Stockle - the stock oracle

Senex Energy Limited

ASX:SXY
A$4.60Latest close held · delayed
No price history held for this listing yet.
Market cap
—
Shares on issue
0
In-ground value
A$897m
Risked multiple
—
Story beats
408 since 2006
Last event
4 Apr 2022

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

4 Dec 2013drilling progress report▲ Good

November report: 12 oil wells drilled since 1 July, 10 cased for future production. Burruna-3 found new Birkhead oil, Acrasia-6 has good shows, Vintage Crop-3 is still drilling, and the western flank program, including Growler-12 and -13, is next. Mostly repeats known results.

Value this in the calculator →Discuss in chat

29 Nov 2013resource reserve update▲ GoodMajor

Senex books its first Murta Formation contingent oil resource: 4.9 mmbbl 2C (1.6 1C, 10.4 3C) net, with up to 82.6 mmbbl oil in place, independently assessed by DeGolyer and MacNaughton. A pilot horizontal well is planned, with initial results expected this financial year.

Value this in the calculator →Discuss in chat

22 Nov 2013well test result▲ GoodMajor

Worrior-8 (PPL 207, Senex 70%) flowed gas at 0.7 MMscf/d and stabilised oil at 670 bopd from the Patchawarra, a new oil accumulation at the field. Reinterpretation suggests it may extend across the field. The well is shut in for pressure build-up testing.

Discuss in chat

22 Nov 2013well test result▲ Good

Cooper Energy, holding 30% of PPL 207, forwards Senex's Worrior-8 announcement: Patchawarra gas at 0.7 MMscf/d and oil at 670 bopd. A re-release of the Senex news with no new information.

Discuss in chat

21 Nov 2013asset acquisition disposition● Neutral

AOC settles its PEL 182 dispute by selling its 7.5% interest to Senex and Drillsearch for $3.75m, of which Dome receives $2m and AOC $1.75m. Senex's share of the cost and resulting stake are not stated in this text.

Discuss in chat

20 Nov 2013drilling result▲ GoodMajor

Burruna-3 (PEL 115, Senex 80%) reached 1,664 m, confirmed the Namur oil of Burruna-2 and found about 3 m of net pay in a new lower Birkhead accumulation, pending logging. This is a positive appraisal result for the field discovered with Burruna-2.

Value this in the calculator →Discuss in chat

12 Nov 2013drilling result● Neutral

Tellus's final report: Pirie-1 (PEL 105) was cased and suspended as a potential Birkhead oil producer; the rig was released 9 Nov. It missed its Tirrawarra target after engineering problems and logs show poor sand quality. Senex holds 50% subject to approval, rising to 70% after a further well by 30 June 2014.

Value this in the calculator →Discuss in chat

6 Nov 2013drilling progress report▲ Good

Orca forwards Senex's update: Burruna-3 appraisal (Orca 20%) spuds later this week, 564 m southeast of Burruna-2, to about 1,666 m. Burruna-2 is flowing at a constrained 1,000 bopd.

Value this in the calculator →Discuss in chat

6 Nov 2013drilling progress report● Neutral

October report: Dunlop-1 (1,200 bopd) to be completed in November; Sprigg-1 cased with 6.3 m Murta pay; Pirraminta-2 dry; Pirie-1 cased as a potential Birkhead producer after oil shows. Burruna-3 starts this week; Spitfire-4, Vintage Crop-3, Acrasia-6 to follow.

Value this in the calculator →Discuss in chat

4 Nov 2013drilling result▲ GoodMajor

Sprigg-1 in PEL 514 reached 2,472 m and intersected 6.3 m of interpreted net pay in the Murta Formation, plus shows in the Arrabury and Birkhead. Casing is being run; further cased-hole tests depend on rig availability.

Value this in the calculator →Discuss in chat

4 Nov 2013drilling result▼ BadMajor

Pirraminta-2 in PEL 514 reached 1,771 m and found no significant hydrocarbons. It was cased and suspended as a future water well. This is a dry hole, and the second of the two farm-in wells due by end November 2013.

Value this in the calculator →Discuss in chat

30 Oct 2013investor presentation● Neutral

Citi conference presentation by CEO Ian Davies recaps the three-year growth story and the 15-year tenure scheme. It says Burruna-2 is producing about 1,000 bopd, and Dunlop-1 will be on production this quarter. Largely repeats known facts.

Discuss in chat

25 Oct 2013asset acquisition disposition▲ GoodMajor

Orca completes sale of its 20% of PEL 115 to Senex (except Fury and Burruna blocks per earlier terms). Senex's 115,000,000 Orca shares were cancelled, and Senex nominee Denis Patten resigned from Orca's board. This completes the Orca deal that was awaiting approvals.

Discuss in chat

23 Oct 2013drilling progress report● Neutral

Sprigg-1 is preparing to run casing and plan a drill stem test over an interpreted 6.3 m net log pay in the Murta Formation from 1,593 m. No test result yet.

Value this in the calculator →Discuss in chat

22 Oct 2013drilling spud● Neutral

Pirraminta-2 in PEL 514 spudded on 22 October, planned to 1,740 m. It is the second of two wells Senex must drill by end November 2013 under the Planet Gas farm-in.

Value this in the calculator →Discuss in chat

21 Oct 2013drilling progress report● Neutral

Sprigg-1 in PEL 514 reached total depth of 2,470 m on 20 October and is being logged. It is the first of the two wells Senex must drill by end November 2013; Planet Gas is free carried.

Value this in the calculator →Discuss in chat

18 Oct 2013drilling spud● Neutral

Planet Gas says Pirraminta-2 in PEL 514 (Senex 80% operator, Planet Gas 20% free carried) is about to spud, targeting the Murta Formation to 1,740 m. Sprigg-1 spudded 6 October and was at 1,546 m. Both count toward the farm-in's two wells due by end November 2013.

Value this in the calculator →Discuss in chat

16 Oct 2013director officer appointment● Neutral

Senex signs a new employment contract with MD and CEO Ian Davies, replacing all prior arrangements, as foreshadowed in the 2013 Remuneration Report. Terms are in the AGM notice of meeting; this announcement gives no figures.

Discuss in chat

15 Oct 2013drilling progress report● Neutral

Tellus weekly report: Pirie-1 (PEL 105, Senex 50% subject to approval) is at 1,922 m after cementing surface casing and drilling 764 m this week. Continuing toward a 3,100 m target. No results yet.

Value this in the calculator →Discuss in chat

15 Oct 2013production update▲ Good

Orca (20% partner) repeats that Burruna-2 started an extended production test after flowing over 3,600 bopd, restricted to about 800 bopd, with about 400,000 barrels recoverable in the Namur. Burruna-3 to be drilled in early November.

Discuss in chat

15 Oct 2013production update▲ GoodMajor

Burruna-2 (PEL 115, Senex 80%) began an extended production test after flowing over 3,600 bopd, restricted to about 800 bopd for now. Namur estimated at about 400,000 barrels recoverable if appraisal succeeds. Burruna-3 appraisal well follows Pirraminta-2.

Discuss in chat

10 Oct 2013drilling result▲ GoodMajor

Dunlop-1 in PEL 113 (Senex 100%) is a new oil discovery, flowing 1,200 barrels a day from about 3 m of McKinlay pay; up to 9 m of Murta pay is still to be tested. TD 1,469 m. It will produce this quarter.

Value this in the calculator →Discuss in chat

8 Oct 2013drilling progress report● Neutral

Tellus weekly report: Pirie-1 (PEL 105, Senex 50% subject to approval) reached 1,158 m, with surface casing delayed when it stuck at 850 m. Drilling continues toward a 3,100 m target. No results yet.

Value this in the calculator →Discuss in chat

2 Oct 2013drilling progress report▲ Good

September report: in the first three months of the program six wells were drilled and five cased as future producers. Kobari-2, Acrasia-7 (6.3 m net pay) and Ventura-2 (13.4 m net pay) are cased and suspended; Burruna-2 is being completed. Dunlop-1 spudded 1 October; Pirie-1 spudded 30 September.

Value this in the calculator →Discuss in chat

2 Oct 2013drilling progress report▲ Good

Orca forwards Senex's September drilling report: Burruna-2 (Orca 20%) is completed for production, with an extended test due next week. Also notes 18 m of Murta core with free oil and fluorescence over 14 m. Other well details repeat known results.

Value this in the calculator →Discuss in chat

26 Sept 2013other● Neutral

Senex removes the quarter-end trading blackout from its securities trading policy, because ASX reclassified it as a producing entity from 1 January 2013. The board keeps discretion to impose blackouts. Administrative change only.

Discuss in chat

11 Sept 2013farm in farm out agreement▲ GoodMajor

Tellus Resources agrees to farm out PEL 105 in the Cooper Basin to Senex. Senex gets 50% by paying $3.5m towards the Pirie-1 well, and rises to 70% (Tellus 30%) by funding another well by 30 June 2014, subject to ministerial approval. Tellus cites up to 3 million barrels recoverable.

Value this in the calculator →Discuss in chat

4 Sept 2013drilling progress report● Neutral

Orca forwards Senex's August drilling report, highlighting Burruna-2 (Orca 20%) as a future oil producer with over 750 barrels a day in testing. Repeats known results.

Value this in the calculator →Discuss in chat

4 Sept 2013drilling progress report▲ Good

August report: Ventura-2 (PPL 214, 100%) is cased as a future producer with about 12 m net pay; Burruna-2 is cased and suspended; Acrasia-7 is drilling. Mustang-1 is being recompleted with a high-rate pump. Kobari-2, Dunlop-1, Sprigg-1 and Acrasia-6 are next.

Value this in the calculator →Discuss in chat

4 Sept 2013drilling scheduled● Neutral

Planet Gas says Sprigg-1 in PEL 514 (Senex 80% operator, Planet Gas 20%) will spud in late September 2013, targeting 2,464 m. It is the first of two wells Senex must drill by November 2013 under the farm-in.

Value this in the calculator →Discuss in chat