo South-1 is being partly re-drilled as a core well, with casing at 282 m and a target of 535 m. The 200 PJ 2P goal by end 2008 is unchanged.

Value this in the calculator →Discuss in chat

1 Apr 2008farm in farm out agreement▲ GoodMajor

Enterprise Energy announces that Victoria's subsidiary and Enterprise's will take over PEL 88 interests from Cooper, Sundance and Liberty on renewal, ending at 50% each. Victoria (currently 10%) would operate. Subject to ministerial renewal and approval.

Value this in the calculator →Discuss in chat

17 Mar 2008drilling progress report▼ Bad

Don Juan North-2 oil twin (Victoria 24%) reached 360 m with only residual oil shows; live oil appears to have leaked away and it was suspended as a water well. Orallo South-1 cored to 195 m amid mechanical delays.

Value this in the calculator →Discuss in chat

11 Mar 2008drilling progress report● Neutral

Bow's weekly report: Orallo South-1 (Don Juan CSG, Victoria 45%) spudded 6 March as a core well. Don Juan North-2 oil twin (Victoria 24%) reached the oil zone top at 324 m. Target remains 200 PJ 2P by end 2008.

Value this in the calculator →Discuss in chat

29 Feb 2008drilling spud● Neutral

Taringa South-2, the second of six Don Juan CSG core wells (Victoria 45%, Bow operator), has started drilling after Orallo North-2 reached 347 m and was suspended. Targets 200 PJ 2P by end 2008, certified by MHA. Core results will feed certification.

Value this in the calculator →Discuss in chat

26 Feb 2008drilling result● Neutral

Victoria repeats that Paradise Downs-2 (PL 171, Victoria 20%) finished coring at 504 m with seven cores taken for gas testing, and Netherland, Sewell is engaged on certification. Up to 23 further 2008 CSG wells are cited. No gas results yet.

Value this in the calculator →Discuss in chat

25 Feb 2008drilling result● Neutral

Roma reports Paradise Downs-2 (PL 171, Victoria 20%) reached 504 m, was logged and plugged, with seven coal cores taken for gas testing. Netherland, Sewell engaged to advise on resource certification. No gas content results yet.

Value this in the calculator →Discuss in chat

18 Feb 2008drilling progress report● Neutral

Paradise Downs-2, the second PL 171 core well (Victoria 20%), is coring ahead at 168 m toward a planned 400 m. Victoria now cites up to 22 further 2008 CSG wells, and Cooper oil drilling slipping to late March or early April.

Value this in the calculator →Discuss in chat

12 Feb 2008drilling result● Neutral

Roma reports Paradise Downs-1 reached 492 m with eleven coal cores taken for gas-content testing. The hole will be plugged after logging, and the rig moves to Paradise Downs-2. No gas results yet.

Value this in the calculator →Discuss in chat

12 Feb 2008drilling result● Neutral

Paradise Downs-1 in PL 171 (Victoria 20%) finished coring at 492 m with eleven coal cores for gas testing. The rig moves to Paradise Downs-2. No gas content results are reported.

Value this in the calculator →Discuss in chat

6 Feb 2008drilling spud● Neutral

Paradise Downs-1, the first of two core wells in PL 171 (Victoria 20%, Roma 80% operator), has started drilling. It is coring ahead to gain gas content data. Part of the 2008 CSG program that Victoria is funding from its placement and SPP.

Value this in the calculator →Discuss in chat

5 Feb 2008drilling progress report● Neutral

Roma reports the Paradise Downs-1 coal seam gas core well in PL 171 (Victoria 20%) is coring ahead at 126 m. Cores are for gas content testing.

Value this in the calculator →Discuss in chat