Stockle - the stock oracle

Karoon Energy Ltd

ASX:KAR
A$1.53Close 7 Oct 2026 · delayed

Past year: ▼ 4%(1.46 – 2.19 AUD)

Market cap
A$850m
Shares on issue
554m
In-ground value
A$6.29bn
Risked multiple
3.24×
Story beats
234 since 2006
Last event
12 Aug 2026

Announcements, explained

Each one in plain English, with the numbers worked through for a shareholder.

24 June 2013regulatory community update▲ GoodMajor

Peru approved the environmental study for Block Z-38, allowing up to 10 exploration and 10 appraisal wells. At least two wells are planned, starting late in the first half of 2014, and Karoon is discussing farming down its 75%. This clears a key permitting step.

Discuss in chat

21 June 2013drilling progress report● Neutral

Proteus-1ST1 returned to drilling at 4494 m after blowout preventer testing passed and cement plugs were set and drilled out. This resolves the earlier well control difficulty. No reservoir result yet.

Value this in the calculator →Discuss in chat

18 June 2013regulatory community update▲ Good

A 2,386 sq km 3D seismic survey over WA-482-P began on 10 June 2013, expected to take about 56 days, with preliminary results towards end-2013. Karoon is still completing the transfer to reach 100%. A drilling decision is needed before permit year three.

Discuss in chat

12 June 2013drilling progress report▼ Bad

Proteus-1 sidetrack (ST1) was drilled to 4493 m when well control difficulties occurred. Blowout preventer testing and work to regain control come before drilling resumes. No reservoir result yet.

Value this in the calculator →Discuss in chat

3 June 2013investor presentation● Neutral

June review repeats known points: Kangaroo and Bilby oil discoveries, Browse gas results and Proteus-1 drilling. New figures are market capitalisation about A$1.5bn at A$6.75 and Peru drilling expected by early 2014. Cash A$210m is the 30 April figure.

Discuss in chat

27 May 2013drilling result▲ GoodMajor

Karoon completed its three-well Santos Basin campaign, with Bilby-1 finishing at 4,416 m and no further zones found. Two oil discoveries (Kangaroo-1, Bilby-1) from three wells, net cost about A$30m after Pacific Rubiales. Karoon is now seeking a rig for multi-well appraisal.

Value this in the calculator →Discuss in chat

23 May 2013drilling progress report▼ Bad

Proteus-1 hit drilling difficulties at 4740 m. The hole was plugged back and a sidetrack is being prepared, with drilling expected to resume within 24 hours. No reservoir result yet.

Value this in the calculator →Discuss in chat

10 May 2013drilling result▲ GoodMajor

Bilby-1's proven oil column grew to 320 m, with a potential gross column of about 560 m and roughly 70 m of net oil-bearing reservoir. Oil sampled is 33 degree API. Drilling continues to 4573 m after wireline testing.

Value this in the calculator →Discuss in chat

6 May 2013drilling result▲ GoodMajor

Bilby-1 found oil in Maastrichtian-age sands, confirmed over 200 m gross so far. This is Karoon's second Santos Basin oil discovery after Kangaroo-1. The well continues to 4573 m, and a rig for Kangaroo-2 and a Bilby follow-up is expected in the fourth quarter.

Value this in the calculator →Discuss in chat

1 May 2013investor presentation● Neutral

May review repeats known points. New figures: cash A$210m at 30 April 2013 and market value about A$928m at A$4.20, against A$6.60 and A$1.46bn in February. Peru drilling is now expected by early 2014.

Discuss in chat

19 Apr 2013drilling progress report● Neutral

Bilby-1 was drilling at 1626 m after setting 20-inch casing at 1190 m. Karoon also qualified as an 'Operator A', allowed to operate exploration in any water depth in Brazil. No well result yet.

Value this in the calculator →Discuss in chat

19 Apr 2013drilling progress report● Neutral

Proteus-1 was drilling the 12-1/2 inch section at 4166 m, with no result yet. The Browse campaign is stated as a minimum of five wells through 2013.

Value this in the calculator →Discuss in chat

11 Apr 2013resource reserve update▲ GoodMajor

Karoon booked a Kangaroo contingent resource of 2 million barrels (1C), 73 million (2C) and 337 million (3C), after post-drill seismic showed over 600 m of updip potential. Kangaroo-2 appraisal could lift the 1C figure.

Value this in the calculator →Discuss in chat

8 Apr 2013drilling spud● NeutralMajor

Bilby-1, the third and final Santos Basin well, spudded on 7 April 2013 in block S-M-1166, targeting Santonian, Campanian and Eocene levels. It runs into May and completes minimum work commitments. Karoon is still seeking a rig for Kangaroo-2.

Value this in the calculator →Discuss in chat

5 Apr 2013asset acquisition disposition● NeutralMajor

Karoon will not use its pre-emptive right over ConocoPhillips' sale of 20% of Browse permits WA-315-P and WA-398-P to PetroChina, clearing PetroChina's entry. The joint venture also extended the Transocean Legend rig contract to six firm wells; Proteus-1 was at 2913 m.

Discuss in chat

28 Mar 2013farm in farm out agreement▲ GoodMajor

Pacific Rubiales exercised its option for a 35% interest in Santos Basin block S-M-1166 (Bilby). It will fund the first US$70m of Bilby-1 costs, then 35% thereafter, taking its total well carry to US$210m. Still subject to ANP approval.

Value this in the calculator →Discuss in chat

25 Mar 2013drilling result▼ BadMajor

Emu-1 reached 4381 m and found good reservoirs, but the main ones are water-bearing at this location, with only possible thin hydrocarbon sands. This is a disappointment after the Kangaroo-1 oil find. A discovery notification is being filed with ANP, and Bilby-1 is next.

Value this in the calculator →Discuss in chat

25 Mar 2013drilling spud● Neutral

Proteus-1, the third well of the Browse campaign, spudded on 25 March 2013 in WA-398-P, about 14 km southeast of Poseidon-1. Karoon holds 40% and ConocoPhillips operates. The campaign is at least five wells through 2013.

Value this in the calculator →Discuss in chat

13 Mar 2013drilling result▲ GoodMajor

Zephyros-1 reached 5372 m and found gas-bearing Plover sands similar to Kronos-1, with good quality and high mobility. The joint venture will not run a production test, as the results resemble Kronos-1. The rig moves to Proteus-1.

Value this in the calculator →Discuss in chat

8 Mar 2013half year report▼ Bad

Half-year to 31 December 2012 shows a loss of A$8.7m versus a A$2.7m profit a year earlier. Foreign currency losses of A$1.6m, against a A$4.9m gain before, and lower interest income (A$4.2m versus A$8.0m) contributed. Operations repeat known items.

Discuss in chat

7 Mar 2013asset acquisition disposition● NeutralMajor

ConocoPhillips agreed to sell PetroChina a 20% interest in the Browse permits WA-315-P and WA-398-P (including Poseidon). Karoon has pre-emptive rights over that 20%, lapsing at the start of April, and is assessing its position.

Discuss in chat

26 Feb 2013drilling progress report● Neutral

Zephyros-1 hit a sandstone with sandy cuttings and higher gas readings, indicating a potential gas-bearing reservoir. Coring is about to start, with wireline logging to follow. This is an early indication only, not a confirmed discovery.

Value this in the calculator →Discuss in chat

20 Feb 2013drilling progress report● Neutral

Zephyros-1 drilled the 8-1/2" hole from 4000 m to 4822 m and cemented a 7-5/8" liner. It is drilling out the shoe to start the 6-1/2" section through the target. No reservoir result yet.

Value this in the calculator →Discuss in chat

11 Feb 2013investor presentation● Neutral

February review restates known points: Kangaroo-1 oil, Emu-1 spud, Pacific Rubiales farm-out (subject to approval) and WA-482-P. New figures: cash A$228m at 31 December 2012, market value about A$1.46bn at A$6.60. Text truncated.

Discuss in chat

11 Feb 2013drilling spud● Neutral

Emu-1, Karoon's second Santos Basin well after the Kangaroo-1 oil find, spudded on 10 February 2013. It targets Santonian, Campanian and Miocene levels and runs into early April. Bilby-1 is expected to follow as the third well.

Value this in the calculator →Discuss in chat

5 Feb 2013drilling progress report● Neutral

Zephyros-1 drilled the 12-1/4" hole from 2918 m to 4007 m and set 9-5/8" casing at 4000 m after the cyclone suspension. It is now running in to drill the 8-1/2" section toward the reservoir. No reservoir result yet.

Value this in the calculator →Discuss in chat

31 Jan 2013drilling result▲ GoodMajor

Kangaroo-1 wireline work confirms a 25 m gross oil column of 42 degree API oil, with good reservoir quality (25-32% porosity). Mapping suggests a column over 300 m up-dip. No flow test will be run at this down-dip spot; Karoon is seeking a rig for a Kangaroo-2 appraisal well.

Value this in the calculator →Discuss in chat

25 Jan 2013drilling result▲ GoodMajor

Kangaroo-1, Karoon's first Santos Basin well, found light oil: a 25 m gross column in Eocene rocks at 3049 m, not the primary target. The well hit it 300 m down dip, and the whole trap could hold about 350 m. Testing decision follows logging.

Value this in the calculator →Discuss in chat