Stockle - the stock oracle

Norwest Energy NL

ASX:NWE
A$0.056Latest close held · delayed

Past year: ▲ 60%(3.50c – 6.80c AUD)

Market cap
A$389m
Shares on issue
6.95bn
In-ground value
A$950m
Risked multiple
0.72×
Story beats
194 since 2006
Last event
12 May 2023

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

23 July 2009drilling spud● Neutral

Origin, as operator, relays that the Jingemia-12 development well began drilling on 18 July 2009 and was at 675 m. Norwest holds 1.278% of the Jingemia field.

Value this in the calculator →Discuss in chat

22 June 2009farm in farm out agreement▲ GoodMajor

Norwest gained the right to earn 60% of the Hurst Castle permits (PEDL 089 and P1153) in southern England by part-funding a 2009 work programme estimated at GBP60,000, and will become operator. The permits lie between its Dorset and Isle of Wight licences.

Value this in the calculator →Discuss in chat

2 June 2009drilling result▲ GoodMajor

Puffin-13 found live oil in both main reservoir sands at depths consistent with Puffin-9, showing the oil-bearing structure is continuous. The rig is being demobilised. The JV will evaluate combined pools and development options, which matters for Norwest's 1.25% royalty.

Value this in the calculator →Discuss in chat

19 May 2009drilling result● NeutralMajor

Great Auk-1 finished at 3522 m. The hydrocarbon found was a wet gas with high condensate, the first gas discovery on the Puffin permit, but AED says volumes are unlikely to be commercial at this stage. The rig moved to the Puffin-13 appraisal well.

Value this in the calculator →Discuss in chat

12 May 2009drilling progress report● Neutral

Great Auk-1 reached 3520 m and passed through the Vulcan formation without finding hydrocarbons. Drilling continues to deeper sands, and testing of the earlier hydrocarbon interval is planned at total depth.

Value this in the calculator →Discuss in chat

7 May 2009drilling result▲ GoodMajor

AED reports Great Auk-1, drilled by the Puffin JV, found a 6-7 m hydrocarbon column in the first target sand at 2200 m. Drilling continues to deeper targets, and a second well may be an appraisal updip of Puffin-9. Norwest holds a 1.25% royalty over the permit.

Value this in the calculator →Discuss in chat

12 Feb 2009farm in farm out agreement● Neutral

Empire's own release on the EP368/EP426 equity swap. It would be operator of the combined venture and plans to mature the North Erregulla prospect for an updip North Erregulla-2 well. Confirms the heads of agreement signed 6 February.

Value this in the calculator →Discuss in chat

10 Feb 2009farm in farm out agreement● NeutralMajor

Norwest signed a heads of agreement with Empire Oil & Gas to swap equity so it holds 20% of both EP368 and EP426. ARC and Origin intend to assign their EP368 interests to Norwest, and the deal needs WA regulator consent. EP368 permit expired 10 Feb; renewal sought.

Value this in the calculator →Discuss in chat

9 Jan 2009drilling result▼ BadMajor

Puffin-12 ST3 hit oil-bearing LK1A sand at about 2033 m, but the oil column is too thin to complete, with oil price and economics also considered. The NE well will be suspended. Remediation of Puffin-7 and possibly Puffin-8 is likely in Q2 2009. Negative for the royalty.

Value this in the calculator →Discuss in chat

12 Dec 2008drilling progress report● Neutral

Puffin-12's last pilot hole found residual oil in an isolated block far to the east, completing the appraisal objective. The well will now be sidetracked to drill a horizontal production section. No commercial result yet.

Value this in the calculator →Discuss in chat

8 Dec 2008drilling progress report● Neutral

Puffin-12's first pilot hole found only residual oil in a downthrown block to the south-east. The well is sidetracking north for more appraisal before a horizontal production section. A mildly disappointing early result for the royalty.

Value this in the calculator →Discuss in chat

24 Nov 2008drilling progress report● Neutral

Puffin-12 has set casing at 950 m and its pilot hole to the first target was at 2,005 m on 21 November. Drilling is on plan. No results yet for Norwest's 1.25% royalty.

Value this in the calculator →Discuss in chat

17 Nov 2008drilling progress report● Neutral

Puffin-12, the second well in the Puffin programme, has spudded in the north-east and was at 491 m on 13 November. Progress is on plan. Norwest's 1.25% royalty applies to the field.

Value this in the calculator →Discuss in chat

6 Oct 2008drilling result▲ Good

Puffin-11 found a new oil zone with a gross column of about 25 m, the thickest seen in the Puffin field, in high-permeability rock. The well is being sidetracked to test deeper targets and drill a horizontal production section. Builds on the 30 September oil strike.

Value this in the calculator →Discuss in chat

1 Oct 2008resource reserve update▲ GoodMajor

An independent review puts Cobra's most likely gas in place above 300 BCF. Half or more may be recoverable, subject to successful flow testing. This follows the April-May well that did not flow commercially; the joint venture is weighing options to reach commercial rates.

Value this in the calculator →Discuss in chat

30 Sept 2008drilling result▲ GoodMajor

Puffin-11 hit an oil-bearing sand at 2013 m with a movable oil column over 20 m, reported by AED. Rock quality is still being assessed. Norwest's 1.25% royalty applies, so this is a positive first sign for the Puffin royalty after the Wisteria dry hole.

Value this in the calculator →Discuss in chat

16 Sept 2008drilling result▼ BadMajor

Wisteria-1 reached 3,281 m and found no significant hydrocarbon shows in the Plover, the last target. The joint venture will log, plug and abandon it. A dry hole for Norwest's 15%, about 6% of cost.

Value this in the calculator →Discuss in chat

8 Sept 2008drilling progress report▼ Bad

Wisteria-1 at 2,886 m has drilled through the Montara sandstone with no reservoir-quality sandstone or significant shows. Only the deeper Plover target remains.

Value this in the calculator →Discuss in chat

8 Sept 2008drilling spud▲ Good

Puffin-11 has spudded, starting a roughly 100-day program with Puffin-12 in the north-east. Puffin-11 tests two earlier discoveries in the south-west. Norwest's 1.25% royalty applies to any resulting production.

Value this in the calculator →Discuss in chat

1 Sept 2008drilling result▼ Bad

Bounty repeats the Wisteria-1 update: no reservoir-quality Puffin sandstone or significant shows, drilling on to the deeper Montara and Plover targets. Partner re-release of known news.

Value this in the calculator →Discuss in chat

1 Sept 2008drilling result▼ BadMajor

Wisteria-1 passed through the main Puffin Formation target (the 174 mmbbl P50 case) without reservoir-quality sandstone or significant hydrocarbon shows. At 2,019 m, it continues to the deeper Montara and Plover targets (21-32 mmbbl P50).

Value this in the calculator →Discuss in chat

1 Sept 2008drilling result▼ Bad

Adelphi repeats that Wisteria-1 found no reservoir-quality Puffin sandstone, calling it a disappointment that suggests the play edge lies further west. Deeper Montara and Plover targets remain. Duplicate of Norwest's update.

Value this in the calculator →Discuss in chat

22 Aug 2008drilling spud▲ GoodMajor

The West Atlas rig is on location to spud Wisteria-1 on 22 August, in 97 m of water to about 3,323 m. Targets total over 200 million barrels potential (Puffin P50 174 mmbbl). Norwest's 15% costs about 6% of dry-hole cost.

Value this in the calculator →Discuss in chat

20 Aug 2008drilling scheduled▲ Good

Reversing the delay, Wisteria-1 could now spud as early as 23-24 August, due to weather and Montara scheduling. Dates depend on operator Coogee's rig schedule.

Value this in the calculator →Discuss in chat

4 Aug 2008drilling scheduled▼ Bad

Partner Adelphi reports Wisteria-1 delayed from early August to Q1 2009, because operator Coogee needs the rig for urgent work on the Montara platform. Adelphi says it is virtually free-carried.

Value this in the calculator →Discuss in chat