Stockle - the stock oracle

Norwest Energy NL

ASX:NWE
A$0.056Latest close held · delayed

Past year: ▲ 60%(3.50c – 6.80c AUD)

Market cap
A$389m
Shares on issue
6.95bn
In-ground value
A$950m
Risked multiple
0.72×
Story beats
194 since 2006
Last event
12 May 2023

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

6 Apr 2022admin correction● Neutral

Re-release of the 6 April $18 million placement and share purchase plan announcement, correcting the incorrect title only. No other changes.

Discuss in chat

6 Apr 2022investor presentation● Neutral

Presentation supporting the capital raising, repeating Lockyer Deep-1 results and the 92 km2 area. It shows 6.6B shares, 3.8c price, A$251M market cap and about A$20M pro forma cash with no debt. Little new information.

Discuss in chat

1 Apr 2022director officer appointment● Neutral

Board proposes 30 million performance rights for Managing Director Iain Smith, in three 10 million tranches: a 2C contingent resource above 1.6 Tcf at Lockyer Deep, and 30-day share price averages of 5.5c and 7.0c. Needs shareholder approval at a general meeting.

Discuss in chat

1 Apr 2022well test result● Neutral

The extended Lockyer Deep-1 flow test ran through 31 March 2022. The well will now be shut in for about six days of pressure build-up monitoring, then suspended for future completion as a producer. No new flow figures.

Discuss in chat

30 Mar 2022drilling result● Neutral

Ringneck 2D seismic survey (148 line-km) is complete, focused on the southeast of the Lockyer Deep field, including Lead E. Preliminary processed data is expected within four months, after which the joint venture will decide whether drillable targets exist.

Value this in the calculator →Discuss in chat

28 Mar 2022flow test result▲ GoodMajor

Lockyer Deep-1 flowed at a maximum 117 mmscfd (102 mmscfd sustained) with condensate of about 6 bbl/mmscf and low CO2 and H2S. The company calls it the highest-rate Perth Basin Permian gas well so far; flow was stopped due to sand. This confirms the 2021 discovery's deliverability.

Discuss in chat

28 Mar 2022flow test result▲ Good

Operator Mineral Resources reports an instantaneous maximum flow of 117 mmscf/d at Lockyer Deep-1, with condensate of 5-6 bbl/mmscf and low impurities. It plans more wells and seismic over 12-18 months. Confirms the 2021 discovery's deliverability.

Discuss in chat

14 Mar 2022well test result▲ Good

Lockyer Deep-1 was perforated over 10-12 March 2022 and flowed strong dry gas at stable wellhead pressure above 4,800 psi, with 4-4.5% CO2. The full six-day production test is now due around 25 March, after the earlier delays.

Discuss in chat

11 Mar 2022half year report● Neutral

Half-year to 31 Dec 2021 shows a net loss of $926,512, up from $305,705 a year earlier. It notes Norwest gave notice to withdraw from TP/15 effective 6 Dec 2021 (assignment still pending) and that January option exercises raised $2,908,403.

Discuss in chat

4 Mar 2022drilling scheduled▼ Bad

Cyclone Anika delayed the Buru Energy Rafael-1 well test, so the Lockyer Deep-1 test package is now expected to mobilise from the week of 21 March 2022, later than the 9 March target. Perforating starts the week of 7 March; Ringneck 2D acquisition begins 7 March.

Value this in the calculator →Discuss in chat

23 Feb 2022drilling progress report● Neutral

Lockyer Deep-1 is conditioned for perforation, but perforation is postponed by contractor delays. The test still targets about 9 March 2022. Ringneck 2D crews begin mobilising 3 March, with acquisition due to finish by end of March.

Value this in the calculator →Discuss in chat

22 Feb 2022admin correction● Neutral

Issuing 714,285 shares at 0.6c to correct an administrative error, where one option holder's $4,285.71 exercise payment was not converted to shares. Minor administrative fix.

Discuss in chat

15 Feb 2022drilling scheduled● Neutral

Lockyer Deep-1 production testing is scheduled for about 9 March 2022 and should take roughly two weeks. The 148 line-km Ringneck 2D seismic survey starts 24 February, and the 385 km2 Rococo 3D survey is planned from December 2022.

Value this in the calculator →Discuss in chat

6 Jan 2022well test result● Neutral

A cement bond log confirmed the remedial cementing was satisfactory, resolving the earlier cementing problem. Testing is now waiting on equipment and crew, with WA border controls causing delays; the operator targets starting before end of February 2022.

Discuss in chat

22 Dec 2021security holder rights change● Neutral

Reminder letters sent to holders of listed options NWEOB, exercisable at 0.6c until 24 January 2022. Quotation ceases 18 January. Shares closed at 2.2c on 20 December, well above the exercise price.

Discuss in chat

30 Nov 2021investor presentation● Neutral

Notice of a live investor webinar on 7 December 2021, where the Managing Director will review the AGM presentation. No new information.

Discuss in chat

22 Nov 2021investor presentation● Neutral

AGM presentation by the Managing Director repeating known points: Lockyer Deep-1 discovery, 92 km2 area, production test early Q1 2022 and appraisal in 2022. Shows about 5.5 billion shares and a A$132 million market capitalisation at 2.4c. No new information.

Discuss in chat

15 Nov 2021resource reserve update▲ GoodMajor

Revised mapping lifts the Lockyer Deep potential resource area 40%, from 66 to about 92 km2, by including the southern part previously treated as separate prospective ground. No volume is given; the operator's interpretation is broadly consistent.

Value this in the calculator →Discuss in chat

10 Nov 2021other● Neutral

Mandatory JobKeeper disclosure: Norwest received $39,000 for two employees in FY2021 and $0 in FY2020, and made no repayments. Administrative notice with no bearing on the exploration story.

Discuss in chat

2 Nov 2021drilling progress report● Neutral

Rig released and Lockyer Deep-1 suspended for testing, with testing now due by early Q1 2022. Total well cost is about A$18.5 million against the original A$14.5 million estimate, though the company says remediation costs were within the original estimate.

Value this in the calculator →Discuss in chat

22 Oct 2021annual report▲ Good

Annual report for the year to 30 June 2021. The chairman calls the year 'transformational' after the Lockyer Deep-1 gas discovery, expects resources to exceed the 1.1 Tcf pre-drill high case, and targets production testing before year-end and seismic surveys in early 2022.

Discuss in chat

22 Oct 2021admin correction● Neutral

Appendix 4G governance checklist for the year to 30 June 2021, pointing to the corporate governance statement on pages 17-22 of the annual report. Administrative filing with no new substance.

Discuss in chat

18 Oct 2021drilling progress report▼ Bad

The cement bond log confirmed where cement sits in the annulus, and a remedial cementing job is planned. Production testing of Lockyer Deep-1 is targeted for late Q4 2021 but may slip to early Q1 2022, a possible delay.

Value this in the calculator →Discuss in chat

12 Oct 2021drilling progress report▲ Good

Milling cleared cement from the 5-1/2" casing, and a significant amount of cement is now confirmed to have been displaced into the annulus, easing the earlier concern. A cement bond log will decide any further remedial work before testing.

Value this in the calculator →Discuss in chat

27 Sept 2021drilling progress report▼ Bad

Cement was not displaced into the annulus when the production casing was run, so it is being milled out and re-cemented. Extra cost for the joint venture is up to A$5 million (Norwest share up to A$1 million). Production test is still targeted for Q4 2021.

Value this in the calculator →Discuss in chat

27 Sept 2021annual report● Neutral

Annual financial report for the year to 30 June 2021, listing the board and officers already known. Provided text is truncated, so no financial results can be reported from it.

Discuss in chat

22 Sept 2021resource reserve update▲ GoodMajor

Logs confirm 20.2 m net gas pay in the Kingia, 16% porosity and ~500 mD permeability, with a gas column up to 800 m. Norwest expects resources to exceed the 1.12 Tcf pre-drill high case; well being completed for testing. High Cliff is not pay at this location.

Value this in the calculator →Discuss in chat

8 Sept 2021drilling result▲ GoodMajor

Lockyer Deep-1 reached 4,274 m, with preliminary results indicating a significant gas discovery in good-quality Kingia Sandstone and no gas-water contact seen. Wireline logging is under way; this is the first drilling success after the long search for a rig. Norwest holds 20%.

Value this in the calculator →Discuss in chat

30 Aug 2021capital raising announcement▲ GoodMajor

Completed a placement of up to 343.75 million shares at 0.8c to raise up to $2.75 million, significantly oversubscribed, with the four largest holders (Mineral Resources ~19.7%) taking part. Funds production testing, seismic and working capital.

What it means for a shareholder

344m new shares at A$0.008 to raise about A$2.8m. That's 6.3% dilution: every existing holder's slice gets 6.3% smaller. If you held A$1,000 of shares (125,000 at the issue price), your slice goes from 0.00244% to 0.00229% of the company. To keep it you'd need 8,393 more shares - about A$67 at the issue price.

Create a free account to see this worked out for your own holding.

Discuss in chat

30 Aug 2021drilling progress report▲ Good

Final-section drilling began 28 August. Oil shows were seen across a 158 m interval in the Dongara and Wagina formations, with gas readings up to 19.6%. These are secondary targets; net oil pay is too early to call pending logs.

Value this in the calculator →Discuss in chat