11 Oct 2007drilling progress report● Neutral

Pancontinental relays the operator's update: Stokes Bay-1 at 1,841 m after a stuck-pipe incident was cleared, now running in with a new bit. No new results.

Value this in the calculator →Discuss in chat

11 Oct 2007drilling progress report● Neutral

Operator ARC reports Stokes Bay-1 drilled to 1,841 m after pipe stuck at 858 m was freed. Running in with a new bit; no hydrocarbon indications yet.

Value this in the calculator →Discuss in chat

11 Oct 2007drilling progress report● Neutral

Partner Empire summarises Valentine-1 as having excellent Anderson gas shows, possibly at the edge of the accumulation. Says the joint venture is considering deepening Stokes Bay-1 to test the Nullara carbonates. Well is at 1,841 m.

Value this in the calculator →Discuss in chat

4 Oct 2007drilling spud● Neutral

Partner Empire repeats the Stokes Bay-1 spud and drilling at 1,226 m. Empire maps the target about 150 m updip from Valentine-1 and sees mainly gas, with possible oil, in the Anderson sands. Duplicate of operator data.

Value this in the calculator →Discuss in chat

4 Oct 2007drilling spud▲ Good

Pancontinental confirms the Stokes Bay-1 sidetrack started on 3 October, with the company holding 10% of the Canning Basin permits. Battrick says the well will meet the Valentine-1 gas-show intervals substantially updip.

Value this in the calculator →Discuss in chat

4 Oct 2007drilling spud● Neutral

Partner FAR repeats the operator's report: Valentine-1 sidetracked as Stokes Bay-1 on 3 October, drilling ahead at 1,226 m toward about 2,500 m. Duplicate of operator data.

Value this in the calculator →Discuss in chat

4 Oct 2007drilling spud▲ GoodMajor

Operator ARC reports Valentine-1 was plugged and abandoned, and the Stokes Bay-1 sidetrack spudded on 3 October from 975 m, now drilling at 1,226 m. Target is the Anderson gas sands about 90 m updip of Valentine-1's strong gas shows.

Value this in the calculator →Discuss in chat

4 Oct 2007drilling spud● Neutral

Partner Emerald repeats the operator's report that Stokes Bay-1 spudded on 3 October and is drilling at 1,226 m, targeting about 100 m updip of Valentine-1's gas shows. Duplicate of operator data.

Value this in the calculator →Discuss in chat

27 Sept 2007drilling progress report● Neutral

Pancontinental reports logging has begun at Valentine-1's final depth of 3,430 m. Battrick looks forward to the Stokes Bay-1 sidetrack, calling the Anderson and Laurel shows very encouraging.

Value this in the calculator →Discuss in chat

27 Sept 2007drilling progress report● Neutral

Partner Empire repeats that Valentine-1 is at 3,430 m with wireline logging under way. Says Stokes Bay-1 is 5.5 km along strike and 120-150 m updip from the 1992 Point Torment-1 gas discovery (4.3 MMcf/d).

Value this in the calculator →Discuss in chat

27 Sept 2007drilling progress report● Neutral

Partner Emerald forwards the operator's 27 September drilling report: Valentine-1 at 3,430 m, logging under way, no hydrocarbon indications listed. Duplicate of operator data.

Value this in the calculator →Discuss in chat

27 Sept 2007drilling progress report● Neutral

Partner FAR repeats the operator's 27 September report: Valentine-1 at 3,430 m with wireline logging under way, and the Stokes Bay-1 sidetrack planned to about 2,500 m. Duplicate of operator data.

Value this in the calculator →Discuss in chat

25 Sept 2007drilling result▼ Bad

Pancontinental confirms Valentine-1 final depth 3,430 m, with tight Virgin Hills sandstones and no significant shows, so the primary target looks unsuccessful pending logs. Battrick calls the shallower gas shows highly encouraging for Stokes Bay-1.

Value this in the calculator →Discuss in chat

25 Sept 2007drilling result▼ Bad

Partner Empire repeats the operator's report of final depth at 3,430 m with no significant Virgin Hills shows. Says the strong gas shows significantly upgrade gas prospectivity at Stokes Bay-1. Duplicate of operator data.

Value this in the calculator →Discuss in chat

25 Sept 2007drilling result▼ Bad

Partner FAR repeats the operator's report: Valentine-1 final depth 3,430 m, lack of porosity and shows in Virgin Hills, logging next. Restates the Stokes Bay-1 sidetrack plan. Duplicate of operator data.

Value this in the calculator →Discuss in chat

25 Sept 2007drilling result▼ BadMajor

Operator ARC calls Valentine-1 final depth at 3,430 m because the Virgin Hills target sandstones were tight with no significant hydrocarbon shows. Earlier strong Anderson and Laurel gas shows are called encouraging for Stokes Bay-1, to follow by sidetrack.

Value this in the calculator →Discuss in chat

25 Sept 2007drilling result▼ Bad

Partner Emerald repeats the operator's report: Valentine-1 final depth 3,430 m, Virgin Hills target tight with no significant shows. Notes the shallower gas shows enhance Stokes Bay-1 prospects. Duplicate of operator data.

Value this in the calculator →Discuss in chat

24 Sept 2007drilling progress report● Neutral

Partner Emerald repeats the operator's 24 September report: Valentine-1 at 3,377 m, rig repaired, drilling ahead at 3,382 m. Duplicate of operator data.

Value this in the calculator →Discuss in chat

24 Sept 2007drilling progress report● Neutral

Partner FAR repeats the operator's report of Valentine-1 drilling ahead at 3,382 m after the rig repair; Virgin Hills sandstones not yet intersected. Duplicate of operator data.

Value this in the calculator →Discuss in chat

24 Sept 2007drilling progress report● Neutral

Partner Empire repeats the operator's report: top drive repaired, Valentine-1 drilling ahead at 3,382 m, Virgin Hills sandstones not yet reached. Duplicate of operator data.

Value this in the calculator →Discuss in chat

24 Sept 2007drilling progress report● Neutral

Pancontinental reports Valentine-1 drilling ahead below 3,382 m after rig repairs, through tight dolomites with minor gas. Virgin Hills target not yet penetrated. Statement shows cash of A$3.6m and 444m shares.

Value this in the calculator →Discuss in chat

24 Sept 2007drilling progress report● Neutral

Operator ARC reports Valentine-1 reached 3,377 m before a top drive hydraulic failure on 22 September; repaired, drilling ahead at 3,382 m. Virgin Hills sandstones still not intersected.

Value this in the calculator →Discuss in chat

20 Sept 2007drilling progress report● Neutral

Partner Empire repeats the operator's 20 September report: Valentine-1 at 3,241 m, Virgin Hills top now expected near 3,315 m. Duplicate of operator data.

Value this in the calculator →Discuss in chat

20 Sept 2007drilling progress report● Neutral

Partner FAR repeats the operator's Valentine-1 report (3,241 m, Virgin Hills now expected near 3,315 m) alongside updates on its Louisiana wells. Nothing new on Pancontinental's interest.

Value this in the calculator →Discuss in chat

20 Sept 2007drilling progress report● Neutral

Operator ARC reports Valentine-1 at 3,241 m after a bit change. The top of the Virgin Hills target is now expected slightly deeper, about 3,315 m, which ARC calls not structurally significant.

Value this in the calculator →Discuss in chat

17 Sept 2007drilling progress report● Neutral

Partner Emerald repeats the operator's report of Valentine-1 at 3,234 m in tight limestones with minor gas; Virgin Hills not yet reached. Duplicate of operator data.

Value this in the calculator →Discuss in chat

17 Sept 2007drilling progress report● Neutral

Partner FAR repeats the operator's report of Valentine-1 drilling ahead at 3,234 m, Virgin Hills not yet reached, and restates the Stokes Bay-1 sidetrack plan. Duplicate of operator data.

Value this in the calculator →Discuss in chat

17 Sept 2007drilling progress report● Neutral

Operator ARC reports Valentine-1 at 3,234 m on 17 September, drilling tight Devonian limestones with minor gas. The Virgin Hills target sandstones have not yet been reached.

Value this in the calculator →Discuss in chat

17 Sept 2007drilling progress report● Neutral

Partner Empire repeats the operator's 17 September report: Valentine-1 at 3,234 m in tight Devonian limestones with minor gas; Virgin Hills sandstones not yet reached. Duplicate of operator data.

Value this in the calculator →Discuss in chat