Stockle - the stock oracle

Pancontinental Oil & Gas NL

ASX:PCL
A$0.009Latest close held · delayed
No price history held for this listing yet.
Market cap
—
Shares on issue
0
In-ground value
A$26.36bn
Risked multiple
—
Story beats
159 since 2006
Last event
14 July 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

30 Nov 2017investor presentation● Neutral

AGM presentation recaps the Bombora deal, the Africa Energy A$10m deal, Dempsey testing and the Cormorant 2018 drilling decision. It notes the lowest Dempsey sand flowed dry gas, with commercial rates still to be proved. Repeats known facts.

Discuss in chat

27 Nov 2017drilling scheduled▲ GoodMajor

PEL 37 joint venture voted to drill the Cormorant prospect offshore Namibia, targeting spud 1 September 2018. PCL keeps an effective 20% carried through the well, estimated at US$35m. Best-estimate unrisked prospective resource is 124 MMbbl. Still needs ministry endorsement and licence renewal.

Value this in the calculator →Discuss in chat

22 Nov 2017drilling spud▲ GoodMajor

Tulainyo 2-7 appraisal well has started drilling, planned to about 1,700m in under a month. It tests the gas discovery that could not be tested in 2015. PCL's net interest on completing the earn-in is 13.33%. No results yet.

Value this in the calculator →Discuss in chat

16 Nov 2017drilling scheduled● Neutral

Ensign Rig 587 is mobilising to Tulainyo 2-7, with drilling to start shortly. The well is planned to about 1,700m and should take under a month. PCL's 40%-owned subsidiary is earning up to 33.33% (13.33% net).

Value this in the calculator →Discuss in chat

14 Nov 2017flow test result● NeutralMajor

First Dempsey-1 test, of the thin lowest zone, flowed dry gas to surface without stimulation, but at rates sub-commercial at current gas prices. The CEO calls it encouraging given poor log quality. The next shallower zone is being prepared for testing. PCL holds 10%.

Discuss in chat

14 Nov 2017flow test result● Neutral

Operator Sacgasco repeats the first Dempsey 1-15 test result: clean dry gas, no water, at sub-commercial rates from the thin lowest zone. Testing continues upward, with tests not ordered by expected quality. Repeats PCL's release.

Discuss in chat

1 Nov 2017drilling progress report● Neutral

Operator Sacgasco says Dempsey 1-15 completion work continues. Some safety-critical equipment had to be replaced after tests, and the well must be cleaned out before the lowest zone is perforated. No test results yet. PCL holds 10%.

Value this in the calculator →Discuss in chat

30 Oct 2017annual report● Neutral

2017 Annual Report for year to 30 June 2017. Chairman's review says the Bombora deal (July 2017) adds near-term gas projects, and Africa Energy's Namibian investment brought in US$2.2m. A$1.8m was raised in the year. Text truncated, so no financials summarised.

Discuss in chat

30 Oct 2017other● Neutral

Appendix 4G governance checklist lodged with the annual report, stating the corporate governance statement is on pages 34-46 and on the website. Administrative filing with no new substance.

Discuss in chat

19 Oct 2017drilling progress report● Neutral

The completion rig has arrived at Dempsey 1-15 after re-completing a nearby producing well. Testing will start from the bottom of the well; the gas meter is ready. No test results yet.

Value this in the calculator →Discuss in chat

9 Oct 2017other● Neutral

Partner Xstate's company update repeats that Dempsey 1-15 is cased for testing late October and that no performance guidance is possible until then. Notes the Dempsey area interests (PCL 10%) and the Alvares evaluation after testing. Nothing new from PCL.

Discuss in chat

4 Oct 2017drilling progress report● Neutral

Operator is moving the drilling rig off Dempsey 1-15 and bringing in a smaller completion rig. The first perforation and flow test is expected towards the end of October 2017. Delay-type logistics only; no result.

Value this in the calculator →Discuss in chat

29 Sept 2017annual report● Neutral

Full-year statutory accounts for year to 30 June 2017, including the directors' report and board changes in July 2017 (Kennedy chair, Begg CEO). Text provided is truncated, so no financial figures are summarised here.

Discuss in chat

20 Sept 2017drilling scheduled▲ Good

Permit to drill is issued and Ensign Rig 587 contracted for Tulainyo 2-7, due to spud late October 2017. All funds are already advanced to the operator. PCL is earning an effective 13.33% via Gas Fields LLC.

Value this in the calculator →Discuss in chat

18 Sept 2017drilling result▲ Good

PCL relays the operator's Dempsey-1 release: well completed at 2,970m, logs confirm gas-saturated deeper zones, flow testing next. CEO says testing is essential to prove commercial rates, but the well shows signs of being the planned breakthrough. Repeats operator news.

Value this in the calculator →Discuss in chat

18 Sept 2017drilling result▲ GoodMajor

Wireline logs on Dempsey 1-15 show gas-saturated sands consistent with the earlier gas shows, and a 5½-inch liner is cemented. Flow testing of multiple zones should start in 2-3 weeks; commercial flow rates are unproven. PCL holds 10%.

Value this in the calculator →Discuss in chat

14 Sept 2017investor presentation● Neutral

Good Oil Conference presentation pitches a fully funded three-well program with A$3.1m cash and a further A$7.0m due at the next Namibian well spud. Mostly restates known facts, with the Africa Energy deal the new item; also shows 5.26bn shares on issue at 12 Sept.

Discuss in chat

14 Sept 2017farm in farm out agreement▲ GoodMajor

Africa Energy Corp took a one-third stake in PCL's Namibian subsidiary, which holds the 30% of PEL 37, for US$7.7m (about A$10m). US$2.2m was received at closing 11 Sept and US$5.5m is due at the next PEL 37 well spud. PCL keeps two-thirds.

Value this in the calculator →Discuss in chat

13 Sept 2017drilling progress report● Neutral

Dempsey 1-15 finished drilling at 2,970m, shallower than the earlier ~3,200m plan, after two further zones of high gas shows. The hole is being conditioned for wireline logging; results are not yet known. PCL holds 10%.

Value this in the calculator →Discuss in chat

8 Sept 2017drilling progress report▲ Good

Operator reports drilling through hard siltstone into a potential sandstone reservoir with the 'most significant' gas shows so far in Dempsey 1-15, now below 2,760m. Significance still depends on wireline logs; not a quantified result. PCL holds 10%.

Value this in the calculator →Discuss in chat

4 Sept 2017drilling progress report● Neutral

Operator says Dempsey 1-15 is drilling below 2,615m with more significant gas shows, about 580m from target depth, and is 9-10 days behind schedule. Farm-in funding caps are reached, so all partners including PCL (10%) now fund their share of costs. Significance awaits logs.

Value this in the calculator →Discuss in chat

31 Aug 2017drilling progress report▲ Good

Dempsey 1-15 is drilling below 2,440m with further significant gas shows, about 750m from target depth. Operator cautions that which reservoir has been reached is not definitive until logging. No quantified result yet.

Value this in the calculator →Discuss in chat

30 Aug 2017investor presentation● Neutral

PCL releases an independent analyst report by Peter Strachan and a CEO audio interview. Promotional links only; no new company information.

Discuss in chat

30 Aug 2017drilling progress report▲ Good

Partner Xstate relays Sacgasco's update that Dempsey 1-15, drilling below 2,300m, found new significant gas shows in an unexpected sandstone. Operator says logs at total depth will show what they mean. PCL holds 10%.

Value this in the calculator →Discuss in chat

28 Aug 2017drilling progress report▲ Good

Dempsey 1-15 is drilling at 2,070m with multiple significant gas shows, the best over 500 times background gas. Operator says significance is unknown until logs are run at total depth. Shows are not a result.

Value this in the calculator →Discuss in chat

25 Aug 2017drilling progress report● Neutral

Operator says Dempsey 1-15 has resumed drilling below the 9 5/8-inch casing at about 1,760m after pressure equipment was tested. About 1,300m remain to 3,200m target depth. No new result.

Value this in the calculator →Discuss in chat

21 Aug 2017drilling result▲ GoodMajor

Logs confirm four gas-bearing sandstone zones between 1,000 and 1,560m in Dempsey 1-15, with 30-50 feet of net pay. Operator expects the gas could cover well costs. Intermediate casing set at about 1,760m. Deeper primary targets still to drill. PCL holds 10%.

Value this in the calculator →Discuss in chat

21 Aug 2017drilling result▲ Good

PCL relays the operator's confirmation of four interpreted gas zones in Dempsey-1's upper targets. CEO says this supports the seismic mapping and bodes well for deeper targets. Repeats the operator release.

Value this in the calculator →Discuss in chat

15 Aug 2017other● Neutral

PCL notes that broker Hartleys has issued an updated research note after the Dempsey-1 spud. Link only; no new company information.

Discuss in chat

14 Aug 2017drilling progress report▲ Good

Operator reports Dempsey 1-15 at about 1,300m with multiple interpreted significant gas shows in the shallow producing-field sandstones. Not yet quantified; logs are due within a week. Early encouraging sign, not a result.

Value this in the calculator →Discuss in chat